When Railtrack first planned the upgrade of the West Coast Mainline it was to have been completed in two phases in 2002 and 2005, used untried signalling technology and cost £2.6 billion. In the event the signalling was not installed, progress was much slower than anticipated and Railtrack collapsed. Network rail took over the project and put in place a more robust strategy to deliver the upgrade in three stages between 2004 and 2008. The first two stages have already been delivered on schedule. However the total modernisation cost is likely to be around £8.6 billion and the line will still be prone to overcrowding at peak times and is thus likely to need further investment. This report looks at the project on the basis of a report by the Comptroller and Auditor General.
The modernisation of the West Coast Main Line
Author: Great Britain: Parliament: House of Commons: Committee of Public Accounts
Publisher: The Stationery Office
ISBN: 0215034481
Category : Business & Economics
Languages : en
Pages : 60
Book Description
When Railtrack first planned the upgrade of the West Coast Mainline it was to have been completed in two phases in 2002 and 2005, used untried signalling technology and cost £2.6 billion. In the event the signalling was not installed, progress was much slower than anticipated and Railtrack collapsed. Network rail took over the project and put in place a more robust strategy to deliver the upgrade in three stages between 2004 and 2008. The first two stages have already been delivered on schedule. However the total modernisation cost is likely to be around £8.6 billion and the line will still be prone to overcrowding at peak times and is thus likely to need further investment. This report looks at the project on the basis of a report by the Comptroller and Auditor General.
Publisher: The Stationery Office
ISBN: 0215034481
Category : Business & Economics
Languages : en
Pages : 60
Book Description
When Railtrack first planned the upgrade of the West Coast Mainline it was to have been completed in two phases in 2002 and 2005, used untried signalling technology and cost £2.6 billion. In the event the signalling was not installed, progress was much slower than anticipated and Railtrack collapsed. Network rail took over the project and put in place a more robust strategy to deliver the upgrade in three stages between 2004 and 2008. The first two stages have already been delivered on schedule. However the total modernisation cost is likely to be around £8.6 billion and the line will still be prone to overcrowding at peak times and is thus likely to need further investment. This report looks at the project on the basis of a report by the Comptroller and Auditor General.
The right of access to open countryside
Author: Great Britain: Parliament: House of Commons: Committee of Public Accounts
Publisher: The Stationery Office
ISBN: 0215034570
Category : Science
Languages : en
Pages : 52
Book Description
The Countryside Rights of Way Act 2000 introduced a public right to walk across designated mountain, moor, heath, downs and registered common land in England. DEFRA tasked the Countryside Agency with opening-up the new access by the end of 2005, and the target was met with two months to spare. However the implementation of the right to roam cost the Countryside Agency £24.6 million more than anticipated, with knock-on impacts on other programmes. This report looks at the implementation of open access and the effect of the policy under the headings: encouraging the public to use the right to roam across the countryside; protecting the environment of access land and the rights of landowners; improving planning and project management. However the success of legislation is as yet unknown because there is no information on the extent to which the public are making use of their new right. In October 2006 the responsibility for open access passed from the Countryside Agency to Natural England.
Publisher: The Stationery Office
ISBN: 0215034570
Category : Science
Languages : en
Pages : 52
Book Description
The Countryside Rights of Way Act 2000 introduced a public right to walk across designated mountain, moor, heath, downs and registered common land in England. DEFRA tasked the Countryside Agency with opening-up the new access by the end of 2005, and the target was met with two months to spare. However the implementation of the right to roam cost the Countryside Agency £24.6 million more than anticipated, with knock-on impacts on other programmes. This report looks at the implementation of open access and the effect of the policy under the headings: encouraging the public to use the right to roam across the countryside; protecting the environment of access land and the rights of landowners; improving planning and project management. However the success of legislation is as yet unknown because there is no information on the extent to which the public are making use of their new right. In October 2006 the responsibility for open access passed from the Countryside Agency to Natural England.
