Early Site Permit (ESP) at the Vogtle Electric Generating Plant Site PDF Download
Are you looking for read ebook online? Search for your book and save it on your Kindle device, PC, phones or tablets. Download Early Site Permit (ESP) at the Vogtle Electric Generating Plant Site PDF full book. Access full book title Early Site Permit (ESP) at the Vogtle Electric Generating Plant Site by . Download full books in PDF and EPUB format.
Author: U.s. Nuclear Regulatory Comion Publisher: CreateSpace ISBN: 9781499623383 Category : Science Languages : en Pages : 534
Book Description
The U.S. Nuclear Regulatory Commission (NRC) regulations in Title 10 of the Code of Federal Regulations (10 CFR) Part 52 include requirements for licensing new nuclear power plants.3 These regulations include the NRC's requirements for early site permit (ESP), design certification, and combined license (COL) applications. The ESP process (10 CFR Part 52, Subpart A, “Early Site Permits”) is intended to address and resolve siting-related issues. The design certification process (10 CFR Part 52, Subpart B, “Standard Design Certifications”) provides a means for a vendor to obtain NRC certification of a particular reactor design. Finally, the COL process (10 CFR Part 52, Subpart C, “Combined Licenses”) allows an applicant to seek authorization to construct and operate a new nuclear power plant. A COL may reference an ESP, a certified design, both, or neither. As part of demonstrating that all applicable NRC requirements are met, a COL applicant referencing an ESP or certified design must demonstrate compliance with any requirements not already resolved as part of the referenced ESP or design certification before the NRC issues that COL.
Author: U.s. Nuclear Regulatory Comion Publisher: CreateSpace ISBN: 9781499623512 Category : Science Languages : en Pages : 542
Book Description
The U.S. Nuclear Regulatory Commission (NRC) regulations in Title 10 of the Code of Federal Regulations (10 CFR) Part 52 include requirements for licensing new nuclear power plants.3 These regulations include the NRC's requirements for early site permit (ESP), design certification, and combined license (COL) applications. The ESP process (10 CFR Part 52, Subpart A, “Early Site Permits”) is intended to address and resolve siting-related issues. The design certification process (10 CFR Part 52, Subpart B, “Standard Design Certifications”) provides a means for a vendor to obtain NRC certification of a particular reactor design. Finally, the COL process (10 CFR Part 52, Subpart C, “Combined Licenses”) allows an applicant to seek authorization to construct and operate a new nuclear power plant. A COL may reference an ESP, a certified design, both, or neither. As part of demonstrating that all applicable NRC requirements are met, a COL applicant referencing an ESP or certified design must demonstrate compliance with any requirements not already resolved as part of the referenced ESP or design certification before the NRC issues that COL.
Author: U.s. Nuclear Regulatory Comion Publisher: CreateSpace ISBN: 9781499623574 Category : Science Languages : en Pages : 442
Book Description
The U.S. Nuclear Regulatory Commission (NRC) regulations in Title 10 of the Code of Federal Regulations (10 CFR) Part 52 include requirements for licensing new nuclear power plants.3 These regulations include the NRC's requirements for early site permit (ESP), design certification, and combined license (COL) applications. The ESP process (10 CFR Part 52, Subpart A, “Early Site Permits”) is intended to address and resolve siting-related issues. The design certification process (10 CFR Part 52, Subpart B, “Standard Design Certifications”) provides a means for a vendor to obtain NRC certification of a particular reactor design. Finally, the COL process (10 CFR Part 52, Subpart C, “Combined Licenses”) allows an applicant to seek authorization to construct and operate a new nuclear power plant. A COL may reference an ESP, a certified design, both, or neither. As part of demonstrating that all applicable NRC requirements are met, a COL applicant referencing an ESP or certified design must demonstrate compliance with any requirements not already resolved as part of the referenced ESP or design certification before the NRC issues that COL.
Author: Publisher: ISBN: Category : CD-ROMs Languages : en Pages :
Book Description
Documents comprising Exelon Generation Company's Early Site Permit (ESP) application for preapproval of a site near the Clinton Power Station in De Witt County, Illinois for construction of an addition nuclear power plant. Vespasian Warner Public Libray District (310 North Quincy Street, Clinton, IL 61727, telephone 217-935-5174, fax 217-935-4435) is the designated depository for all information concerning this site application.