Author: National Research Council
Publisher: National Academies Press
ISBN: 9780309074056
Category : Nature
Languages : en
Pages : 134
Book Description
In 1988, the U.S. Army Corps of Engineers began an investigation of the benefits and costs of extending several locks on the lower portion of the Upper Mississippi River-Illinois Waterway (UMR-IWW) in order to relieve increasing waterway congestion, particularly for grain moving to New Orleans for export. With passage of the Flood Control Act of 1936, Congress required that the Corps conduct a benefit-cost analysis as part of its water resources project planning; Congress will fund water resources projects only if a project's benefits exceed its costs. As economic analysis generally, and benefit-cost analysis in particular, has become more sophisticated, and as environmental and social considerations and analysis have become more important, Corps planning studies have grown in size and complexity. The difficulty in commensurating market and nonmarket costs and benefits also presents the Corps with a significant challenge. The Corps' analysis of the UMR-IWW has extended over a decade, has cost roughly $50 million, and has involved consultations with other federal agencies, state conservation agencies, and local citizens. The analysis has included many consultants and has produced dozens of reports. In February 2000, the U.S. Department of Defense (DOD) requested that the National Academies review the Corps' final feasibility report. After discussions and negotiations with DOD, in April 2000 the National Academies launched this review and appointed an expert committee to carry it out.
Inland Navigation System Planning
Author: National Research Council
Publisher: National Academies Press
ISBN: 9780309074056
Category : Nature
Languages : en
Pages : 134
Book Description
In 1988, the U.S. Army Corps of Engineers began an investigation of the benefits and costs of extending several locks on the lower portion of the Upper Mississippi River-Illinois Waterway (UMR-IWW) in order to relieve increasing waterway congestion, particularly for grain moving to New Orleans for export. With passage of the Flood Control Act of 1936, Congress required that the Corps conduct a benefit-cost analysis as part of its water resources project planning; Congress will fund water resources projects only if a project's benefits exceed its costs. As economic analysis generally, and benefit-cost analysis in particular, has become more sophisticated, and as environmental and social considerations and analysis have become more important, Corps planning studies have grown in size and complexity. The difficulty in commensurating market and nonmarket costs and benefits also presents the Corps with a significant challenge. The Corps' analysis of the UMR-IWW has extended over a decade, has cost roughly $50 million, and has involved consultations with other federal agencies, state conservation agencies, and local citizens. The analysis has included many consultants and has produced dozens of reports. In February 2000, the U.S. Department of Defense (DOD) requested that the National Academies review the Corps' final feasibility report. After discussions and negotiations with DOD, in April 2000 the National Academies launched this review and appointed an expert committee to carry it out.
Publisher: National Academies Press
ISBN: 9780309074056
Category : Nature
Languages : en
Pages : 134
Book Description
In 1988, the U.S. Army Corps of Engineers began an investigation of the benefits and costs of extending several locks on the lower portion of the Upper Mississippi River-Illinois Waterway (UMR-IWW) in order to relieve increasing waterway congestion, particularly for grain moving to New Orleans for export. With passage of the Flood Control Act of 1936, Congress required that the Corps conduct a benefit-cost analysis as part of its water resources project planning; Congress will fund water resources projects only if a project's benefits exceed its costs. As economic analysis generally, and benefit-cost analysis in particular, has become more sophisticated, and as environmental and social considerations and analysis have become more important, Corps planning studies have grown in size and complexity. The difficulty in commensurating market and nonmarket costs and benefits also presents the Corps with a significant challenge. The Corps' analysis of the UMR-IWW has extended over a decade, has cost roughly $50 million, and has involved consultations with other federal agencies, state conservation agencies, and local citizens. The analysis has included many consultants and has produced dozens of reports. In February 2000, the U.S. Department of Defense (DOD) requested that the National Academies review the Corps' final feasibility report. After discussions and negotiations with DOD, in April 2000 the National Academies launched this review and appointed an expert committee to carry it out.
9-foot Navigation Channel Project, Channel Maintenance Management Plan, Upper Mississippi River, Head of Navigation to Guttenburg
Upper Mississippi River 9-ft Navigation Channel, Pt.11-22
Upper Mississippi River Navigation Channel
Operations and Maintenance Upper Mississippi River 9-foot Navigation Channel
Narrative
Author: United States. Army Engineer District, St. Paul
Publisher:
ISBN:
Category : Environmental impact statements
Languages : en
Pages : 696
Book Description
Publisher:
ISBN:
Category : Environmental impact statements
Languages : en
Pages : 696
Book Description
Upper Mississippi River-Illinois Waterway System Navigation Feasibility Study, Integrated Feasiblity Report
Comprehensive Master Plan for the Management of the Upper Mississippi River System
Author: Upper Mississippi River Basin Commission
Publisher:
ISBN:
Category : Environmental impact analysis
Languages : en
Pages : 228
Book Description
Publisher:
ISBN:
Category : Environmental impact analysis
Languages : en
Pages : 228
Book Description
Final Environmental Statement, Locks and Dam No. 26, Mississippi River, Alton, Illinois: Final environmental statement to accompany the final report of the Chief of Engineers.- v. 2. Comments and responses
Author: United States. Army. Corps of Engineers
Publisher:
ISBN:
Category : Dams
Languages : en
Pages : 254
Book Description
Publisher:
ISBN:
Category : Dams
Languages : en
Pages : 254
Book Description