Oak Ridge Research Reactor Quarterly Report October, November and December of 1979
Oak Ridge Research Reactor Quarterly Report, October, November, and December of 1969
OAK RIDGE RESEARCH REACTOR QUARTERLY REPORT, OCTOBER, NOVEMBER, AND DECEMBER OF 1966
Oak Ridge Research Reactor Quarterly Report, October, November, and December of 1971
Oak Ridge Research Reactor Quarterly Report July, August, and September of 1979
Oak Ridge Research Reactor Quarterly Report, April, May, and June of 1979
Oak Ridge Research Reactor Quarterly Report October, November and December of 1978
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description
The ORR operated at an average power level of 29.0 MW for 80.9% of the time during October, November, and December of 1978. The reactor was shut down on fourteen occasions, four of which were unscheduled. Reactor downtime needed for refueling, maintenance and checks was normal, with the reactor remaining available for operation 92.2% of the time. Maintenance activities, both mechanical and instrument, were essentially routine in nature.
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description
The ORR operated at an average power level of 29.0 MW for 80.9% of the time during October, November, and December of 1978. The reactor was shut down on fourteen occasions, four of which were unscheduled. Reactor downtime needed for refueling, maintenance and checks was normal, with the reactor remaining available for operation 92.2% of the time. Maintenance activities, both mechanical and instrument, were essentially routine in nature.
Oak Ridge Research Reactor Quarterly Report, October--December 1970
Oak Ridge Research Reactor Quarterly Report, October, November, and December of 1977
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description
The ORR operated at an average power level of 29.8 MW for 29.6% of the time during October, November, and December of 1977. Ten new fuel elements were placed in service. Two shim-rod elements were retired from service at an average burnup of 71.2%. The reactor was shut down on seven occasions, none of which were unscheduled. Reactor downtime needed for refueling, maintenance and checks was quite low, with the reactor remaining available for operation 88.2% of the time. Maintenance activities, both mechanical and instrument were essentially routine in nature. In-service inspections completed during the quarter included inspection of the ORR decay tank and the ORR pool heat exchanger.
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description
The ORR operated at an average power level of 29.8 MW for 29.6% of the time during October, November, and December of 1977. Ten new fuel elements were placed in service. Two shim-rod elements were retired from service at an average burnup of 71.2%. The reactor was shut down on seven occasions, none of which were unscheduled. Reactor downtime needed for refueling, maintenance and checks was quite low, with the reactor remaining available for operation 88.2% of the time. Maintenance activities, both mechanical and instrument were essentially routine in nature. In-service inspections completed during the quarter included inspection of the ORR decay tank and the ORR pool heat exchanger.
Oak Ridge Research Reactor Quarterly Report, October, November, and December of 1975
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description
The ORR operated at an average power level of 29.9 Mw for 84.9 percent of the time during October, November, and December of 1975. Eleven fuel elements were declared spent (52.5 percent average burnup) during the quarter, while twenty-nine new elements were placed in service. Four shim-rod elements were retired from service at an average burnup of 63 percent. The reactor was shut down on eight occasions, all of which were scheduled. Two end-of-cycle shutdowns accounted for 80.7 percent of the total downtime. The remaining downtime was used principally for refueling and experiment work. Maintenance activities, both mechanical and instrument, were essentially routine in nature. Special tests or measurements during the quarter included: (1) Flux mapping for core No. 129A; (2) Determination of minimum fuel content in ORR fuel elements prior to declaring the element spent; (3) Reactor vessel, ultrasonic test, and (4) Visual inspection of ORR primary pump.
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description
The ORR operated at an average power level of 29.9 Mw for 84.9 percent of the time during October, November, and December of 1975. Eleven fuel elements were declared spent (52.5 percent average burnup) during the quarter, while twenty-nine new elements were placed in service. Four shim-rod elements were retired from service at an average burnup of 63 percent. The reactor was shut down on eight occasions, all of which were scheduled. Two end-of-cycle shutdowns accounted for 80.7 percent of the total downtime. The remaining downtime was used principally for refueling and experiment work. Maintenance activities, both mechanical and instrument, were essentially routine in nature. Special tests or measurements during the quarter included: (1) Flux mapping for core No. 129A; (2) Determination of minimum fuel content in ORR fuel elements prior to declaring the element spent; (3) Reactor vessel, ultrasonic test, and (4) Visual inspection of ORR primary pump.