Author: United States. Bureau of Land Management
Publisher:
ISBN:
Category : Environmental impact statements
Languages : en
Pages :
Book Description
Proposed Southline Transmission Line Project
Author: United States. Bureau of Land Management
Publisher:
ISBN:
Category : Environmental impact statements
Languages : en
Pages :
Book Description
Publisher:
ISBN:
Category : Environmental impact statements
Languages : en
Pages :
Book Description
Southline Transmission Line Project
Author:
Publisher:
ISBN:
Category : Environmental impact statements
Languages : en
Pages :
Book Description
Publisher:
ISBN:
Category : Environmental impact statements
Languages : en
Pages :
Book Description
McNary-John Day Transmission Line Project
Schultz-Hanford Area Transmission Line Project
Southern California Edison's Eldorado-Ivanpah Transmission Line Project
Ten West Link Transmission Line Project
Author: United States. Bureau of Land Management
Publisher:
ISBN:
Category : Electric lines
Languages : en
Pages :
Book Description
Evaluates the anticipated environmental effects of the construction, operation, maintenance, and decommissioning of the Ten West Link Transmission Line Project (Project) proposed by DCR Transmission, LLC. The proposed Project includes construction of a 500-kilovolt electric transmission line and associated infrastructure, from the Delaney Substation near Tonopah, Arizona, to the Colorado River Substation near Blythe, California...The Proposed Action is 114.3 miles long and generally follows the existing Devers to Palo Verde transmission line, including a 24.9-mile long crossing of the Kofa National Wildlife Refuge (NWR). The Agency Preferred Alternative is 125.0 miles long, utilizes BLM utility corridors, and does not cross the Kofa NWR.
Publisher:
ISBN:
Category : Electric lines
Languages : en
Pages :
Book Description
Evaluates the anticipated environmental effects of the construction, operation, maintenance, and decommissioning of the Ten West Link Transmission Line Project (Project) proposed by DCR Transmission, LLC. The proposed Project includes construction of a 500-kilovolt electric transmission line and associated infrastructure, from the Delaney Substation near Tonopah, Arizona, to the Colorado River Substation near Blythe, California...The Proposed Action is 114.3 miles long and generally follows the existing Devers to Palo Verde transmission line, including a 24.9-mile long crossing of the Kofa National Wildlife Refuge (NWR). The Agency Preferred Alternative is 125.0 miles long, utilizes BLM utility corridors, and does not cross the Kofa NWR.