Author: S. Masood Husian
Publisher:
ISBN:
Category : Railroads
Languages : en
Pages : 7
Book Description
Trans-Asian Railway Network Project
Author: S. Masood Husian
Publisher:
ISBN:
Category : Railroads
Languages : en
Pages : 7
Book Description
Publisher:
ISBN:
Category : Railroads
Languages : en
Pages : 7
Book Description
Progress on the Trans-Asian Railway Project and Its Extended Scope to Include Intermodal Aspects
Author: UN. ESCAP. Secretariat
Publisher:
ISBN:
Category :
Languages : en
Pages : 3
Book Description
Publisher:
ISBN:
Category :
Languages : en
Pages : 3
Book Description
Trans-Asian Railway Network Project
Development of the Trans-Asian Railway
Author: United Nations. Economic and Social Commission for Asia and the Pacific
Publisher: New York : United Nations
ISBN: 9789211200997
Category : Business & Economics
Languages : en
Pages : 105
Book Description
The Trans-Asian Railway (TAR) project is part of the integrated Asian Land Transport Infrastructure Development (ALTID project. The routes for the projected North-South corridor of TAR would commence at Helsinki (Finland) and end at the port of Bandar Abbas on the Southern coast of Iran. The sections currently under construction are located in Iran, Kazakhstan and Turkmenistan. Four different track gauges have to be inter-connected in the TAR. Other problem areas include:- delays at border crossings; the enhancement of traffic information and forecasting systems; the need for co-operation in operational planning and tariff structure; the importance of recommended minimum technical standards.
Publisher: New York : United Nations
ISBN: 9789211200997
Category : Business & Economics
Languages : en
Pages : 105
Book Description
The Trans-Asian Railway (TAR) project is part of the integrated Asian Land Transport Infrastructure Development (ALTID project. The routes for the projected North-South corridor of TAR would commence at Helsinki (Finland) and end at the port of Bandar Abbas on the Southern coast of Iran. The sections currently under construction are located in Iran, Kazakhstan and Turkmenistan. Four different track gauges have to be inter-connected in the TAR. Other problem areas include:- delays at border crossings; the enhancement of traffic information and forecasting systems; the need for co-operation in operational planning and tariff structure; the importance of recommended minimum technical standards.
Trans-Asian Railway Project
Report on Survey for Modernization of the State Railway of Thailand (Trans-Asian Railway Project).
Report on the Preliminary Survey in Iran on the Trans-Asian Railway Network Project
Author: Kaigai Tetsudō Gijutsu Kyōryoku Kyōkai
Publisher:
ISBN:
Category : Railroads
Languages : en
Pages : 84
Book Description
Publisher:
ISBN:
Category : Railroads
Languages : en
Pages : 84
Book Description
Development of the Trans-Asian Railway
Author: United Nations. Economic and Social Commission for Asia and the Pacific
Publisher: United Nations Publications
ISBN:
Category : Business & Economics
Languages : en
Pages : 116
Book Description
The Trans-Asian Railway (TAR) project is part of the integrated Asian Land Transport Infrastructure Development (ALTID project. The routes for the projected North-South corridor of TAR would commence at Helsinki (Finland) and end at the port of Bandar Abbas on the Southern coast of Iran. The sections currently under construction are located in Iran, Kazakhstan and Turkmenistan. Four different track gauges have to be inter-connected in the TAR. Other problem areas include:- delays at border crossings; the enhancement of traffic information and forecasting systems; the need for co-operation in operational planning and tariff structure; the importance of recommended minimum technical standards.
Publisher: United Nations Publications
ISBN:
Category : Business & Economics
Languages : en
Pages : 116
Book Description
The Trans-Asian Railway (TAR) project is part of the integrated Asian Land Transport Infrastructure Development (ALTID project. The routes for the projected North-South corridor of TAR would commence at Helsinki (Finland) and end at the port of Bandar Abbas on the Southern coast of Iran. The sections currently under construction are located in Iran, Kazakhstan and Turkmenistan. Four different track gauges have to be inter-connected in the TAR. Other problem areas include:- delays at border crossings; the enhancement of traffic information and forecasting systems; the need for co-operation in operational planning and tariff structure; the importance of recommended minimum technical standards.
Report on the Preliminary Survey in Thailand and Malaysia on the Trans-Asian Railway Network Project
Author: Kaigai Tetsudō Gijutsu Kyōryoku Kyōkai
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description
Report on the Preliminary Survey in Pakistan on the Trans-Asian Railway Network Project
Author: Kaigai Tetsudō Gijutsu Kyōryoku Kyōkai
Publisher:
ISBN:
Category :
Languages : en
Pages : 53
Book Description
Publisher:
ISBN:
Category :
Languages : en
Pages : 53
Book Description