Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description
OAK RIDGE RESEARCH REACTOR QUARTERLY REPORT, OCTOBER, NOVEMBER, AND DECEMBER OF 1966
Oak Ridge Research Reactor Quarterly Report, October, November, and December of 1969
OAK RIDGE RESEARCH REACTOR QUARTERLY REPORT, JULY, AUGUST, AND SEPTEMBER OF 1966
Oak Ridge Research Reactor Quarterly Report, October, November, and December of 1971
Oak Ridge Research Reactor Quarterly Report October, November and December of 1979
Publications, Reports, and Papers for 1966 from Oak Ridge National Laboratory
Author: F. M. O'Hara
Publisher:
ISBN:
Category : Technical reports
Languages : en
Pages : 374
Book Description
Publisher:
ISBN:
Category : Technical reports
Languages : en
Pages : 374
Book Description
Oak Ridge Research Reactor Quarterly Report, October--December 1970
Oak Ridge Research Reactor Quarterly Report October, November and December of 1978
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description
The ORR operated at an average power level of 29.0 MW for 80.9% of the time during October, November, and December of 1978. The reactor was shut down on fourteen occasions, four of which were unscheduled. Reactor downtime needed for refueling, maintenance and checks was normal, with the reactor remaining available for operation 92.2% of the time. Maintenance activities, both mechanical and instrument, were essentially routine in nature.
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description
The ORR operated at an average power level of 29.0 MW for 80.9% of the time during October, November, and December of 1978. The reactor was shut down on fourteen occasions, four of which were unscheduled. Reactor downtime needed for refueling, maintenance and checks was normal, with the reactor remaining available for operation 92.2% of the time. Maintenance activities, both mechanical and instrument, were essentially routine in nature.