Author: United States. Environmental Protection Agency. Region IV.
Publisher:
ISBN:
Category : Electric power-plants
Languages : en
Pages :
Book Description
Polk Power Station, Tampa Electric Company: Appendices
Author: United States. Environmental Protection Agency. Region IV.
Publisher:
ISBN:
Category : Electric power-plants
Languages : en
Pages :
Book Description
Publisher:
ISBN:
Category : Electric power-plants
Languages : en
Pages :
Book Description
Polk Power Station, Tampa Electric Company, Proposed EPA Issuance of a National Pollutant Discharge Elimination System (NPDES) Permit for a New Source, Proposed DOE Clean Coal Cost-shared Financial Assistance Under the DOE Clean Coal Technology Demonstration Program
Clean Coal Technology Project to Polk Power Station, Tampa Electric Company, Florida. Final Report, Volume II: Report and Appendices
Final Environmental Impact Statement
Author:
Publisher:
ISBN:
Category : Electric power-plants
Languages : en
Pages : 854
Book Description
Publisher:
ISBN:
Category : Electric power-plants
Languages : en
Pages : 854
Book Description
Polk Power Station, Tampa Electric Company: Report
Author: United States. Environmental Protection Agency. Region IV.
Publisher:
ISBN:
Category : Electric power-plants
Languages : en
Pages :
Book Description
Publisher:
ISBN:
Category : Electric power-plants
Languages : en
Pages :
Book Description
Tampa Electric Company, Polk Power Station Unit No. 1: Annual Report, January - December 1992
EPA Publications Bibliography
Author: United States. Environmental Protection Agency
Publisher:
ISBN:
Category : Environmental protection
Languages : en
Pages : 214
Book Description
Publisher:
ISBN:
Category : Environmental protection
Languages : en
Pages : 214
Book Description
Darkhey hayetsirah hamilonit beʹivrit bat-zemanenu
EPA Publications Bibliography Quarterly Abstract Bulletin
Author: United States. Environmental Protection Agency
Publisher:
ISBN:
Category : Environmental protection
Languages : en
Pages : 204
Book Description
Publisher:
ISBN:
Category : Environmental protection
Languages : en
Pages : 204
Book Description
Tampa Electric Company Polk Power Station Unit Number 1. Annual Report, January--December, 1993
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 45
Book Description
This report satisfies the requirements of Cooperative Agreement DE-FC21-91MC27363, novated as of March 5, 1992, to provide an annual update report on the year's activities associated with Tampa Electric Company's 250 MW IGCC demonstration project for the year 1993. Tampa Electric Company's Polk Power Station Unit 1 (PPS-1) Integrated Gasification Combined Cycle (IGCC) demonstration project will use a Texaco pressurized, oxygen-blown, entrained-flow coal gasifier to convert approximately 2,000 tons per day of coal (dry basis) coupled with a combined cycle power block to produce a net 250 MW electrical power output. Approximately 50% of the raw, hot syngas is cooled to 900 F and passed through a moving bed of zinc-based sorbent which removes sulfur containing compounds from the syngas. The remaining portion of the raw, hot syngas is cooled to 400 F for conventional acid gas removal. Sulfur-bearing compounds from both cleanup systems are sent to a conventional sulfuric acid plant to produce a marketable, high-purity sulfuric acid by-product. The cleaned medium-BTU syngas from these processes is routed to the combined cycle power generation system where it is mixed with air and burned in the combustion section of the combustion turbine. Heat is extracted from the expanded exhaust gases in a heat recovery steam generator (HRSG) to produce steam at three pressure levels for use throughout the integrated process. A highly modular, microprocessor-based distributed control system (DCS) is being developed to provide continuous and sequential control for most of the equipment on PPS-1.
Publisher:
ISBN:
Category :
Languages : en
Pages : 45
Book Description
This report satisfies the requirements of Cooperative Agreement DE-FC21-91MC27363, novated as of March 5, 1992, to provide an annual update report on the year's activities associated with Tampa Electric Company's 250 MW IGCC demonstration project for the year 1993. Tampa Electric Company's Polk Power Station Unit 1 (PPS-1) Integrated Gasification Combined Cycle (IGCC) demonstration project will use a Texaco pressurized, oxygen-blown, entrained-flow coal gasifier to convert approximately 2,000 tons per day of coal (dry basis) coupled with a combined cycle power block to produce a net 250 MW electrical power output. Approximately 50% of the raw, hot syngas is cooled to 900 F and passed through a moving bed of zinc-based sorbent which removes sulfur containing compounds from the syngas. The remaining portion of the raw, hot syngas is cooled to 400 F for conventional acid gas removal. Sulfur-bearing compounds from both cleanup systems are sent to a conventional sulfuric acid plant to produce a marketable, high-purity sulfuric acid by-product. The cleaned medium-BTU syngas from these processes is routed to the combined cycle power generation system where it is mixed with air and burned in the combustion section of the combustion turbine. Heat is extracted from the expanded exhaust gases in a heat recovery steam generator (HRSG) to produce steam at three pressure levels for use throughout the integrated process. A highly modular, microprocessor-based distributed control system (DCS) is being developed to provide continuous and sequential control for most of the equipment on PPS-1.