The ORR operated at an average power level of 29.8 MW for 29.6% of the time during October, November, and December of 1977. Ten new fuel elements were placed in service. Two shim-rod elements were retired from service at an average burnup of 71.2%. The reactor was shut down on seven occasions, none of which were unscheduled. Reactor downtime needed for refueling, maintenance and checks was quite low, with the reactor remaining available for operation 88.2% of the time. Maintenance activities, both mechanical and instrument were essentially routine in nature. In-service inspections completed during the quarter included inspection of the ORR decay tank and the ORR pool heat exchanger.
Oak Ridge Research Reactor Quarterly Report, October, November, and December of 1977
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description
The ORR operated at an average power level of 29.8 MW for 29.6% of the time during October, November, and December of 1977. Ten new fuel elements were placed in service. Two shim-rod elements were retired from service at an average burnup of 71.2%. The reactor was shut down on seven occasions, none of which were unscheduled. Reactor downtime needed for refueling, maintenance and checks was quite low, with the reactor remaining available for operation 88.2% of the time. Maintenance activities, both mechanical and instrument were essentially routine in nature. In-service inspections completed during the quarter included inspection of the ORR decay tank and the ORR pool heat exchanger.
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description
The ORR operated at an average power level of 29.8 MW for 29.6% of the time during October, November, and December of 1977. Ten new fuel elements were placed in service. Two shim-rod elements were retired from service at an average burnup of 71.2%. The reactor was shut down on seven occasions, none of which were unscheduled. Reactor downtime needed for refueling, maintenance and checks was quite low, with the reactor remaining available for operation 88.2% of the time. Maintenance activities, both mechanical and instrument were essentially routine in nature. In-service inspections completed during the quarter included inspection of the ORR decay tank and the ORR pool heat exchanger.
OAK RIDGE RESEARCH REACTOR QUARTERLY REPORT, OCTOBER, NOVEMBER, AND DECEMBER OF 1966
Oak Ridge Research Reactor Quarterly Report, October, November, and December of 1969
Oak Ridge Research Reactor Quarterly Report, October, November, and December of 1971
Energy Research Abstracts
Oak Ridge Research Reactor Quarterly Report October, November and December of 1979
Energy Research Abstracts
Oak Ridge Research Reactor Quarterly Report April, May, and June of 1977
Oak Ridge Research Reactor Quarterly Report October, November and December of 1978
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description
The ORR operated at an average power level of 29.0 MW for 80.9% of the time during October, November, and December of 1978. The reactor was shut down on fourteen occasions, four of which were unscheduled. Reactor downtime needed for refueling, maintenance and checks was normal, with the reactor remaining available for operation 92.2% of the time. Maintenance activities, both mechanical and instrument, were essentially routine in nature.
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description
The ORR operated at an average power level of 29.0 MW for 80.9% of the time during October, November, and December of 1978. The reactor was shut down on fourteen occasions, four of which were unscheduled. Reactor downtime needed for refueling, maintenance and checks was normal, with the reactor remaining available for operation 92.2% of the time. Maintenance activities, both mechanical and instrument, were essentially routine in nature.
Oak Ridge Research Reactor Quarterly Report, January--March 1977
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description
The ORR operated at an average power level of 29.2 Mw for 23.6% of the time during January, February, and March of 1977. Six fuel elements were declared spent (56.3% burnup) during the quarter, while five new elements were placed in service. The reactor was shut down on seven occasions, none of which were unscheduled. Reactor downtime needed for refueling, maintenance and checks was quite low, with the reactor remaining available for operation 87.0% of the time. Maintenance activities, both mechanical and instrument, were essentially routine in nature.
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description
The ORR operated at an average power level of 29.2 Mw for 23.6% of the time during January, February, and March of 1977. Six fuel elements were declared spent (56.3% burnup) during the quarter, while five new elements were placed in service. The reactor was shut down on seven occasions, none of which were unscheduled. Reactor downtime needed for refueling, maintenance and checks was quite low, with the reactor remaining available for operation 87.0% of the time. Maintenance activities, both mechanical and instrument, were essentially routine in nature.