H.M. Treasury
Author: Great Britain: Parliament: House of Commons: Committee of Public Accounts
Publisher: The Stationery Office
ISBN: 9780215037350
Category : Business & Economics
Languages : en
Pages : 44
Book Description
Under the Private Finance Initiative (PFI) there are now 800 contracts with private sector suppliers for services worth in total £155 billion up to 2032. To achieve value for money, all stages of a project have to be managed effectively, including in the tendering process. The Committee, in a 2003 report highlighted a number of issues regarding the PFI tendering process (HCP 764, session 2002-03, ISBN 9780215011244). This report re-examines the tendering and benchmarking in PFI, finding that the Treasury had done little to apply what it had learned from the large number of PFI deals signed; that there has been no improvement in tendering times and significant risks to value for money continue to be taken when public authorities make late changes to deals. The Committee has set out 7 conclusions and recommendations, including: that since 2004, the proportion of deals attracting only two bidders has more than doubled with the risk of no competition; one third of public sector teams made changes to PFI projects after they had selected a single, preferred bidder; benchmarking and market testing have increased prices by up to 14%; public authorities have found it difficult to find appropriate data to benchmark PFI service costs; there is evidence that public authorities, faced with price increases have had to cut back services in hospitals, including portering, to keep contracts affordable; that there is a continuing lack of PFI experience and skills within public procurement teams.
Publisher: The Stationery Office
ISBN: 9780215037350
Category : Business & Economics
Languages : en
Pages : 44
Book Description
Under the Private Finance Initiative (PFI) there are now 800 contracts with private sector suppliers for services worth in total £155 billion up to 2032. To achieve value for money, all stages of a project have to be managed effectively, including in the tendering process. The Committee, in a 2003 report highlighted a number of issues regarding the PFI tendering process (HCP 764, session 2002-03, ISBN 9780215011244). This report re-examines the tendering and benchmarking in PFI, finding that the Treasury had done little to apply what it had learned from the large number of PFI deals signed; that there has been no improvement in tendering times and significant risks to value for money continue to be taken when public authorities make late changes to deals. The Committee has set out 7 conclusions and recommendations, including: that since 2004, the proportion of deals attracting only two bidders has more than doubled with the risk of no competition; one third of public sector teams made changes to PFI projects after they had selected a single, preferred bidder; benchmarking and market testing have increased prices by up to 14%; public authorities have found it difficult to find appropriate data to benchmark PFI service costs; there is evidence that public authorities, faced with price increases have had to cut back services in hospitals, including portering, to keep contracts affordable; that there is a continuing lack of PFI experience and skills within public procurement teams.
Reports from Committees of the House of Commons
Author: Great Britain. Parliament. House of Commons
Publisher:
ISBN:
Category : Fur trade
Languages : en
Pages : 872
Book Description
Publisher:
ISBN:
Category : Fur trade
Languages : en
Pages : 872
Book Description
Child Support Agency
Author: Great Britain: Parliament: House of Commons: Committee of Public Accounts
Publisher: The Stationery Office
ISBN: 0215034872
Category : Social Science
Languages : en
Pages : 52
Book Description
Since it was established in 1993, the Child Support Agency has consistently underperformed, plagued by enormous backlogs of unprocessed cases and uncollected maintenance. Where it works well, the Agency has secured regular contributions from non-resident parents and helped lift an estimated 100,000 children out of poverty. It has to administer complex assessment, collection and enforcement processes and deal with complicated emotional, financial and legal issues to bring about a degree of financial stability for children and parents. Following on from a NAO report (HCP 1174, session 2005-06; ISBN 9780102938692) published in June 2006, the Committee's report examines the implementation of child support reforms, focusing on why the problems in implementing the reforms arose, the impact on the quality of service, the remedial action taken by the Child Support Agency and the lessons learnt. The report finds that implementing the reforms has cost the taxpayer £539 million since 2000, with plans for a further £320 million to improve service levels over the next three years; but the money has failed to deliver improvements in efficiency and quality of service. The Agency still performs less effectively than its counterparts in Australia and New Zealand, with higher average costs per case and lower rates of compliance. The Government published its White Paper (Cm. 6979, ISBN 9780101697927) in December 2006, drawing on the recommendations made by Sir David Henshaw in his report "Recovering child support: routes to responsibility" (Cm. 6984, ISBN 9780101689427). Amongst the reforms announced, the Government will replace the Child Support Agency (CSA) with a new organisation, the Child Maintenance and Enforcement Commission (C-MEC) by 2008.
