Routine reactor operation with four end-of-cycle shutdowns and two unscheduled shutdowns resulted in an on-stream time of 91.3% for the quarter. The outer control plates and the inner control cylinder were changed and a semi-annual core component inspection was made.
High Flux Isotope Reactor Quarterly Report, July, August, and September of 1981
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description
Routine reactor operation with four end-of-cycle shutdowns and two unscheduled shutdowns resulted in an on-stream time of 91.3% for the quarter. The outer control plates and the inner control cylinder were changed and a semi-annual core component inspection was made.
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description
Routine reactor operation with four end-of-cycle shutdowns and two unscheduled shutdowns resulted in an on-stream time of 91.3% for the quarter. The outer control plates and the inner control cylinder were changed and a semi-annual core component inspection was made.
High Flux Isotope Reactor Quarterly Report, July, August, and September of 1972
High Flux Isotope Reactor Quarterly Report, July, August, and September of 1974
HIGH FLUX ISOTOPE REACTOR QUARTERLY REPORT, JULY--SEPTEMBER OF 1966
High Flux Isotope Reactor Quarterly Report, July, August, and September of 1976
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description
An extended shutdown to replace part of the beryllium reflector reduced the operating time for the quarter to 88 percent and the operating time for the year to 92.9 percent. The semiannual reactor component inspection was completed and the control plates were changed. Basic operating data for the quarter are listed.
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description
An extended shutdown to replace part of the beryllium reflector reduced the operating time for the quarter to 88 percent and the operating time for the year to 92.9 percent. The semiannual reactor component inspection was completed and the control plates were changed. Basic operating data for the quarter are listed.
High Flux Isotope Reactor. Quarterly Report, April, May, and June 1981
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description
Routine reactor operation with four end-of-cycle shutdowns resulted in an on-stream time of 92.3% for the quarter. The outer control pates were changed and a semi-annual core component inspection made.
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description
Routine reactor operation with four end-of-cycle shutdowns resulted in an on-stream time of 92.3% for the quarter. The outer control pates were changed and a semi-annual core component inspection made.
Energy Research Abstracts
High Flux Isotope Reactor. Quarterly Report, January, February, and March 1981
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description
Routine reactor operation with four end-of-cycle shutdowns and two unscheduled shutdowns resulted in an on-stream time of 94.9% for the quarter.
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description
Routine reactor operation with four end-of-cycle shutdowns and two unscheduled shutdowns resulted in an on-stream time of 94.9% for the quarter.