HIGH FLUX ISOTOPE REACTOR QUARTERLY REPORT, JANUARY, FEBRUARY, AND MARCH OF 1967
HIGH FLUX ISOTOPE REACTOR QUARTERLY REPORT, APRIL--JUNE 1967
OAK RIDGE RESEARCH REACTOR QUARTERLY REPORT, JANUARY, FEBRUARY, AND MARCH OF 1967
HIGH FLUX ISOTOPE REACTOR QUARTERLY REPORT, JANUARY--MARCH 1966
High Flux Isotope Reactor Quarterly Report, January, February, and March, 1976
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description
Routine reactor operation with only three end-of-cycle shutdowns this quarter resulted in an on-stream time of 95.0 percent. The semiannual reactor component inspection was completed, and the control plates were changed. Basic operating data for the quarter are listed.
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description
Routine reactor operation with only three end-of-cycle shutdowns this quarter resulted in an on-stream time of 95.0 percent. The semiannual reactor component inspection was completed, and the control plates were changed. Basic operating data for the quarter are listed.
High Flux Isotope Reactor. Quarterly Report, January, February, and March 1981
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description
Routine reactor operation with four end-of-cycle shutdowns and two unscheduled shutdowns resulted in an on-stream time of 94.9% for the quarter.
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description
Routine reactor operation with four end-of-cycle shutdowns and two unscheduled shutdowns resulted in an on-stream time of 94.9% for the quarter.