National Dam Safety Program. Santa Fe Country Club Dam (MO 10765), Grand - Chariton Basin, Linn County, Missouri. Phase I Inspection Report PDF Download

Are you looking for read ebook online? Search for your book and save it on your Kindle device, PC, phones or tablets. Download National Dam Safety Program. Santa Fe Country Club Dam (MO 10765), Grand - Chariton Basin, Linn County, Missouri. Phase I Inspection Report PDF full book. Access full book title National Dam Safety Program. Santa Fe Country Club Dam (MO 10765), Grand - Chariton Basin, Linn County, Missouri. Phase I Inspection Report by Rey S. Decker. Download full books in PDF and EPUB format.

National Dam Safety Program. Santa Fe Country Club Dam (MO 10765), Grand - Chariton Basin, Linn County, Missouri. Phase I Inspection Report

National Dam Safety Program. Santa Fe Country Club Dam (MO 10765), Grand - Chariton Basin, Linn County, Missouri. Phase I Inspection Report PDF Author: Rey S. Decker
Publisher:
ISBN:
Category :
Languages : en
Pages : 74

Book Description
This report was prepared under the National Program of Inspection of Non-Federal Dams. This report assesses the general condition of the dam with respect to safety, based on available data and on visual inspection, to determine if the dam poses hazards to human life or property. (Author).

National Dam Safety Program. Santa Fe Country Club Dam (MO 10765), Grand - Chariton Basin, Linn County, Missouri. Phase I Inspection Report

National Dam Safety Program. Santa Fe Country Club Dam (MO 10765), Grand - Chariton Basin, Linn County, Missouri. Phase I Inspection Report PDF Author: Rey S. Decker
Publisher:
ISBN:
Category :
Languages : en
Pages : 74

Book Description
This report was prepared under the National Program of Inspection of Non-Federal Dams. This report assesses the general condition of the dam with respect to safety, based on available data and on visual inspection, to determine if the dam poses hazards to human life or property. (Author).

Technical Abstract Bulletin

Technical Abstract Bulletin PDF Author:
Publisher:
ISBN:
Category : Science
Languages : en
Pages : 196

Book Description


Government Reports Announcements & Index

Government Reports Announcements & Index PDF Author:
Publisher:
ISBN:
Category : Science
Languages : en
Pages : 1096

Book Description


Government Reports Annual Index

Government Reports Annual Index PDF Author:
Publisher:
ISBN:
Category : Research
Languages : en
Pages : 1008

Book Description
Sections 1-2. Keyword Index.--Section 3. Personal author index.--Section 4. Corporate author index.-- Section 5. Contract/grant number index, NTIS order/report number index 1-E.--Section 6. NTIS order/report number index F-Z.

National Dam Safety Program. Brookfield City Dam (MO 10181), Grand - Chariton River Basin, Linn County, Missouri. Phase I Inspection Report

National Dam Safety Program. Brookfield City Dam (MO 10181), Grand - Chariton River Basin, Linn County, Missouri. Phase I Inspection Report PDF Author: Walter G. Shifrin
Publisher:
ISBN:
Category :
Languages : en
Pages : 101

Book Description
This report was prepared under the National Program of Inspection of Non-Federal Dams. This report assesses the general condition of the dam with respect to safety, based on available data and on visual inspection, to determine if the dam poses hazards to human life or property. (Author).

Government Reports Annual Index: Keyword A-L

Government Reports Annual Index: Keyword A-L PDF Author:
Publisher:
ISBN:
Category : Government reports announcements & index
Languages : en
Pages : 1016

Book Description


National Dam Safety Program. Curt Lee Dam (MO 10664), Grand - Chariton Basin, Gentry County, Missouri. Phase I Inspection Report

National Dam Safety Program. Curt Lee Dam (MO 10664), Grand - Chariton Basin, Gentry County, Missouri. Phase I Inspection Report PDF Author: Rey S. Decker
Publisher:
ISBN:
Category :
Languages : en
Pages : 56

