Are you looking for read ebook online? Search for your book and save it on your Kindle device, PC, phones or tablets. Download Oak Ridge Research Reactor Quarterly Report, April, May, and June 1984 PDF full book. Access full book title Oak Ridge Research Reactor Quarterly Report, April, May, and June 1984 by . Download full books in PDF and EPUB format.

Oak Ridge Research Reactor Quarterly Report, April, May, and June 1984

Oak Ridge Research Reactor Quarterly Report, April, May, and June 1984 PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Book Description
The ORR operated at an average power level of 29.9 MW for 83.3% of the time during this period. The reactor was shut down on five occasions, one of which was unscheduled. Reactor downtime needed for refueling and checks was normal. The reactor remained available for operation 93.4% of the time. Maintenance activities, both mechanical and instrument, were essentially routine in nature. Special tests completed during the quarter included results of flux measurements in the HFED experiment, cycles 167-D and 168-A, and results of reactivity worth measurements of MFE-4A Hf core sleeve as installed in core position E-3. In-service inspection completed during the quarter included the internal and external inspection of the pool heat exchanger.

Oak Ridge Research Reactor Quarterly Report, April, May, and June 1984

Oak Ridge Research Reactor Quarterly Report, April, May, and June 1984 PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Book Description
The ORR operated at an average power level of 29.9 MW for 83.3% of the time during this period. The reactor was shut down on five occasions, one of which was unscheduled. Reactor downtime needed for refueling and checks was normal. The reactor remained available for operation 93.4% of the time. Maintenance activities, both mechanical and instrument, were essentially routine in nature. Special tests completed during the quarter included results of flux measurements in the HFED experiment, cycles 167-D and 168-A, and results of reactivity worth measurements of MFE-4A Hf core sleeve as installed in core position E-3. In-service inspection completed during the quarter included the internal and external inspection of the pool heat exchanger.

Oak Ridge Research Reactor Quarterly Report, April, May, and June of 1979

Oak Ridge Research Reactor Quarterly Report, April, May, and June of 1979 PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 25

Book Description


Oak Ridge Research Reactor Quarterly Report

Oak Ridge Research Reactor Quarterly Report PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Book Description


Oak Ridge Research Reactor Quarterly Report April, May, and June of 1977

Oak Ridge Research Reactor Quarterly Report April, May, and June of 1977 PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Book Description


Energy Research Abstracts

Energy Research Abstracts PDF Author:
Publisher:
ISBN:
Category : Power resources
Languages : en
Pages : 872

Book Description


Oak Ridge Research Reactor Quarterly Report, April, May, and June 1981

Oak Ridge Research Reactor Quarterly Report, April, May, and June 1981 PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Book Description
The ORR operated at an average power level of 29.8 MW for 90.7% of the time during April, May, and June 1981. The reactor was shut down on eight occasions, one of which was unscheduled. Reactor downtime needed for refueling, maintenance, and checks was normal, with the reactor remaining available for operation 91.6% of the time. Maintenance activities, both mechanical and instrument, were essentially routine in nature. In-service inspection completed during the quarter is described.

Energy Research Abstracts

Energy Research Abstracts PDF Author:
Publisher:
ISBN:
Category : Power resources
Languages : en
Pages : 546

Book Description


Oak Ridge Research Reactor Quarterly Report, October, November, and December of 1969

Oak Ridge Research Reactor Quarterly Report, October, November, and December of 1969 PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Book Description


OAK RIDGE RESEARCH REACTOR QUARTERLY REPORT, OCTOBER, NOVEMBER, AND DECEMBER OF 1966

OAK RIDGE RESEARCH REACTOR QUARTERLY REPORT, OCTOBER, NOVEMBER, AND DECEMBER OF 1966 PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Book Description


Oak Ridge Research Reactor. Quarterly Report, April-June 1979

Oak Ridge Research Reactor. Quarterly Report, April-June 1979 PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Book Description
The ORR operated at an average power level of 29.9 MW for 77.9% of the time during April, May, and June of 1979. The reactor was shut down on seven occasions, two of which were unscheduled. Reactor downtime needed for refueling, maintenance and checks was normal, with the reactor remaining available for operation 86.5% of the time. Maintenance activities, both mechanical and instrument, were essentially routine in nature.