Author:
Publisher:
ISBN:
Category : Harbors
Languages : en
Pages : 464
Book Description
Final Supplemental Environmental Impact Statement/environmental Impact Report, Richmond Harbor Navigation Improvements
Draft Supplemental Environmental Impact Statement/environmental Impact Report, Richmond Harbor Deep-draft Navigation Improvements
Draft Supplement III to Final Environmental Statement and Draft Environmental Impact Report
Supplement to the Sanguine System Final Environmental Impact Statement for Research, Development, Test and Evaluation
Author: United States. Naval Electronic Systems Command. Sanguine Division
Publisher:
ISBN:
Category : Communications, Military
Languages : en
Pages : 290
Book Description
Publisher:
ISBN:
Category : Communications, Military
Languages : en
Pages : 290
Book Description
Final Supplement to the Environmental Impact Statement
Final Supplement to the Final Environmental Impact Statement, Flood Control, Portage, Wisconsin
Final Environmental Impact Statement
Author: United States. Environmental Protection Agency. Region IX.
Publisher:
ISBN:
Category : Water
Languages : en
Pages : 718
Book Description
Publisher:
ISBN:
Category : Water
Languages : en
Pages : 718
Book Description
Final Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-level Radioactive Waste at Yucca Mountain, Nye County, Nevada: pt. 1. Comment-response document, Introduction, etc
Author:
Publisher:
ISBN:
Category : Radioactive waste disposal in the ground
Languages : en
Pages : 786
Book Description
The purpose of this environmental impact statement (EIS) is to provide information on potential environmental impacts that could result from a Proposed Action to construct, operate and monitor, and eventually close a geologic repository for the disposal of spent nuclear fuel and high-level radioactive waste at the Yucca Mountain site in Nye County, Nevada. The EIS also provides information on potential environmental impacts from an alternative referred to as the No-Action Alternative, under which there would be no development of a geologic repository at Yucca Mountain.
Publisher:
ISBN:
Category : Radioactive waste disposal in the ground
Languages : en
Pages : 786
Book Description
The purpose of this environmental impact statement (EIS) is to provide information on potential environmental impacts that could result from a Proposed Action to construct, operate and monitor, and eventually close a geologic repository for the disposal of spent nuclear fuel and high-level radioactive waste at the Yucca Mountain site in Nye County, Nevada. The EIS also provides information on potential environmental impacts from an alternative referred to as the No-Action Alternative, under which there would be no development of a geologic repository at Yucca Mountain.
Energy Research Abstracts
Wisconsin State Highway 23, Fond Du Lac to Plymouth, Fond Du Lac and Sheboygan Counties, Wisconsin
Author:
Publisher:
ISBN:
Category : Land use
Languages : en
Pages : 362
Book Description
Wisconsin Highway 23 is part of the National Highway System (NHS) and is a rural principal arterial that connects Fond du Lac and Sheboygan in east central Wisconsin. Both west and east ends of the project are located in growing urban areas of Fond du Lac and Plymouth. Nearly 20 miles in length, this highway corridor serves high traffic volumes near the urban areas and lower traffic volumes in rural areas. This combined Limited Scope Final Environmental Impact Statement and Record of Decision (LS SFEIS/ROD) evaluates the No- Build Alternative, several Build Alternatives, and a series of corridor preservation alternatives for future transportation improvements, and selects an alternative. The Preferred Build Alternative is the Selected Alternative and reconstructs WIS 23 to a 4-lane divided highway on the existing alignment and creates interchanges, connector roads, and a trail. Corridor roads as well as the UW 151/WIS 23 interchange.
Publisher:
ISBN:
Category : Land use
Languages : en
Pages : 362
Book Description
Wisconsin Highway 23 is part of the National Highway System (NHS) and is a rural principal arterial that connects Fond du Lac and Sheboygan in east central Wisconsin. Both west and east ends of the project are located in growing urban areas of Fond du Lac and Plymouth. Nearly 20 miles in length, this highway corridor serves high traffic volumes near the urban areas and lower traffic volumes in rural areas. This combined Limited Scope Final Environmental Impact Statement and Record of Decision (LS SFEIS/ROD) evaluates the No- Build Alternative, several Build Alternatives, and a series of corridor preservation alternatives for future transportation improvements, and selects an alternative. The Preferred Build Alternative is the Selected Alternative and reconstructs WIS 23 to a 4-lane divided highway on the existing alignment and creates interchanges, connector roads, and a trail. Corridor roads as well as the UW 151/WIS 23 interchange.