National Dam Safety Program. Elon Water Works Dam (Inventory Number VA 00908), James River Basin. Amherst County, Virginia. Phase I Inspection Report PDF Download

Are you looking for read ebook online? Search for your book and save it on your Kindle device, PC, phones or tablets. Download National Dam Safety Program. Elon Water Works Dam (Inventory Number VA 00908), James River Basin. Amherst County, Virginia. Phase I Inspection Report PDF full book. Access full book title National Dam Safety Program. Elon Water Works Dam (Inventory Number VA 00908), James River Basin. Amherst County, Virginia. Phase I Inspection Report by Boris O. Taran. Download full books in PDF and EPUB format.

National Dam Safety Program. Elon Water Works Dam (Inventory Number VA 00908), James River Basin. Amherst County, Virginia. Phase I Inspection Report

National Dam Safety Program. Elon Water Works Dam (Inventory Number VA 00908), James River Basin. Amherst County, Virginia. Phase I Inspection Report PDF Author: Boris O. Taran
Publisher:
ISBN:
Category :
Languages : en
Pages : 49

Book Description
The Elon Water Works Dam is a zoned earth fill dam approximately 52.1 feet high and 490 feet long. The dam is classified as an intermediate size dam with a significant hazard classification. The emergency spillway is an earthen channel with a trapezoidal cross section at the left abutment. The principal spillway is a concrete drop-inlet with a fixed crest elevation of 663 feet. The reservoir is used for water supply. Based on criteria established by the Department of the Army, Office of the Chief of Engineers (OCE), the Spillway Design Flood (SDF) is the 1/2 PMF. The emergency spillway will pass 32 percent of the PMF or 64 percent of the SDF without overtopping the dam. The SDF will overtop the dam by a maximum of 1.2 feet, reach an average critical velocity of 5.1 feet per second and flow over the dam for 2.4 hours. The emergency spillway is adjudged inadequate, but not seriously inadequate.

National Dam Safety Program. Elon Water Works Dam (Inventory Number VA 00908), James River Basin. Amherst County, Virginia. Phase I Inspection Report

National Dam Safety Program. Elon Water Works Dam (Inventory Number VA 00908), James River Basin. Amherst County, Virginia. Phase I Inspection Report PDF Author: Boris O. Taran
Publisher:
ISBN:
Category :
Languages : en
Pages : 49

Book Description
The Elon Water Works Dam is a zoned earth fill dam approximately 52.1 feet high and 490 feet long. The dam is classified as an intermediate size dam with a significant hazard classification. The emergency spillway is an earthen channel with a trapezoidal cross section at the left abutment. The principal spillway is a concrete drop-inlet with a fixed crest elevation of 663 feet. The reservoir is used for water supply. Based on criteria established by the Department of the Army, Office of the Chief of Engineers (OCE), the Spillway Design Flood (SDF) is the 1/2 PMF. The emergency spillway will pass 32 percent of the PMF or 64 percent of the SDF without overtopping the dam. The SDF will overtop the dam by a maximum of 1.2 feet, reach an average critical velocity of 5.1 feet per second and flow over the dam for 2.4 hours. The emergency spillway is adjudged inadequate, but not seriously inadequate.

Technical Abstract Bulletin

Technical Abstract Bulletin PDF Author:
Publisher:
ISBN:
Category : Science
Languages : en
Pages : 180

Book Description


National Dam Safety Program. Mays Dam (Inventory Number VA 00909), James River Basin, Amherst County, State of Virginia. Phase I Inspection Report

National Dam Safety Program. Mays Dam (Inventory Number VA 00909), James River Basin, Amherst County, State of Virginia. Phase I Inspection Report PDF Author: James A. Walsh
Publisher:
ISBN:
Category :
Languages : en
Pages : 51

Book Description
Pursuant to Public Law 92-367, Phase I Inspection Reports are prepared under guidance contained in the recommended guidelines for safety inspection of dams, published by the Office of Chief of Engineers, Washington, D.C. 20314. The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic, hydrologic, geologic, geotechnic, and structural aspects of the dam. The engineering techniques employed give a reasonably accurate assessment of the conditions of the dam. It should be realized that certain engineering aspects cannot be fully analyzed during a Phase I inspection. Assessment and remedial measures in the report include the requirements of additional indepth study when necessary.