Publisher: The Stationery Office
ISBN: 0215034872
Category : Social Science
Languages : en
Pages : 52
Book Description
Since it was established in 1993, the Child Support Agency has consistently underperformed, plagued by enormous backlogs of unprocessed cases and uncollected maintenance. Where it works well, the Agency has secured regular contributions from non-resident parents and helped lift an estimated 100,000 children out of poverty. It has to administer complex assessment, collection and enforcement processes and deal with complicated emotional, financial and legal issues to bring about a degree of financial stability for children and parents. Following on from a NAO report (HCP 1174, session 2005-06; ISBN 9780102938692) published in June 2006, the Committee's report examines the implementation of child support reforms, focusing on why the problems in implementing the reforms arose, the impact on the quality of service, the remedial action taken by the Child Support Agency and the lessons learnt. The report finds that implementing the reforms has cost the taxpayer £539 million since 2000, with plans for a further £320 million to improve service levels over the next three years; but the money has failed to deliver improvements in efficiency and quality of service. The Agency still performs less effectively than its counterparts in Australia and New Zealand, with higher average costs per case and lower rates of compliance. The Government published its White Paper (Cm. 6979, ISBN 9780101697927) in December 2006, drawing on the recommendations made by Sir David Henshaw in his report "Recovering child support: routes to responsibility" (Cm. 6984, ISBN 9780101689427). Amongst the reforms announced, the Government will replace the Child Support Agency (CSA) with a new organisation, the Child Maintenance and Enforcement Commission (C-MEC) by 2008.
Reports from Committees of the House of Commons which Have Been Printed by Order of the House
Author: Great Britain. Parliament. House of Commons
Publisher:
ISBN:
Category : Great Britain
Languages : en
Pages : 869
Book Description
Publisher:
ISBN:
Category : Great Britain
Languages : en
Pages : 869
Book Description
Reports from Committees of the House of Commons
Sessional Index for Session ...
Author: Great Britain. Parliament. House of Commons
Publisher:
ISBN:
Category : Government publications
Languages : en
Pages : 336
Book Description
Publisher:
ISBN:
Category : Government publications
Languages : en
Pages : 336
Book Description
Excess votes in 2010-11
Author: Great Britain: Parliament: House of Commons: Committee of Public Accounts
Publisher: The Stationery Office
ISBN: 9780215041586
Category : Business & Economics
Languages : en
Pages : 20
Book Description
The Committee of Public Accounts scrutinises the reasons behind individual Departments exceeding their allocated resources, and reports to the House of Commons on whether it has any objection to the amounts needed to rectify the reported excesses. The Committee may also make recommendations to Departments concerning the causes of these excesses. In 2010-11, two bodies breached their expenditure limits: The Department for Transport breached its Net Cash Requirement by £335.2 million, primarily because of weaknesses in monitoring its budget for the operation of its rail franchises; The Teachers' Pension Scheme (England & Wales) breached its Net Cash Requirement by £11.9 million because the Department for Education underestimated the number of members that would retire in 2010-11 and overestimated the contributions that would be collected from employers. On the basis of an examination of the reasons why these two bodies exceeded their voted provisions, the Committee has no objection to Parliament providing the necessary amounts by means of an Excess Vote. Nevertheless, it expects both bodies to set out what actions they have taken to improve their financial management and avoid exceeding their allocated resources in the future.
