Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 408
Book Description
This report reviews the status of past, present, and proposed future wildlife planning and mitigation programs at existing hydroelectric projects in the Columbia River Basin. The project evaluations will form the basis for determining any needed remedial measures or additional project analysis. Each hydropower facility report is abstracted separately for inclusion in the Energy Data Base.
Status Review of Wildlife Mitigation, Columbia Basin Hydroelectric Projects, Columbia River Mainstem Facilities, 1984 Final Report
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 408
Book Description
This report reviews the status of past, present, and proposed future wildlife planning and mitigation programs at existing hydroelectric projects in the Columbia River Basin. The project evaluations will form the basis for determining any needed remedial measures or additional project analysis. Each hydropower facility report is abstracted separately for inclusion in the Energy Data Base.
Publisher:
ISBN:
Category :
Languages : en
Pages : 408
Book Description
This report reviews the status of past, present, and proposed future wildlife planning and mitigation programs at existing hydroelectric projects in the Columbia River Basin. The project evaluations will form the basis for determining any needed remedial measures or additional project analysis. Each hydropower facility report is abstracted separately for inclusion in the Energy Data Base.
Status Review of Wildlife Mitigation, Columbia Basin Hydroelectric Projects, Washington Facilities (Intrastate) Final Report
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 230
Book Description
This report was prepared for BPA in fulfillment of section 1004 (b)(1) of the Pacific Northwest Electric Power Planning and Conservation Act of 1980, to review the status of past, present, and proposed future wildlife planning and mitigation program at existing hydroelectric projects in the Columbia River Basin. The project evaluations will form the basis for determining any needed remedial measures or additional project analysis. Projects addressed are: Merwin Dam; Swift Project; Yale Project; Cowlitz River; Boundary Dam; Box Canyon Dam; Lake Chelan; Condit Project; Enloe Project; Spokane River; Tumwater and Dryden Dam; Yakima; and Naches Project.
Publisher:
ISBN:
Category :
Languages : en
Pages : 230
Book Description
This report was prepared for BPA in fulfillment of section 1004 (b)(1) of the Pacific Northwest Electric Power Planning and Conservation Act of 1980, to review the status of past, present, and proposed future wildlife planning and mitigation program at existing hydroelectric projects in the Columbia River Basin. The project evaluations will form the basis for determining any needed remedial measures or additional project analysis. Projects addressed are: Merwin Dam; Swift Project; Yale Project; Cowlitz River; Boundary Dam; Box Canyon Dam; Lake Chelan; Condit Project; Enloe Project; Spokane River; Tumwater and Dryden Dam; Yakima; and Naches Project.
Status Review of Wildlife Mitigation, Columbia Basin Hydroelectic Projects
Author: Jack Howerton
Publisher:
ISBN:
Category : Hydroelectric power plants
Languages : en
Pages :
Book Description
Publisher:
ISBN:
Category : Hydroelectric power plants
Languages : en
Pages :
Book Description
Columbia River System Operation Review (SOR)
Energy Research Abstracts
Energy Research Abstracts
ERDA Energy Research Abstracts
Rock Island Hydroelectric Project No.943, Washington
Columbia and Snake Rivers, 1992 Salmon Flow Measures (ID,OR,WA), Options Analysis Document
Status Review of Wildlife Mitigation, Columbia Basin Hydroelectric Projects
Author: Jack Howerton
Publisher:
ISBN:
Category : Conservation of natural resources
Languages : en
Pages : 228
Book Description
Publisher:
ISBN:
Category : Conservation of natural resources
Languages : en
Pages : 228
Book Description