Space Shuttle Advanced Solid Rocket Motor (ASRM) Program, Design, Construction and Operation of New Facilities for Manufacturing and Testing (MS,FL,LA) PDF Download
Are you looking for read ebook online? Search for your book and save it on your Kindle device, PC, phones or tablets. Download Space Shuttle Advanced Solid Rocket Motor (ASRM) Program, Design, Construction and Operation of New Facilities for Manufacturing and Testing (MS,FL,LA) PDF full book. Access full book title Space Shuttle Advanced Solid Rocket Motor (ASRM) Program, Design, Construction and Operation of New Facilities for Manufacturing and Testing (MS,FL,LA) by . Download full books in PDF and EPUB format.
Author: Publisher: ISBN: Category : Languages : en Pages : 712
Book Description
The proposed action is design, development, testing, and evaluation of Advanced Solid Rocket Motors (ASRM) to replace the motors currently used to launch the Space Shuttle. The proposed action includes design, construction, and operation of new government-owned, contractor-operated facilities for manufacturing and testing the ASRMs. The proposed action also includes transport of propellant-filled rocket motor segments from the manufacturing facility to the testing and launch sites and the return of used and/or refurbished segments to the manufacturing site. Sites being considered for the new facilities include John C. Stennis Space Center, Hancock County, Mississippi; the Yellow Creek site in Tishomingo County, Mississippi, which is currently in the custody and control of the Tennessee Valley Authority; and John F. Kennedy Space Center, Brevard County, Florida. TVA proposes to transfer its site to the custody and control of NASA if it is the selected site. All facilities need not be located at the same site. Existing facilities which may provide support for the program include Michoud Assembly Facility, New Orleans Parish, Louisiana; and Slidell Computer Center, St. Tammany Parish, Louisiana. NASA's preferred production location is the Yellow Creek site, and the preferred test location is the Stennis Space Center.
Author: Publisher: ISBN: Category : Languages : en Pages : 624
Book Description
The proposed action is design, development, testing, and evaluation of Advanced Solid Rocket Motors (ASRM) to replace the motors currently used to launch the Space Shuttle. The proposed action includes design, construction, and operation of new government-owned, contractor-operated facilities for manufacturing and testing the ASRMs. The proposed action also includes transport of propellant-filled rocket motor segments from the manufacturing facility to the testing and launch sites and the return of used and/or refurbished segments to the manufacturing site.
Author: Publisher: ISBN: Category : Construction contracts Languages : en Pages : 9
Book Description
In January 1992, the President proposed termination of the National Aeronautics and Space Administration's (NASA) Advanced Solid Rocket Motor (ASRM) program. However, he left open the possibility that the program could be reinstated during congressional budget deliberations for fiscal year 1993. According to NASA, if the program is continued, maintaining the current program schedule is critical so that the advanced motors will be available to transport the Space Station Freedom's laboratory module in February 1997. As a result, NASA is pursuing the facility construction program for fiscal year 1992 as originally planned. The purpose of this letter is to identify construction activities that could be delayed pending a decision on the future of this program and still not adversely affect the scheduled ASRM launch date.
Author: United States. Congress. House. Committee on Science, Space, and Technology. Subcommittee on Space Science and Applications Publisher: ISBN: Category : Astronautics Languages : en Pages : 66
Author: National Aeronautics and Space Adm Nasa Publisher: Independently Published ISBN: 9781729302095 Category : Languages : en Pages : 54
Book Description
This interim final report summarizes the activities and major accomplishments under NASA/MSFC Contract NAS8-39235 for the initial two year contractual effort beginning October 1, 1991, and ending September 30, 1993. It is not intended as an exhaustive treatment or review of any particular technical issue which was addressed during this two-year period, but does provide an overview of the many induced environment studies and test support activities undertaken by REMTECH and its subcontractors during this two-year period. The initial scope of work has been pursued vigorously through this two-year period by separating the effort into five functional areas. The five functional areas are ascent plume radiation, ascent plume convection, ascent aerodynamic heating, launch stand environments, and reentry heating. A work breakdown structure (WBS) for each functional area was devised to permit nearly autonomous activities within each functional responsibility while maintaining commonality in reporting procedures and cost accounting. The contract was modified 11 times to provide incremental funding and to expand the scope of work. Additional work breakdown structure was incorporated to meet the expanded scope. A contract chronology is provided in Section 2. The initial scope of work, expanded scope, and corresponding WBS designation are described in Section 3. A summary review of major accomplishments is also provided in Section 4 to show the breadth of activities and extent of reporting. Reports, meetings, test activities, and other accomplishments within each functional area are also summarized by WBS heading in the appendices. Unspecified Center
Author: National Aeronautics and Space Adm Nasa Publisher: ISBN: 9781731031877 Category : Languages : en Pages : 106
Book Description
The Space Shuttle Redesigned Solid Rocket Motor (RSRM) Certification Program provides confidence that the RSRM and its components/subsystems meet or exceed Mission Oriented Requirements when manufactured per design requirements and specified/approved processes. Certification is based on documented results of tests, analyses, inspections, similarity, and demonstrations. Evidencing information is provided to certify that each RSRM component/subsystem satisfies design, mission related requirements and objectives. Duersch, Fred, Jr. Unspecified Center CERTIFICATION; QUALIFICATIONS; ROCKET ENGINE DESIGN; SPACE SHUTTLE BOOSTERS; ENGINE PARTS; ENGINE TESTS; INSPECTION; MISSION PLANNING...
Author: National Aeronautics and Space Adm Nasa Publisher: Independently Published ISBN: 9781730879685 Category : Science Languages : en Pages : 64
Book Description
The STS-78 Space Shuttle Program Mission Report summarizes the Payload activities as well as the Orbiter, External Tank (ET), Solid Rocket Booster (SRB), Reusable Solid Rocket Motor (RSRM), and the Space Shuttle main engine (SSME) systems performance during the seventy-eighth flight of the Space Shuttle Program, the fifty-third flight since the return-to-flight, and the twentieth flight of the Orbiter Columbia (OV-102). In addition to the Orbiter, the flight vehicle consisted of an ET that was designated ET-79; three SSME's that were designated as serial numbers 2041, 2039, and 2036 in positions 1, 2, and 3, respectively; and two SRB's that were designated BI-081. The RSRM's, designated RSRM-55, were installed in each SRB and the individual RSRM's were designated as 360L055A for the left SRB, and 360L055B for the right SRB. The STS-78 Space Shuttle Program Mission Report fulfills the Space Shuttle Program requirement as documented in NSTS 07700, Volume 7, Appendix E. The requirement stated in that document is that each organizational element supporting the Program will report the results of their hardware (and software) evaluation and mission performance plus identify all related in-flight anomalies. The primary objective of this flight was to successfully perform the planned operations of the Life and Microgravity Spacelab experiments. The secondary objectives of this flight were to complete the operations of the Orbital Acceleration Research Experiment (OARE), Biological Research in Canister Unit-Block II (BRIC), and the Shuttle Amateur Radio Experiment II-Configuration C (SAREX-II). The STS-78 mission was planned as a 16-day, plus one day flight plus two contingency days, which were available for weather avoidance or Orbiter contingency operations. The sequence of events for the STS-78 mission is shown in Table 1, and the Space Shuttle Vehicle Management Office Problem Tracking List is shown in Table 2. The Government Furnished Equipment/Flight Crew Equipment (GF...
Author: United States. Congress. Senate. Committee on Commerce, Science, and Transportation. Subcommittee on Science, Technology, and Space Publisher: ISBN: Category : Reusable space vehicles Languages : en Pages : 88