Author: John C. Commander
Publisher:
ISBN:
Category : Decontamination (from gases, chemicals, etc.)
Languages : en
Pages :
Book Description
Preliminary Decontamination and Decommissioning Plan for the Tokamak Fusion Test Reactor
Author: John C. Commander
Publisher:
ISBN:
Category : Decontamination (from gases, chemicals, etc.)
Languages : en
Pages :
Book Description
Publisher:
ISBN:
Category : Decontamination (from gases, chemicals, etc.)
Languages : en
Pages :
Book Description
Plan for Decommissioning the Tokamak Fusion Test Reactor
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 10
Book Description
The Tokamak Fusion Test Reactor (TFTR) Project is in the planning phase of developing a decommissioning project. A Preliminary Decontamination and Decommissioning (D & D) Plan has been developed which provides a framework for the baseline approach, and the cost and schedule estimates. TFTR will become activated and contaminated with tritium after completion of the deuterium-tritium (D-T) experiments. Hence some of the D & D operations will require remote handling. It is expected that all of the waste generated will be low level radioactive waste (LLW). The objective of the D & D Project is to make TFTR Test Cell available for use by a new fusion experiment. This paper discusses the D & D objectives, the facility to be decommissioned, estimates of activation, the technical (baseline) approach, and the assumptions used to develop cost and schedule estimates.
Publisher:
ISBN:
Category :
Languages : en
Pages : 10
Book Description
The Tokamak Fusion Test Reactor (TFTR) Project is in the planning phase of developing a decommissioning project. A Preliminary Decontamination and Decommissioning (D & D) Plan has been developed which provides a framework for the baseline approach, and the cost and schedule estimates. TFTR will become activated and contaminated with tritium after completion of the deuterium-tritium (D-T) experiments. Hence some of the D & D operations will require remote handling. It is expected that all of the waste generated will be low level radioactive waste (LLW). The objective of the D & D Project is to make TFTR Test Cell available for use by a new fusion experiment. This paper discusses the D & D objectives, the facility to be decommissioned, estimates of activation, the technical (baseline) approach, and the assumptions used to develop cost and schedule estimates.
Decontamination and Decommissioning of the Tokamak Fusion Test Reactor
Author: E. D. Perry
Publisher:
ISBN:
Category : Decontamination (from gases, chemicals, etc.)
Languages : en
Pages : 4
Book Description
Publisher:
ISBN:
Category : Decontamination (from gases, chemicals, etc.)
Languages : en
Pages : 4
Book Description
Industrial Hygiene Concerns During the Decontamination and Decommissioning of the Tokamak Fusion Test Reactor
Author: Margaret Ellen Lumia
Publisher:
ISBN:
Category : Environmental engineering
Languages : en
Pages : 4
Book Description
Publisher:
ISBN:
Category : Environmental engineering
Languages : en
Pages : 4
Book Description
Decontamination and Decommissioning of the Tokamak Fusion Test Reactor
Author: E. D. Perry
Publisher:
ISBN:
Category : Decontamination (from gases, chemicals, etc.)
Languages : en
Pages : 4
Book Description
Publisher:
ISBN:
Category : Decontamination (from gases, chemicals, etc.)
Languages : en
Pages : 4
Book Description
Decontamination and Decommissioning the Tokamak Fusion Test Reactor
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 6
Book Description
The Tokamak Fusion Test Reactor (TFTR) is scheduled to complete its end-of-life deuterium-tritium (D-T) experiments in September 1994. The D-T operation will result in the TFTR machine structure becoming activated, and plasma facing and vacuum components will be contaminated with tritium. The resulting machine activation levels after a two year cooldown period will allow hands on dismantling for external structures, but require remote dismantling for the vacuum vessel. The primary objective of the Decontamination and Decommissioning (D & D) Project is to provide a facility for construction of a new Department of Energy (DOE) experimental fusion reactor by March 1998. The project schedule calls for a two year shutdown period when tritium decontamination of the vacuum vessel, neutral beam injectors and other components will occur. Shutdown will be followed by an 18 month period of D & D operations. The technical objectives of the project are to: safely dismantle and remove components from the test cell complex; package disassembled components in accordance with applicable regulations; ship packages to a DOE approved disposal or material recycling site; and develop expertise using remote disassembly techniques on a large scale fusion facility. This paper discusses the D & D objectives, the facility to be decommissioned, and the technical plan that will be implemented.
