Author: United States. Army. Corps of Engineers. Rock Island District
Publisher:
ISBN:
Category : Flood control
Languages : en
Pages :
Book Description
Upper Mississippi River, Nine-foot Channel Navigation Project, Rehabilitation Project, General Design Memorandum, Pools 11 and 15
Author: United States. Army. Corps of Engineers. Rock Island District
Publisher:
ISBN:
Category : Flood control
Languages : en
Pages :
Book Description
Publisher:
ISBN:
Category : Flood control
Languages : en
Pages :
Book Description
Revision of Master Plan for Resource Management
The Upper Mississippi River Navigation Improvement Providing a 9 Ft. Channel Depth Between Minneapolis and the Missouri River
Author: United States. Army. Corps of Engineers
Publisher:
ISBN:
Category : Mississippi River
Languages : en
Pages : 30
Book Description
Publisher:
ISBN:
Category : Mississippi River
Languages : en
Pages : 30
Book Description
9-foot Navigation Channel Project, Channel Maintenance Management Plan, Upper Mississippi River, Head of Navigation to Guttenburg
Operations and Maintenance, Upper Mississippi River 9-foot Navigation Channel, Pools 11 Through 22, Iowa and Missouri
Author: United States. Army. Corps of Engineers. Rock Island District
Publisher:
ISBN:
Category : Environmental impact statements
Languages : en
Pages :
Book Description
Publisher:
ISBN:
Category : Environmental impact statements
Languages : en
Pages :
Book Description
Great Implementation, 9-foot Channel Project, Upper Mississippi River
Author: United States. Army. Corps of Engineers. St. Paul District
Publisher:
ISBN:
Category : Channels (Hydraulic engineering)
Languages : en
Pages :
Book Description
Publisher:
ISBN:
Category : Channels (Hydraulic engineering)
Languages : en
Pages :
Book Description
Operations and Maintenance, Upper Mississippi River, 9-foot Navigation Channel
Upper Mississippi River 9-foot Navigation Channel, Operations and Maintenance, Pool 15
Author: United States. Army. Corps of Engineers. Rock Island District
Publisher:
ISBN:
Category : Environmental impact statements
Languages : en
Pages :
Book Description
Publisher:
ISBN:
Category : Environmental impact statements
Languages : en
Pages :
Book Description
Project Design Memorandum No. 5-3, Navigation Channel and Appurtances
Author:
Publisher:
ISBN:
Category : Channels (Hydraulic engineering)
Languages : en
Pages : 176
Book Description
Publisher:
ISBN:
Category : Channels (Hydraulic engineering)
Languages : en
Pages : 176
Book Description
Design Analysis Report for Lower Pool 5 Channel Maintenance/Weaver Bottoms Rehabilitation Plan on the Upper Mississippi River
Author: CORPS OF ENGINEERS ST PAUL MN ST PAUL DISTRICT.
Publisher:
ISBN:
Category :
Languages : en
Pages : 207
Book Description
The 9-foot navigation channel on the Upper Mississippi River was authorized by the Rivers and Harbors Act of July 3, 1930, and other legislation. The great River Environmental Action Team (GREAT) I study was organized in 1973 to identify and assess the problems associated with multipurpose use of the Mississippi River. One of the main products of the GREAT I study was a 40-year channel maintenance plan for the river. The project discussed in this supplement would implement the general channel maintenance plan for lower pool 5 on the Upper Mississippi River, including the rehabilitation of the 4,000-acre backwater lake, Weaver Bottoms. The primary objectives of the project are to develop a 40-year channel maintenance plan for lower pool 5, reduce maintenance dredging requirements in lower pool 5, and restore the habitat quality to the Weaver Bottoms area, by modifying side channels and constructing islands with maintenance-dredged material.
Publisher:
ISBN:
Category :
Languages : en
Pages : 207
Book Description
The 9-foot navigation channel on the Upper Mississippi River was authorized by the Rivers and Harbors Act of July 3, 1930, and other legislation. The great River Environmental Action Team (GREAT) I study was organized in 1973 to identify and assess the problems associated with multipurpose use of the Mississippi River. One of the main products of the GREAT I study was a 40-year channel maintenance plan for the river. The project discussed in this supplement would implement the general channel maintenance plan for lower pool 5 on the Upper Mississippi River, including the rehabilitation of the 4,000-acre backwater lake, Weaver Bottoms. The primary objectives of the project are to develop a 40-year channel maintenance plan for lower pool 5, reduce maintenance dredging requirements in lower pool 5, and restore the habitat quality to the Weaver Bottoms area, by modifying side channels and constructing islands with maintenance-dredged material.