Resurvey of the El Paso Electric Co. 345KV Newman-to Luna Transmission Line Corridor East of the Rio Grande, Doña Ana County, New Mexico, December 2-12, 1994 PDF Download

Are you looking for read ebook online? Search for your book and save it on your Kindle device, PC, phones or tablets. Download Resurvey of the El Paso Electric Co. 345KV Newman-to Luna Transmission Line Corridor East of the Rio Grande, Doña Ana County, New Mexico, December 2-12, 1994 PDF full book. Access full book title Resurvey of the El Paso Electric Co. 345KV Newman-to Luna Transmission Line Corridor East of the Rio Grande, Doña Ana County, New Mexico, December 2-12, 1994 by John Philip Wilson. Download full books in PDF and EPUB format.

Resurvey of the El Paso Electric Co. 345KV Newman-to Luna Transmission Line Corridor East of the Rio Grande, Doña Ana County, New Mexico, December 2-12, 1994

Resurvey of the El Paso Electric Co. 345KV Newman-to Luna Transmission Line Corridor East of the Rio Grande, Doña Ana County, New Mexico, December 2-12, 1994 PDF Author: John Philip Wilson
Publisher:
ISBN:
Category : Doña Ana County (N.M.)
Languages : en
Pages : 49

Book Description


Resurvey of the El Paso Electric Co. 345KV Newman-to Luna Transmission Line Corridor East of the Rio Grande, Doña Ana County, New Mexico, December 2-12, 1994

Resurvey of the El Paso Electric Co. 345KV Newman-to Luna Transmission Line Corridor East of the Rio Grande, Doña Ana County, New Mexico, December 2-12, 1994 PDF Author: John Philip Wilson
Publisher:
ISBN:
Category : Doña Ana County (N.M.)
Languages : en
Pages : 49

Book Description


Monitoring of Site LA 108983, El Paso Electric Company 345KV Newman-to-Luna Transmission Line Corridor, Doña Ana County, New Mexico

Monitoring of Site LA 108983, El Paso Electric Company 345KV Newman-to-Luna Transmission Line Corridor, Doña Ana County, New Mexico PDF Author: John Philip Wilson
Publisher:
ISBN:
Category : Doña Ana County (N.M.)
Languages : en
Pages : 11

Book Description


El Paso Electric Company Diablo Substation to the US-Mexico Border 115kV Transmission Line Project. Final Environmental Assessment

El Paso Electric Company Diablo Substation to the US-Mexico Border 115kV Transmission Line Project. Final Environmental Assessment PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 118

Book Description
This Environmental Assessment documents the analysis of alternative corridors for development and operation of a proposed 115 kilovolt transmission line using private lands and transporting power to the US-Mexico international border. The project will require (1) an amendment to El Paso Electric Company's existing export authorization to transfer power across this border, and (2) a Presidential Permit for construction of the transmission line. The project would be located in Dona Ana county in southern New Mexico, approximately five miles west of El Paso, Texas. The alternative corridors, specific locations within those corridors, and structure types are identified and analyzed in the environmental studies.

Final Report of Archeological Investigations Along El Paso Electric Company's 345 KV Caliente-Newman-Amrad Transmission System on Fort Bliss, Texas

Final Report of Archeological Investigations Along El Paso Electric Company's 345 KV Caliente-Newman-Amrad Transmission System on Fort Bliss, Texas PDF Author: Barbara Kauffman
Publisher:
ISBN:
Category : Archaeological surveying
Languages : en
Pages : 120

Book Description
In the spring of 1984, El Paso Electric Company applied to the U.S. Army, Ft. Bliss, Texas, for a right-of-way for the construction of the 345 KV Caliente-Newman-Amrad power transmission system which would cross Maneuver Area I on Ft. Bliss. Prior to granting the right-of-way, the Ft. Bliss Directorate of Engineering and Housing (DEH) required that a program to assess the impact to historic properties within the proposed right-of-way be carried out. Of the 18 archaeological sites that might be impacted by the project, 12 could be completely avoided by relocating ground disturbing activities such as construction pads and access roads. Under the direction of a scope of work prepared by DEH, six sites that could not be avoided were subjected to surface collection and testing to determine the existence and/or extent of subsurface deposits. El Paso Electric contracted with the Cultural Resources Management Division of New Mexico State University to carry out the fieldwork. After consultation with Dr. Glenn DeGarmo (DEH-E), it was determined that five of the sites contained no subsurface deposits in the areas to be impacted. The sixth site (FB 3:1132) did have significant subsurface remains and therefore was avoided by all construction activities. Fieldwork was terminated at the conclusion of the surface collection and subsurface testing program without extensive data recovery being performed. Subsequently, El Paso Electric Company contracted with Batcho & Kauffman Associates to analyze and report on data recovered during the surface collection and testing program. This report presents the results of that analysis.

National Military Strategy of the United States

National Military Strategy of the United States PDF Author: United States. Joint Chiefs of Staff
Publisher:
ISBN:
Category : Technology & Engineering
Languages : en
Pages : 36

Book Description