Publisher: The Stationery Office
ISBN: 9780215041586
Category : Business & Economics
Languages : en
Pages : 20
Book Description
The Committee of Public Accounts scrutinises the reasons behind individual Departments exceeding their allocated resources, and reports to the House of Commons on whether it has any objection to the amounts needed to rectify the reported excesses. The Committee may also make recommendations to Departments concerning the causes of these excesses. In 2010-11, two bodies breached their expenditure limits: The Department for Transport breached its Net Cash Requirement by £335.2 million, primarily because of weaknesses in monitoring its budget for the operation of its rail franchises; The Teachers' Pension Scheme (England & Wales) breached its Net Cash Requirement by £11.9 million because the Department for Education underestimated the number of members that would retire in 2010-11 and overestimated the contributions that would be collected from employers. On the basis of an examination of the reasons why these two bodies exceeded their voted provisions, the Committee has no objection to Parliament providing the necessary amounts by means of an Excess Vote. Nevertheless, it expects both bodies to set out what actions they have taken to improve their financial management and avoid exceeding their allocated resources in the future.
Flood risk management in England
Author: Great Britain: Parliament: House of Commons: Committee of Public Accounts
Publisher: The Stationery Office
ISBN: 9780215041487
Category : Business & Economics
Languages : en
Pages : 40
Book Description
Flood protection is a national priority and features on the National Risk Register of Civil Emergencies. Recently the annual cost of flood damage has been £1.1 billion, and 5.2 million homes are at risk of flooding. In 2010-11 the Department for Environment, Food and Rural Affairs (the Department) spent £664 million on flood and coastal risk management, 95% of which went to the Environment Agency (the Agency). In 2009 the Agency projected that its flood risk management budget needed to rise by 9% during the spending review period (2011-12 to 2014-15) to sustain current levels of protection. However during the same period the Agency's flood risk management budget has been reduced by over 10%. The Department wants to increase local authority and private contributions, but expecting an increase in local authority contributions when their resources are reducing may well be over-optimistic. The Committee was very concerned that the Department did not accept ultimate responsibility for managing the risk of floods. The Department also needs more reliable information to inform its decisions on when and where to intervene if local risk management plans are inadequate. The Agency needs to improve how it involves local communities in the decision-making process. The agreement between the Department and the insurance industry that insurance cover will be provided to households at risk of flooding ends in 2013. In some areas premiums appear to have risen as a result of growing uncertainty over local levels of protection, so an early revised agreement is needed.
Publisher: The Stationery Office
ISBN: 9780215041487
Category : Business & Economics
Languages : en
Pages : 40
Book Description
Flood protection is a national priority and features on the National Risk Register of Civil Emergencies. Recently the annual cost of flood damage has been £1.1 billion, and 5.2 million homes are at risk of flooding. In 2010-11 the Department for Environment, Food and Rural Affairs (the Department) spent £664 million on flood and coastal risk management, 95% of which went to the Environment Agency (the Agency). In 2009 the Agency projected that its flood risk management budget needed to rise by 9% during the spending review period (2011-12 to 2014-15) to sustain current levels of protection. However during the same period the Agency's flood risk management budget has been reduced by over 10%. The Department wants to increase local authority and private contributions, but expecting an increase in local authority contributions when their resources are reducing may well be over-optimistic. The Committee was very concerned that the Department did not accept ultimate responsibility for managing the risk of floods. The Department also needs more reliable information to inform its decisions on when and where to intervene if local risk management plans are inadequate. The Agency needs to improve how it involves local communities in the decision-making process. The agreement between the Department and the insurance industry that insurance cover will be provided to households at risk of flooding ends in 2013. In some areas premiums appear to have risen as a result of growing uncertainty over local levels of protection, so an early revised agreement is needed.