Author:
Publisher:
ISBN:
Category : Coal gasification
Languages : en
Pages : 0
Book Description
Phase I, the Pipeline Gas Demonstration Plant: Process and project engineering design
Phase I
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description
Contract No. EF-77-C-01-2542 between Conoco Inc. and the US Department of Energy provides for the design, construction, and operation of a demonstration plant capable of processing bituminous caking coals into clean pipeline quality gas. The project is currently in the design phase (Phase I). This phase is scheduled to be completed in June 1981. One of the major efforts of Phase I is the process and project engineering design of the Demonstration Plant. The design has been completed and is being reported in 24 volumes. This is Volume 17 which reports the design of Plant Section 2500 - Plant and Instrument Air. The plant and instrument air system is designed to provide dry, compressed air for a multitude of uses in plant operations and maintenance. A single centrifugal air compressor provides the total plant and instrument air requirements. An air drying system reduces the dew point of the plant and instrument air. Plant Section 2500 is designed to provide air at 100/sup 0/F and 100 psig. Both plant and instrument air are dried to a -40/sup 0/F dew point. Normal plant and instrument air requirements total 1430 standard cubic feet per minute.
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description
Contract No. EF-77-C-01-2542 between Conoco Inc. and the US Department of Energy provides for the design, construction, and operation of a demonstration plant capable of processing bituminous caking coals into clean pipeline quality gas. The project is currently in the design phase (Phase I). This phase is scheduled to be completed in June 1981. One of the major efforts of Phase I is the process and project engineering design of the Demonstration Plant. The design has been completed and is being reported in 24 volumes. This is Volume 17 which reports the design of Plant Section 2500 - Plant and Instrument Air. The plant and instrument air system is designed to provide dry, compressed air for a multitude of uses in plant operations and maintenance. A single centrifugal air compressor provides the total plant and instrument air requirements. An air drying system reduces the dew point of the plant and instrument air. Plant Section 2500 is designed to provide air at 100/sup 0/F and 100 psig. Both plant and instrument air are dried to a -40/sup 0/F dew point. Normal plant and instrument air requirements total 1430 standard cubic feet per minute.
Demonstration Plant Engineering and Design. Phase I. The Pipeline Gas Demonstration Plant. Volume 8. Plant Section 600
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description
Contract No. EF-77-C-01-2542 between Conoco Inc. and the US Department of Energy provides for the design, construction, and operation of a demonstration plant capable of processing bituminous caking coals into clean pipeline quality gas. The project is currently in the design phase (Phase I). This phase is scheduled to be completed in June 1981. One of the major efforts of Phase I is the completion of the process design and the project engineering design of the Demonstration Plant. This design effort has been completed. A report of the design effort is being issued in 24 volumes. This is Volume 8 which reports the design of Plant Section 600 - CO2 removal. The CO2 Removal unit removes carbon dioxide from the gas exiting the shift/methanation primary reactors (Plant Section 500). The removal of the carbon dioxide increases the gross heating value of the methanated gas from 404 to 880 Btu per standard cubic foot. The CO2 free gas feeds the final methanator in Plant Section 500 which further upgrades the heating content of the SNG to pipeline quality standards. The carbon dioxide is removed from the methanated gas via absorption into a circulating solution of hot potassium carbonate. A Benfield process is employed for CO2 removal. A portion of the CO2 product from Plant Section 600 is used to pressurize the lock hoppers of the gasifier in Plant Section 300; the balance is vented to the atmosphere (26 million SCFC).
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description
Contract No. EF-77-C-01-2542 between Conoco Inc. and the US Department of Energy provides for the design, construction, and operation of a demonstration plant capable of processing bituminous caking coals into clean pipeline quality gas. The project is currently in the design phase (Phase I). This phase is scheduled to be completed in June 1981. One of the major efforts of Phase I is the completion of the process design and the project engineering design of the Demonstration Plant. This design effort has been completed. A report of the design effort is being issued in 24 volumes. This is Volume 8 which reports the design of Plant Section 600 - CO2 removal. The CO2 Removal unit removes carbon dioxide from the gas exiting the shift/methanation primary reactors (Plant Section 500). The removal of the carbon dioxide increases the gross heating value of the methanated gas from 404 to 880 Btu per standard cubic foot. The CO2 free gas feeds the final methanator in Plant Section 500 which further upgrades the heating content of the SNG to pipeline quality standards. The carbon dioxide is removed from the methanated gas via absorption into a circulating solution of hot potassium carbonate. A Benfield process is employed for CO2 removal. A portion of the CO2 product from Plant Section 600 is used to pressurize the lock hoppers of the gasifier in Plant Section 300; the balance is vented to the atmosphere (26 million SCFC).
Phase I
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description
Contract No. EF-77-C-01-2542 between Conoco Inc. and the US Department of Energy provides for the design, construction, and operation of a demonstration plant capable of processing bituminous caking coals into clean pipeline quality gas. The project is currently in the design phase (Phase I). This phase is scheduled to be completed in June 1981. One of the major efforts of Phase I is the process and project engineering design of the Demonstration Plant. The design has been completed and is being reported in 24 volumes. This is Volume 18 which reports the design of Plant Section 2700 - Waste Water Treatment. The objective of the Waste Water Treatment system is to collect and treat all plant liquid effluent streams. The system is designed to permit recycle and reuse of the treated waste water. Plant Section 2700 is composed of primary, secondary, and tertiary waste water treatment methods plus an evaporation system which eliminates liquid discharge from the plant. The Waste Water Treatment Section is designed to produce 130 pounds per hour of sludge that is buried in a landfill on the plant site. The evaporated water is condensed and provides a portion of the make-up water to Plant Section 2400 - Cooling Water.
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description
Contract No. EF-77-C-01-2542 between Conoco Inc. and the US Department of Energy provides for the design, construction, and operation of a demonstration plant capable of processing bituminous caking coals into clean pipeline quality gas. The project is currently in the design phase (Phase I). This phase is scheduled to be completed in June 1981. One of the major efforts of Phase I is the process and project engineering design of the Demonstration Plant. The design has been completed and is being reported in 24 volumes. This is Volume 18 which reports the design of Plant Section 2700 - Waste Water Treatment. The objective of the Waste Water Treatment system is to collect and treat all plant liquid effluent streams. The system is designed to permit recycle and reuse of the treated waste water. Plant Section 2700 is composed of primary, secondary, and tertiary waste water treatment methods plus an evaporation system which eliminates liquid discharge from the plant. The Waste Water Treatment Section is designed to produce 130 pounds per hour of sludge that is buried in a landfill on the plant site. The evaporated water is condensed and provides a portion of the make-up water to Plant Section 2400 - Cooling Water.
Fossil Energy Update
Energy Research Abstracts
Coal Demonstration Plants
Energy Research Abstracts
Author:
Publisher:
ISBN:
Category : Power resources
Languages : en
Pages : 738
Book Description
Includes all works deriving from DOE, other related government-sponsored information and foreign nonnuclear information.
Publisher:
ISBN:
Category : Power resources
Languages : en
Pages : 738
Book Description
Includes all works deriving from DOE, other related government-sponsored information and foreign nonnuclear information.
Monthly Catalogue, United States Public Documents
Author:
Publisher:
ISBN:
Category : Government publications
Languages : en
Pages : 1316
Book Description
Publisher:
ISBN:
Category : Government publications
Languages : en
Pages : 1316
Book Description
Monthly Catalog of United States Government Publications
Author:
Publisher:
ISBN:
Category : Government publications
Languages : en
Pages : 1096
Book Description
Publisher:
ISBN:
Category : Government publications
Languages : en
Pages : 1096
Book Description