Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 107
Book Description
The 241-SY-101 equipment removal system (ERS) consists of components, equipment, instrumentation and procedures that will provide the means to disconnect, retrieve, contain, load and transport the Mitigation Pump Assembly (MPA) from waste Tank 241-SY-101 to the Central Waste Complex (CWC). The Operability Test Procedure (OTP) will test the interfaces between ERS components and will rehearse the procedure for MPA removal and transportation to the extent they can be mocked-up at the CTF (Cold Test Facility). At the conclusion of the OTP, the ERS components and equipment will be removed from the CTF, entered into the Component Based Recall System (CBRS), and stored until needed for actual MPA removal and transportation.
Operability Test Procedure [Tank] 241-SY-101 Equipment Removal System
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 107
Book Description
The 241-SY-101 equipment removal system (ERS) consists of components, equipment, instrumentation and procedures that will provide the means to disconnect, retrieve, contain, load and transport the Mitigation Pump Assembly (MPA) from waste Tank 241-SY-101 to the Central Waste Complex (CWC). The Operability Test Procedure (OTP) will test the interfaces between ERS components and will rehearse the procedure for MPA removal and transportation to the extent they can be mocked-up at the CTF (Cold Test Facility). At the conclusion of the OTP, the ERS components and equipment will be removed from the CTF, entered into the Component Based Recall System (CBRS), and stored until needed for actual MPA removal and transportation.
Publisher:
ISBN:
Category :
Languages : en
Pages : 107
Book Description
The 241-SY-101 equipment removal system (ERS) consists of components, equipment, instrumentation and procedures that will provide the means to disconnect, retrieve, contain, load and transport the Mitigation Pump Assembly (MPA) from waste Tank 241-SY-101 to the Central Waste Complex (CWC). The Operability Test Procedure (OTP) will test the interfaces between ERS components and will rehearse the procedure for MPA removal and transportation to the extent they can be mocked-up at the CTF (Cold Test Facility). At the conclusion of the OTP, the ERS components and equipment will be removed from the CTF, entered into the Component Based Recall System (CBRS), and stored until needed for actual MPA removal and transportation.
Radioactive Waste Management
Energy Research Abstracts
INIS Atomindex
Acceptance Test Procedure, 241-SY-101
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 78
Book Description
This Acceptance Test Procedure is for the 241-SY-101/241-C-106 Shot Loading System. The procedure will test the components of the Shot Loading System and its capability of adequately loading shot into the annular space of the Container. The loaded shot will provide shielding as required for transporting and storage of a contaminated pump after removal from the tank. This test serves as verification that the SLS is acceptable for use in the pump removal operations for Tanks 241-SY-101, 241-C-106 and 241-AY-102. The pump removal operation for these three tanks will be performed by two different organizations with different equipment, but the Shot Loading System will be compatible between the two operations.
Publisher:
ISBN:
Category :
Languages : en
Pages : 78
Book Description
This Acceptance Test Procedure is for the 241-SY-101/241-C-106 Shot Loading System. The procedure will test the components of the Shot Loading System and its capability of adequately loading shot into the annular space of the Container. The loaded shot will provide shielding as required for transporting and storage of a contaminated pump after removal from the tank. This test serves as verification that the SLS is acceptable for use in the pump removal operations for Tanks 241-SY-101, 241-C-106 and 241-AY-102. The pump removal operation for these three tanks will be performed by two different organizations with different equipment, but the Shot Loading System will be compatible between the two operations.
The Office of Environmental Management Technical Reports
Author:
Publisher:
ISBN:
Category : Environmental management
Languages : en
Pages : 972
Book Description
Publisher:
ISBN:
Category : Environmental management
Languages : en
Pages : 972
Book Description
Tank 241-SY-101 Surface Level Rise Remediation Test and Evaluation Plan for Transfer System
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 41
Book Description
The purpose of this testing and evaluation plan (TEP) is to provide the high level guidance on testing requirements for ensuring that the equipment and systems to be implemented for remediation of the SY-101 waste level rise USQ are effective.
Publisher:
ISBN:
Category :
Languages : en
Pages : 41
Book Description
The purpose of this testing and evaluation plan (TEP) is to provide the high level guidance on testing requirements for ensuring that the equipment and systems to be implemented for remediation of the SY-101 waste level rise USQ are effective.
Structural Analysis of the Equipment Removal System for Tank 241SY101
Government Reports Announcements & Index
Removal of Technetium from Hanford Tank 241-AP-101
Author: Ingrid E. Burgeson
Publisher:
ISBN:
Category : Chemical engineering
Languages : en
Pages :
Book Description
Publisher:
ISBN:
Category : Chemical engineering
Languages : en
Pages :
Book Description