Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 188
Book Description
Upper Mississippi River 9-ft Navigation Channel, Pt.11-22
Inland Navigation System Planning
Author: National Research Council
Publisher: National Academies Press
ISBN: 9780309074056
Category : Nature
Languages : en
Pages : 134
Book Description
In 1988, the U.S. Army Corps of Engineers began an investigation of the benefits and costs of extending several locks on the lower portion of the Upper Mississippi River-Illinois Waterway (UMR-IWW) in order to relieve increasing waterway congestion, particularly for grain moving to New Orleans for export. With passage of the Flood Control Act of 1936, Congress required that the Corps conduct a benefit-cost analysis as part of its water resources project planning; Congress will fund water resources projects only if a project's benefits exceed its costs. As economic analysis generally, and benefit-cost analysis in particular, has become more sophisticated, and as environmental and social considerations and analysis have become more important, Corps planning studies have grown in size and complexity. The difficulty in commensurating market and nonmarket costs and benefits also presents the Corps with a significant challenge. The Corps' analysis of the UMR-IWW has extended over a decade, has cost roughly $50 million, and has involved consultations with other federal agencies, state conservation agencies, and local citizens. The analysis has included many consultants and has produced dozens of reports. In February 2000, the U.S. Department of Defense (DOD) requested that the National Academies review the Corps' final feasibility report. After discussions and negotiations with DOD, in April 2000 the National Academies launched this review and appointed an expert committee to carry it out.
Publisher: National Academies Press
ISBN: 9780309074056
Category : Nature
Languages : en
Pages : 134
Book Description
In 1988, the U.S. Army Corps of Engineers began an investigation of the benefits and costs of extending several locks on the lower portion of the Upper Mississippi River-Illinois Waterway (UMR-IWW) in order to relieve increasing waterway congestion, particularly for grain moving to New Orleans for export. With passage of the Flood Control Act of 1936, Congress required that the Corps conduct a benefit-cost analysis as part of its water resources project planning; Congress will fund water resources projects only if a project's benefits exceed its costs. As economic analysis generally, and benefit-cost analysis in particular, has become more sophisticated, and as environmental and social considerations and analysis have become more important, Corps planning studies have grown in size and complexity. The difficulty in commensurating market and nonmarket costs and benefits also presents the Corps with a significant challenge. The Corps' analysis of the UMR-IWW has extended over a decade, has cost roughly $50 million, and has involved consultations with other federal agencies, state conservation agencies, and local citizens. The analysis has included many consultants and has produced dozens of reports. In February 2000, the U.S. Department of Defense (DOD) requested that the National Academies review the Corps' final feasibility report. After discussions and negotiations with DOD, in April 2000 the National Academies launched this review and appointed an expert committee to carry it out.
Federal Register
Author:
Publisher:
ISBN:
Category : Delegated legislation
Languages : en
Pages : 388
Book Description
Publisher:
ISBN:
Category : Delegated legislation
Languages : en
Pages : 388
Book Description
102 Monitor
Author:
Publisher:
ISBN:
Category : Administrative agencies
Languages : en
Pages : 104
Book Description
Publisher:
ISBN:
Category : Administrative agencies
Languages : en
Pages : 104
Book Description
Draft Environmental Impact Statement
Author: United States. Army. Corps of Engineers
Publisher:
ISBN:
Category : Environmental impact analysis
Languages : en
Pages : 1216
Book Description
Publisher:
ISBN:
Category : Environmental impact analysis
Languages : en
Pages : 1216
Book Description
Final Environmental Impact Statement
Author: United States. Army. Corps of Engineers
Publisher:
ISBN:
Category : Environmental impact statements
Languages : en
Pages : 694
Book Description
Publisher:
ISBN:
Category : Environmental impact statements
Languages : en
Pages : 694
Book Description
Upper Mississippi River-Illinois Waterway System Navigation Feasibility Study, Integrated Feasiblity Report
GREAT I
Author: Great River Environmental Action Team (U.S.)
Publisher:
ISBN:
Category : Dredges
Languages : en
Pages : 380
Book Description
Publisher:
ISBN:
Category : Dredges
Languages : en
Pages : 380
Book Description
Great River Environmental Action Team, GREAT I, Upper Mississippi River Study, Guttenberg, IA to Minneapolis, MN
GREAT II
Author:
Publisher:
ISBN:
Category : Conservation of natural resources
Languages : en
Pages : 326
Book Description
Publisher:
ISBN:
Category : Conservation of natural resources
Languages : en
Pages : 326
Book Description