Author: J. Michael Norris
Publisher:
ISBN:
Category : Groundwater
Languages : en
Pages :
Book Description
Installation Restoration Program Remedial Investigation/feasibility Study (RI/FS) Stage 1
Author: J. Michael Norris
Publisher:
ISBN:
Category : Groundwater
Languages : en
Pages :
Book Description
Publisher:
ISBN:
Category : Groundwater
Languages : en
Pages :
Book Description
Installation Restoration Program Final Remedial Investigation Report
Author: James M. Montgomery
Publisher:
ISBN:
Category : Hazardous wastes
Languages : en
Pages :
Book Description
Publisher:
ISBN:
Category : Hazardous wastes
Languages : en
Pages :
Book Description
Installation Restoration Program
Author: IT Corporation
Publisher:
ISBN:
Category : Groundwater
Languages : en
Pages :
Book Description
Publisher:
ISBN:
Category : Groundwater
Languages : en
Pages :
Book Description
Remedial investigation report: installation restoration program
Author: United States. Navy
Publisher:
ISBN:
Category : Hazardous wastes
Languages : en
Pages :
Book Description
Publisher:
ISBN:
Category : Hazardous wastes
Languages : en
Pages :
Book Description
Installation Restoration Program, Remedial Investigation/feasibility Study
Author: CH2M HILL (Firm)
Publisher:
ISBN:
Category : Air bases
Languages : en
Pages :
Book Description
Publisher:
ISBN:
Category : Air bases
Languages : en
Pages :
Book Description
U.S. Air Force Installation Restoration Program, Lowry Air Force Base, Colorado
Author: United States. Air Force. Air Training Command
Publisher:
ISBN:
Category : Hazardous waste site remediation
Languages : en
Pages :
Book Description
Publisher:
ISBN:
Category : Hazardous waste site remediation
Languages : en
Pages :
Book Description
Installation Restoration Program. Final Remedial Investigation Report. Volume I. 120th Fighter Wing, Montana Air National Guard, Great Falls International Airport, Great Falls, Montana
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 179
Book Description
A Remedial Investigation was conducted at the Great Falls Air National Guard Base during April, May, and July 1996. During the period four IRP sites were investigated (IRP Sites 1, 6, 7, and 8). The investigation consisted of drilling 14 soil borings and installing 10 monitoring wells. At Sites 1 and 6, no contaminants in the soil or groundwater were found above State and Federal cleanup levels; and a Decision Document to support no further action is recommended. At Sites 7 and 8, no contaminants were found in the soil above State and Federal cleanup levels; and a Decision Document to support no further action with respect to soil contamination is recommended. At Sites 7 and 8, groundwater contamination above State and Federal cleanup levels was detected. The contamination included petroleum hydrocarbons, chlorinated solvents, and dissolved metals. It is recommended that an Engineering Evaluation/Cost Analysis be prepared to evaluate remedial alternatives for the groundwater at Sites 7 and 8.
Publisher:
ISBN:
Category :
Languages : en
Pages : 179
Book Description
A Remedial Investigation was conducted at the Great Falls Air National Guard Base during April, May, and July 1996. During the period four IRP sites were investigated (IRP Sites 1, 6, 7, and 8). The investigation consisted of drilling 14 soil borings and installing 10 monitoring wells. At Sites 1 and 6, no contaminants in the soil or groundwater were found above State and Federal cleanup levels; and a Decision Document to support no further action is recommended. At Sites 7 and 8, no contaminants were found in the soil above State and Federal cleanup levels; and a Decision Document to support no further action with respect to soil contamination is recommended. At Sites 7 and 8, groundwater contamination above State and Federal cleanup levels was detected. The contamination included petroleum hydrocarbons, chlorinated solvents, and dissolved metals. It is recommended that an Engineering Evaluation/Cost Analysis be prepared to evaluate remedial alternatives for the groundwater at Sites 7 and 8.
Installation Restoration Program Remedial Investigation Report
Author: Hazardous Waste Remedial Actions Program (U.S.)
Publisher:
ISBN:
Category : Hazardous waste sites
Languages : en
Pages :
Book Description
Publisher:
ISBN:
Category : Hazardous waste sites
Languages : en
Pages :
Book Description
Installation Restoration Program Final Remedial Investigation Report IRP Sites 8 and 10. 151st Air Refueling Group Utah Air National Guard, Salt Lake City, Utah
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 443
Book Description
This report presents the results from a Remedial Investigation (RI) for two sites at the Utah Air National Guard (UANG) Base located in Salt Lake City, Utah. Stone & Webster Engineering Corporation (Stone & Webster) performed the work for the Air National Guard (ANG) Readiness Center under Task No. 2 of Contract No. DAHA9O-94-D-0009. The two sites investigated are identified as Installation Restoration Program (IRP) Site 8, a former underground storage tank (UST) location, and IRP Site 10, an existing petroleum, oil, and lubricants (POL) yard. The RI was conducted as outlined in the Remedial Investigation/Feasibility Study (RI/FS) Work Plan prepared by Stone & Webster and submitted to and approved by the ANG in May 1993. The field work associated with the RI was performed in June, July, and August 1995.
Publisher:
ISBN:
Category :
Languages : en
Pages : 443
Book Description
This report presents the results from a Remedial Investigation (RI) for two sites at the Utah Air National Guard (UANG) Base located in Salt Lake City, Utah. Stone & Webster Engineering Corporation (Stone & Webster) performed the work for the Air National Guard (ANG) Readiness Center under Task No. 2 of Contract No. DAHA9O-94-D-0009. The two sites investigated are identified as Installation Restoration Program (IRP) Site 8, a former underground storage tank (UST) location, and IRP Site 10, an existing petroleum, oil, and lubricants (POL) yard. The RI was conducted as outlined in the Remedial Investigation/Feasibility Study (RI/FS) Work Plan prepared by Stone & Webster and submitted to and approved by the ANG in May 1993. The field work associated with the RI was performed in June, July, and August 1995.
Installation Restoration Program (IRP) Stage 5
Author: United States. Air Force
Publisher:
ISBN:
Category : Ellsworth Air Force Base (S.D.)
Languages : en
Pages :
Book Description
Publisher:
ISBN:
Category : Ellsworth Air Force Base (S.D.)
Languages : en
Pages :
Book Description