Book Description
Curt Lee Dam was inspected by an interdisciplinary team of engineers. The purpose of the inspection was to make an assessment of the general condition of the dam with respect to safety, based upon available data and visual inspection, in order to determine if the dam poses hazards to human life or property. Our inspection and evaluation indicates that the spillway does not meet the criteria set forth in the recommended guidelines for a small dam having a high hazard potential. Considering the volume of water impounded, the large floodplain downstream, the three houses, and State Highway 85 downstream of the dam, one-half of the Probable Maximum Flood is the appropriate spillway design flood. The spillway will pass the 100 year flood (flood having a one percent chance of being exceeded in any year) without overtopping the dam. The spillway will pass 17% of the Probable Maximum Flood without overtopping the dam. The Probable Maximum Flood (PMF) is defined as the flood that may be expected from the most severe combination of critical meteorologic and hydrologic conditions that are reasonably possible in the region.

National Dam Safety Program. Lake Paho Dam (MO 10108), Missouri - Grand - Chariton Basin, Mercer County, Missouri. Phase I Inspection Report

National Dam Safety Program. Lake Paho Dam (MO 10108), Missouri - Grand - Chariton Basin, Mercer County, Missouri. Phase I Inspection Report PDF Author: Harold P. Hoskins
Publisher:
ISBN:
Category :
Languages : en
Pages : 46

Book Description
The purpose of the inspection was to make an assessment of the general condition of the dam with respect to safety, based upon available data and visual inspection, in order to determine if the dam poses hazards to human life or property. The inspection and evaluation indicates that the spillway does not meet the criteria set forth in the guidelines for a dam having the above size and hazard potential. The spillway will pass 46% of the Probable Maximum Flood without overtopping the dam. The Probable Maximum Flood (PMF) is defined as the flood that may be expected from the most severe combination of critical meteorologic and hydrologic conditions that are reasonably possible in the region. An additional deficiency, in accordance with the guidelines, is the lack of seepage analysis. These analyses should be obtained in the future. Other deficiencies visually observed by the inspection team were spalling of spillway concrete, open joints in the spillway, some deterioration of riprap, bank erosion at the end of the spillway stilling basin and erosion in a few small areas on the upstream slope.

National Dam Safety Program. City of Cameron Reservoir Number 1 Dam (MO 10042), Grand - Chariton Basin, Dekalb County, Missouri. Phase I Inspection Report

National Dam Safety Program. City of Cameron Reservoir Number 1 Dam (MO 10042), Grand - Chariton Basin, Dekalb County, Missouri. Phase I Inspection Report PDF Author: Paul R. Zaman
Publisher:
ISBN:
Category :
Languages : en
Pages : 47

Book Description
This report was prepared under the National Program of Inspection of Non-Federal Dams. This report assesses the general condition of the dam with respect to safety, based on available data and on visual inspection, to determine if the dam poses hazards to human life or property. (Author).

National Dam Safety Program. Lake Marie Dam (MO 10154), Missouri - Grand Chariton Basin, Mercer County, Missouri. Phase I Inspection Report

National Dam Safety Program. Lake Marie Dam (MO 10154), Missouri - Grand Chariton Basin, Mercer County, Missouri. Phase I Inspection Report PDF Author: Harold P. Hoskins
Publisher:
ISBN:
Category :
Languages : en
Pages : 36

Book Description
The purpose of the inspection was to make an assessment of the general condition of the dam with respect to safety, based upon available data and visual inspection, in order to determine if the dam poses hazards to human life or property. The inspection and evaluation indicates that the spillway does not meet the criteria set forth in the guidelines for a dam having the above size and hazard potential. The spillway will pass the 100-year frequency flood as well as 40% of the Probable Maximum Flood without overtopping the dam. The Probable Maximum Flood (PMF) is defined as the flood that may be expected from the most severe combination of critical meteorologic and hydrologic conditions that are reasonably possible in the region. Additional deficiencies, in accordance with the guidelines, are the lack of seepage and stability analysis. These analyses should be obtained in the future.