Curt Lee Dam was inspected by an interdisciplinary team of engineers. The purpose of the inspection was to make an assessment of the general condition of the dam with respect to safety, based upon available data and visual inspection, in order to determine if the dam poses hazards to human life or property. Our inspection and evaluation indicates that the spillway does not meet the criteria set forth in the recommended guidelines for a small dam having a high hazard potential. Considering the volume of water impounded, the large floodplain downstream, the three houses, and State Highway 85 downstream of the dam, one-half of the Probable Maximum Flood is the appropriate spillway design flood. The spillway will pass the 100 year flood (flood having a one percent chance of being exceeded in any year) without overtopping the dam. The spillway will pass 17% of the Probable Maximum Flood without overtopping the dam. The Probable Maximum Flood (PMF) is defined as the flood that may be expected from the most severe combination of critical meteorologic and hydrologic conditions that are reasonably possible in the region.
National Dam Safety Program. Curt Lee Dam (MO 10664), Grand - Chariton Basin, Gentry County, Missouri. Phase I Inspection Report
Author: Rey S. Decker
Publisher:
ISBN:
Category :
Languages : en
Pages : 56
Book Description
Curt Lee Dam was inspected by an interdisciplinary team of engineers. The purpose of the inspection was to make an assessment of the general condition of the dam with respect to safety, based upon available data and visual inspection, in order to determine if the dam poses hazards to human life or property. Our inspection and evaluation indicates that the spillway does not meet the criteria set forth in the recommended guidelines for a small dam having a high hazard potential. Considering the volume of water impounded, the large floodplain downstream, the three houses, and State Highway 85 downstream of the dam, one-half of the Probable Maximum Flood is the appropriate spillway design flood. The spillway will pass the 100 year flood (flood having a one percent chance of being exceeded in any year) without overtopping the dam. The spillway will pass 17% of the Probable Maximum Flood without overtopping the dam. The Probable Maximum Flood (PMF) is defined as the flood that may be expected from the most severe combination of critical meteorologic and hydrologic conditions that are reasonably possible in the region.
Publisher:
ISBN:
Category :
Languages : en
Pages : 56
Book Description
Curt Lee Dam was inspected by an interdisciplinary team of engineers. The purpose of the inspection was to make an assessment of the general condition of the dam with respect to safety, based upon available data and visual inspection, in order to determine if the dam poses hazards to human life or property. Our inspection and evaluation indicates that the spillway does not meet the criteria set forth in the recommended guidelines for a small dam having a high hazard potential. Considering the volume of water impounded, the large floodplain downstream, the three houses, and State Highway 85 downstream of the dam, one-half of the Probable Maximum Flood is the appropriate spillway design flood. The spillway will pass the 100 year flood (flood having a one percent chance of being exceeded in any year) without overtopping the dam. The spillway will pass 17% of the Probable Maximum Flood without overtopping the dam. The Probable Maximum Flood (PMF) is defined as the flood that may be expected from the most severe combination of critical meteorologic and hydrologic conditions that are reasonably possible in the region.
Technical Abstract Bulletin
Government reports annual index
Missouri, Missouri-Grand-Chariton Basin, Lake Paho Dam, Mercer County, Missouri Phase 1 Inspection Report, National Dam Safety Program
Author: United States. Army. Corps of Engineers. St. Louis District
Publisher:
ISBN:
Category : Dams
Languages : en
Pages : 76
Book Description
Publisher:
ISBN:
Category : Dams
Languages : en
Pages : 76
Book Description
Government Reports Announcements & Index
National Dam Safety Program. Lake Paho Dam (MO 10108), Missouri - Grand - Chariton Basin, Mercer County, Missouri. Phase I Inspection Report
Author: Harold P. Hoskins
Publisher:
ISBN:
Category :
Languages : en
Pages : 46
Book Description
The purpose of the inspection was to make an assessment of the general condition of the dam with respect to safety, based upon available data and visual inspection, in order to determine if the dam poses hazards to human life or property. The inspection and evaluation indicates that the spillway does not meet the criteria set forth in the guidelines for a dam having the above size and hazard potential. The spillway will pass 46% of the Probable Maximum Flood without overtopping the dam. The Probable Maximum Flood (PMF) is defined as the flood that may be expected from the most severe combination of critical meteorologic and hydrologic conditions that are reasonably possible in the region. An additional deficiency, in accordance with the guidelines, is the lack of seepage analysis. These analyses should be obtained in the future. Other deficiencies visually observed by the inspection team were spalling of spillway concrete, open joints in the spillway, some deterioration of riprap, bank erosion at the end of the spillway stilling basin and erosion in a few small areas on the upstream slope.
Publisher:
ISBN:
Category :
Languages : en
Pages : 46
Book Description
The purpose of the inspection was to make an assessment of the general condition of the dam with respect to safety, based upon available data and visual inspection, in order to determine if the dam poses hazards to human life or property. The inspection and evaluation indicates that the spillway does not meet the criteria set forth in the guidelines for a dam having the above size and hazard potential. The spillway will pass 46% of the Probable Maximum Flood without overtopping the dam. The Probable Maximum Flood (PMF) is defined as the flood that may be expected from the most severe combination of critical meteorologic and hydrologic conditions that are reasonably possible in the region. An additional deficiency, in accordance with the guidelines, is the lack of seepage analysis. These analyses should be obtained in the future. Other deficiencies visually observed by the inspection team were spalling of spillway concrete, open joints in the spillway, some deterioration of riprap, bank erosion at the end of the spillway stilling basin and erosion in a few small areas on the upstream slope.
National Dam Safety Program. Santa Fe Country Club Dam (MO 10765), Grand - Chariton Basin, Linn County, Missouri. Phase I Inspection Report
Author: Rey S. Decker
Publisher:
ISBN:
Category :
Languages : en
Pages : 74
Book Description
This report was prepared under the National Program of Inspection of Non-Federal Dams. This report assesses the general condition of the dam with respect to safety, based on available data and on visual inspection, to determine if the dam poses hazards to human life or property. (Author).
Publisher:
ISBN:
Category :
Languages : en
Pages : 74
Book Description
This report was prepared under the National Program of Inspection of Non-Federal Dams. This report assesses the general condition of the dam with respect to safety, based on available data and on visual inspection, to determine if the dam poses hazards to human life or property. (Author).
Missouri, Missouri-Grand-Chariton Basin, Lake Marie Dam, Mercer County, Missouri Phase 1 Inspection Report, National Dam Safety Program
Author: United States. Army. Corps of Engineers. St. Louis District
Publisher:
ISBN:
Category : Dams
Languages : en
Pages : 78
Book Description
Publisher:
ISBN:
Category : Dams
Languages : en
Pages : 78
Book Description
Missouri, Missouri-Grand-Chariton Basin, Berndt Lake Dam, Mercer County, Missouri Phase 1 Inspection Report, National Dam Safety Program
Author: United States. Army. Corps of Engineers. St. Louis District
Publisher:
ISBN:
Category : Dams
Languages : en
Pages : 72
Book Description
Publisher:
ISBN:
Category : Dams
Languages : en
Pages : 72
Book Description
Missouri, Missouri-Grand-Chariton Basin, Bethany City Reservoir, Harrison County, Missouri Phase 1 Inspection Report, National Dam Safety Program
Author: United States. Army. Corps of Engineers. St. Louis District
Publisher:
ISBN:
Category : Dams
Languages : en
Pages : 84
Book Description