Publisher:
ISBN:
Category :
Languages : en
Pages : 6
Book Description
The Tokamak Fusion Test Reactor (TFTR) is scheduled to complete its end-of-life deuterium-tritium (D-T) experiments in September 1994. The D-T operation will result in the TFTR machine structure becoming activated, and plasma facing and vacuum components will be contaminated with tritium. The resulting machine activation levels after a two year cooldown period will allow hands on dismantling for external structures, but require remote dismantling for the vacuum vessel. The primary objective of the Decontamination and Decommissioning (D & D) Project is to provide a facility for construction of a new Department of Energy (DOE) experimental fusion reactor by March 1998. The project schedule calls for a two year shutdown period when tritium decontamination of the vacuum vessel, neutral beam injectors and other components will occur. Shutdown will be followed by an 18 month period of D & D operations. The technical objectives of the project are to: safely dismantle and remove components from the test cell complex; package disassembled components in accordance with applicable regulations; ship packages to a DOE approved disposal or material recycling site; and develop expertise using remote disassembly techniques on a large scale fusion facility. This paper discusses the D & D objectives, the facility to be decommissioned, and the technical plan that will be implemented.
The Tokamak Fusion Test Reactor Decontamination and Decommissioning Project and the Tokamak Physics Experiment at the Princeton Plasma Physics Laboratory. Environmental Assessment
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 185
Book Description
If the US is to meet the energy needs of the future, it is essential that new technologies emerge to compensate for dwindling supplies of fossil fuels and the eventual depletion of fissionable uranium used in present-day nuclear reactors. Fusion energy has the potential to become a major source of energy for the future. Power from fusion energy would provide a substantially reduced environmental impact as compared with other forms of energy generation. Since fusion utilizes no fossil fuels, there would be no release of chemical combustion products to the atmosphere. Additionally, there are no fission products formed to present handling and disposal problems, and runaway fuel reactions are impossible due to the small amounts of deuterium and tritium present. The purpose of the TPX Project is to support the development of the physics and technology to extend tokamak operation into the continuously operating (steady-state) regime, and to demonstrate advances in fundamental tokamak performance. The purpose of TFTR D & D is to ensure compliance with DOE Order 5820.2A R̀̀adioactive Waste Management ̀̀and to remove environmental and health hazards posed by the TFTR in a non-operational mode. There are two proposed actions evaluated in this environmental assessment (EA). The actions are related because one must take place before the other can proceed. The proposed actions assessed in this EA are: the decontamination and decommissioning (D & D) of the Tokamak Fusion Test Reactor (TFTR); to be followed by the construction and operation of the Tokamak Physics Experiment (TPX). Both of these proposed actions would take place primarily within the TFTR Test Cell Complex at the Princeton Plasma Physics Laboratory (PPPL). The TFTR is located on D̀̀-site ̀̀at the James Forrestal Campus of Princeton University in Plainsboro Township, Middlesex County, New Jersey, and is operated by PPPL under contract with the United States Department of Energy (DOE).
Publisher:
ISBN:
Category :
Languages : en
Pages : 185
Book Description
If the US is to meet the energy needs of the future, it is essential that new technologies emerge to compensate for dwindling supplies of fossil fuels and the eventual depletion of fissionable uranium used in present-day nuclear reactors. Fusion energy has the potential to become a major source of energy for the future. Power from fusion energy would provide a substantially reduced environmental impact as compared with other forms of energy generation. Since fusion utilizes no fossil fuels, there would be no release of chemical combustion products to the atmosphere. Additionally, there are no fission products formed to present handling and disposal problems, and runaway fuel reactions are impossible due to the small amounts of deuterium and tritium present. The purpose of the TPX Project is to support the development of the physics and technology to extend tokamak operation into the continuously operating (steady-state) regime, and to demonstrate advances in fundamental tokamak performance. The purpose of TFTR D & D is to ensure compliance with DOE Order 5820.2A R̀̀adioactive Waste Management ̀̀and to remove environmental and health hazards posed by the TFTR in a non-operational mode. There are two proposed actions evaluated in this environmental assessment (EA). The actions are related because one must take place before the other can proceed. The proposed actions assessed in this EA are: the decontamination and decommissioning (D & D) of the Tokamak Fusion Test Reactor (TFTR); to be followed by the construction and operation of the Tokamak Physics Experiment (TPX). Both of these proposed actions would take place primarily within the TFTR Test Cell Complex at the Princeton Plasma Physics Laboratory (PPPL). The TFTR is located on D̀̀-site ̀̀at the James Forrestal Campus of Princeton University in Plainsboro Township, Middlesex County, New Jersey, and is operated by PPPL under contract with the United States Department of Energy (DOE).
Industrial Hygiene Concerns During the Decontamination and Decommissioning of the Tokamak Fusion Test Reactor
Author: Margaret Ellen Lumia
Publisher:
ISBN:
Category : Environmental engineering
Languages : en
Pages : 4
Book Description
Publisher:
ISBN:
Category : Environmental engineering
Languages : en
Pages : 4
Book Description
Plan for Decommissioning the Tokamak Fusion Test Reactor
Decontamination and Decommissioning the Tokamak Fusion Test React
Author: Princeton University. Plasma Physics Laboratory
Publisher:
ISBN:
Category : Decontamination (from gases, chemicals, etc.)
Languages : en
Pages : 6
Book Description
Publisher:
ISBN:
Category : Decontamination (from gases, chemicals, etc.)
Languages : en
Pages : 6
Book Description