Hot Dry Rock Phase II Reservoir Engineering PDF Download

Are you looking for read ebook online? Search for your book and save it on your Kindle device, PC, phones or tablets. Download Hot Dry Rock Phase II Reservoir Engineering PDF full book. Access full book title Hot Dry Rock Phase II Reservoir Engineering by Hugh D. Murphy. Download full books in PDF and EPUB format.

Hot Dry Rock Phase II Reservoir Engineering

Hot Dry Rock Phase II Reservoir Engineering PDF Author: Hugh D. Murphy
Publisher:
ISBN:
Category : Hot dry rock systems
Languages : en
Pages :

Book Description


Hot Dry Rock Phase II Reservoir Engineering

Hot Dry Rock Phase II Reservoir Engineering PDF Author: Hugh D. Murphy
Publisher:
ISBN:
Category : Hot dry rock systems
Languages : en
Pages :

Book Description


Hot Dry Rock Phase II Reservoir Engineering

Hot Dry Rock Phase II Reservoir Engineering PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Book Description
Early attempts to hydraulically fracture and connect two wells drilled at the Hot Dry Rock site at Fenton Hill in New Mexico failed. Microearthquakes triggered by hydraulic fracturing indicated that the fracture zones grew in unexpected directions. Consequently one of the wells was sidetracked at a depth of 2.9 km; was redrilled into the zones of most intense microseismic activity; and a flow connection was achieved. Hydraulic communication was improved by supplemental fracturing using recently developed high temperature and high pressure open hole packers. Preliminary testing indicates a reservoir with stimulated joint volume which already surpasses that attained in the earlier phase I reservoir after several years of development. 12 refs., 6 figs.

Mining the Earth's Heat: Hot Dry Rock Geothermal Energy

Mining the Earth's Heat: Hot Dry Rock Geothermal Energy PDF Author: Donald W. Brown
Publisher: Springer Science & Business Media
ISBN: 3540689109
Category : Science
Languages : en
Pages : 669

Book Description
Mining the Earth's Heat: Hot Dry Rock Geothermal Energy describes the work carried out by the Los Alamos National Laboratory to turn an idealistic concept - that of drawing useful amounts of energy from the vast underground store of hot rock at reachable depths - into a practical reality. This book provides comprehensive documentation of the over two decades of experiments carried out at the test site at Fenton Hill, New Mexico, where the feasibility of accessing and extracting this vast natural resource was finally demonstrated. It also discusses the numerous technical, administrative, and financial hurdles that had to be overcome along the way. This publication will no doubt prove invaluable to researchers around the world as they strive to move this now-proven technology toward commercial viability. In addition, it is a valuable source of relevant information for anyone interested in the world energy outlook for the 21st century and beyond.

Hot Dry Rock Geothermal Reservoir Engineering

Hot Dry Rock Geothermal Reservoir Engineering PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Book Description
Two wells, GT-2 and EE-1, were originally drilled to a depth of 9600 ft (2.93 km) and 10,000 ft (3.05 km), respectively, and, after some difficulties, including redrilling of the bottom portion of GT-2, a good fracture connection was made between EE-1 and GT-2B, as the modified GT-2 was called. The circulation system was studied extensively for the purpose of establishing a number of fracture properties. Techniques were developed to determine orientation, geometry, heat exchange area, volume, flow impedance and impedance distribution. A much larger fracture system was then created from a depth of 9620 ft (2.93 km) in EE-1. The techniques used and results obtained in the study of the new and old fracture systems are discussed. (MHR).

Reservoir Modeling of the Phase II Hot Dry Rock System

Reservoir Modeling of the Phase II Hot Dry Rock System PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Book Description
The Phase II system has been created with a series of hydraulic fracturing experiments at the Fenton Hill Hot Dry Rock site. Experiment 2032, the largest of the fracturing operations, involved injecting 5.6 million gallons (21,200m3) of water into wellbore EE-2 over the period December 6-9, 1983. The experiment has been modeled using geothermal simulator FEHM developed at Los Alamos National Laboratory. The modeling effort has produced strong evidence of a large highly fractured reservoir. Two long term heat extraction schemes for the reservoir are studied with the model.

Hot Dry Rock Reservoir Engineering

Hot Dry Rock Reservoir Engineering PDF Author: Hugh Murphy
Publisher:
ISBN:
Category : Hot dry rock systems
Languages : en
Pages :

Book Description


Hot Dry Rock Geothermal Reservoir Engineering

Hot Dry Rock Geothermal Reservoir Engineering PDF Author: R. Lee Aamodt
Publisher:
ISBN:
Category : Hot dry rock systems
Languages : en
Pages :

Book Description


Het ontroerde Nederlandt, door de Wapenen des Konings van Vrankrÿk

Het ontroerde Nederlandt, door de Wapenen des Konings van Vrankrÿk PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Book Description


Hot Dry Rock Geothermal Energy Development Program Annual Report Fiscal Year ...

Hot Dry Rock Geothermal Energy Development Program Annual Report Fiscal Year ... PDF Author: Hot Dry Rock Program (U.S.)
Publisher:
ISBN:
Category : Geothermal engineering
Languages : en
Pages : 224

Book Description


Hot Dry Rock Energy

Hot Dry Rock Energy PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 54

Book Description
Extended flow testing at the Fenton Hill Hot Dry Rock (HDR) test facility concluded in Fiscal Year 1993 with the completion of Phase 2 of the long-term flow test (LTFT) program. As is reported in detail in this report, the second phase of the LTFT, although only 55 days in duration, confirmed in every way the encouraging test results of the 112-day Phase I LTFT carried out in Fiscal Year 1992. Interim flow testing was conducted early in FY 1993 during the period between the two LTFT segments. In addition, two brief tests involving operation of the reservoir on a cyclic schedule were run at the end of the Phase 2 LTFT. These interim and cyclic tests provided an opportunity to conduct evaluations and field demonstrations of several reservoir engineering concepts that can now be applied to significantly increase the productivity of HDR systems. The Fenton Hill HDR test facility was shut down and brought into standby status during the last part of FY 1993. Unfortunately, the world's largest, deepest, and most productive HDR reservoir has gone essentially unused since that time.