Government Reports Annual Index

Government Reports Annual Index PDF Author:
Publisher:
ISBN:
Category : Government reports announcements & index
Languages : en
Pages : 1212

Book Description


National Dam Safety Program. Pedlar River Dam (Inventory Number VA 00905), James River Basin, Amherst County, Virginia. Phase I Inspection Report

National Dam Safety Program. Pedlar River Dam (Inventory Number VA 00905), James River Basin, Amherst County, Virginia. Phase I Inspection Report PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 66

Book Description
The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic, hydrologic, geologic, geotechnic, and structural aspects of the dam. The engineering techniques employed give a reasonably accurate assessment of the conditions of the dam. It should be realized that certain engineering aspects cannot be fully analyzed during a Phase I inspection. Assessment and remedial measures in the report include the requirements of additional indepth study when necessary. Phase I reports include project information of the dam and appurtenances, all existing engineering data, operational procedures, hydraulic/hydrologic data of the watershed, dam stability, visual inspection report and an assessment including required remedial measures.

Government Reports Announcements & Index

Government Reports Announcements & Index PDF Author:
Publisher:
ISBN:
Category : Science
Languages : en
Pages : 1620

Book Description


National Dam Safety Program. Buffalo River Dam Number 2 (Inventory Number VA 00912), James River Basin, Amherst County, State of Virginia. Phase I Inspection Report

National Dam Safety Program. Buffalo River Dam Number 2 (Inventory Number VA 00912), James River Basin, Amherst County, State of Virginia. Phase I Inspection Report PDF Author: James A. Walsh
Publisher:
ISBN:
Category :
Languages : en
Pages : 102

Book Description
The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general condition of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations testing, and detailed computational evaluations are beyond the scope of a Phase I investigation. In reviewing this report, it should be realized that the reported condition of the dam is based on observations of field conditions at the time of inspection along with data available to the inspection team. In cases where the reservoir was lowered or drained prior to inspection, such action, while improving the stability and safety of the dam, removes the normal load on the structure and may obscure certain conditions which might otherwise be detectable if inspected under the normal operating environment of the structure. It is important to note that the condition of a dam depends on numerous and constantly changing internal and external conditions, and is evolutionary in nature.

National Dam Safety Program. Buffalo River Number 3 (Inventory Number VA 00911), James River Basin, Amherst County, State of Virginia. Phase I Inspection Report

National Dam Safety Program. Buffalo River Number 3 (Inventory Number VA 00911), James River Basin, Amherst County, State of Virginia. Phase I Inspection Report PDF Author: James A. Walsh
Publisher:
ISBN:
Category :
Languages : en
Pages : 84

Book Description
Buffalo River No. 3 is a zoned, earthfill dam approximately 500 feet long and 60 feet high. The dam, located on Stonehouse Creek approximately 7 miles northwest of Amherst, Virgina, is used for flood control. Visual inspection and office analysis indicate no deficiencies requiring emergency attention. Using the Corps of Engineers' screening criteria for initial review of spillway adequacy, the Probable Maximum Flood (PMF) was selected as the spillway design flood (SDF). The Soil Conservation Service (SCS) freeboard hydrograph (which establishes top of dam) is essentially equal to the PMF hydrograph. The spillways will essentially pass the PMF without overtopping the dam, and are therefore considered adequate. The dam and appurtenant structures were found to be in generally good condition. No conditions indicating embankment instability were detected during the field inspection and office analyses.

Government Reports Annual Index: Keyword A-L

Government Reports Annual Index: Keyword A-L PDF Author:
Publisher:
ISBN:
Category : Government reports announcements & index
Languages : en
Pages : 1016

Book Description


National Dam Safety Program. Coleman Falls Dam (VA-00903), Upper James River Basin, Amherst County, Virginia, Phase I Inspection Report

National Dam Safety Program. Coleman Falls Dam (VA-00903), Upper James River Basin, Amherst County, Virginia, Phase I Inspection Report PDF Author: Paul Seiler
Publisher:
ISBN:
Category :
Languages : en
Pages : 43

Book Description
Pursuant to Public Law 92-367, Phase I Inspection Reports are prepared under guidance contained in the recommended guidelines for safety inspection of dams, published by the Office of Chief of Engineers, Washington, D.C. 20314. The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic, hydrologic, geologic, geotechnic, and structural aspects of the dam. The engineering techniques employed give a reasonably accurate assessment of the conditions of the dam. It should be realized that certain engineering aspects cannot be fully analyzed during a Phase I inspection. Assessment and remedial measures in the report include the requirements of additional indepth study when necessary.