The ORR operated at an average power level of 28.9 MW for 84.2% of the time during January, February and March of 1979. The reactor was shut down on seventeen occasions, three of which were unscheduled. Reactor downtime needed for refueling, maintenance and checks was normal, with the reactor remaining available for operation 93.6% of the time. Maintenance activities, both mechanical and instrument, were essentially routine in nature with the exception of one mechanical design change. Special tests or measurements completed during the quarter included: (1) preliminary measurements for the LWR Pressure Vessel Irradiation Program; (2) flux mapping for Core No. 148-A; and (3) calibration of all six shim rods.
Oak Ridge Research Reactor Quarterly Report, January-March, 1979
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description
The ORR operated at an average power level of 28.9 MW for 84.2% of the time during January, February and March of 1979. The reactor was shut down on seventeen occasions, three of which were unscheduled. Reactor downtime needed for refueling, maintenance and checks was normal, with the reactor remaining available for operation 93.6% of the time. Maintenance activities, both mechanical and instrument, were essentially routine in nature with the exception of one mechanical design change. Special tests or measurements completed during the quarter included: (1) preliminary measurements for the LWR Pressure Vessel Irradiation Program; (2) flux mapping for Core No. 148-A; and (3) calibration of all six shim rods.
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description
The ORR operated at an average power level of 28.9 MW for 84.2% of the time during January, February and March of 1979. The reactor was shut down on seventeen occasions, three of which were unscheduled. Reactor downtime needed for refueling, maintenance and checks was normal, with the reactor remaining available for operation 93.6% of the time. Maintenance activities, both mechanical and instrument, were essentially routine in nature with the exception of one mechanical design change. Special tests or measurements completed during the quarter included: (1) preliminary measurements for the LWR Pressure Vessel Irradiation Program; (2) flux mapping for Core No. 148-A; and (3) calibration of all six shim rods.
Oak Ridge Research Reactor Quarterly Report July, August, and September of 1979
Oak Ridge Research Reactor Quarterly Report October, November and December of 1979
Oak Ridge Research Reactor Quarterly Report, April, May, and June of 1979
OAK RIDGE RESEARCH REACTOR QUARTERLY REPORT, JANUARY, FEBRUARY, AND MARCH OF 1967
Oak Ridge Research Reactor Quarterly Report, January, February, and March of 1973
Oak Ridge Research Reactor. Quarterly Report, April-June 1979
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description
The ORR operated at an average power level of 29.9 MW for 77.9% of the time during April, May, and June of 1979. The reactor was shut down on seven occasions, two of which were unscheduled. Reactor downtime needed for refueling, maintenance and checks was normal, with the reactor remaining available for operation 86.5% of the time. Maintenance activities, both mechanical and instrument, were essentially routine in nature.
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description
The ORR operated at an average power level of 29.9 MW for 77.9% of the time during April, May, and June of 1979. The reactor was shut down on seven occasions, two of which were unscheduled. Reactor downtime needed for refueling, maintenance and checks was normal, with the reactor remaining available for operation 86.5% of the time. Maintenance activities, both mechanical and instrument, were essentially routine in nature.
Energy Research Abstracts
Oak Ridge Research Reactor Quarterly Report, January--March 1972
Oak Ridge Research Reactor Quarterly Report, January, February, and March of 1980
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description
The ORR operated at an average power level of 29.9 MW for 91.3% of the time during January, February, and March of 1980. The reactor was shut down on twelve occasions, six of which were unscheduled. Reactor downtime needed for refueling, maintenance and checks was normal, with the reactor remaining available for use 93.7% of the time. Maintenance activities, both mechanical and instrument, were essentially routine in nature with the exception of one Reactor Instrument and Controls Design Change Memo.
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description
The ORR operated at an average power level of 29.9 MW for 91.3% of the time during January, February, and March of 1980. The reactor was shut down on twelve occasions, six of which were unscheduled. Reactor downtime needed for refueling, maintenance and checks was normal, with the reactor remaining available for use 93.7% of the time. Maintenance activities, both mechanical and instrument, were essentially routine in nature with the exception of one Reactor Instrument and Controls Design Change Memo.