Author: Edwin R. Burton
Publisher:
ISBN:
Category :
Languages : en
Pages : 66
Book Description
Barber Dam was inspected by a team of engineers. The purpose of the inspection was to make an assessment of the general condition of the dam with respect to safety, based upon available data and visual inspection, in order to determine if the dam poses hazards to human life or property. Our inspection and evaluation indicates the drop inlet spillway and two overflow sections do not meet the criteria set forth in the guidelines for a dam having the above size and hazard potential. The spillway and overflow sections will not pass the probable maximum flood without overtopping but the dam will pass 65 percent of the probable maximum flood. The spillway and overflow sections will pass the flood which has a one percent chance of occurrence in any given year (100-year flood). The spillway design flood recommended by the guidelines is 100 percent of the probable maximum flood. The probable maximum flood is defined as the flood discharge which may be expected from the most severe combination of critical meteorologic and hydrologic conditions which are reasonably possible in the region.
National Dam Safety Program. Barber Dam (MO 20570), Missouri - Kansas City Basin, Jackson County, Missouri. Phase I Inspection Report
Author: Edwin R. Burton
Publisher:
ISBN:
Category :
Languages : en
Pages : 66
Book Description
Barber Dam was inspected by a team of engineers. The purpose of the inspection was to make an assessment of the general condition of the dam with respect to safety, based upon available data and visual inspection, in order to determine if the dam poses hazards to human life or property. Our inspection and evaluation indicates the drop inlet spillway and two overflow sections do not meet the criteria set forth in the guidelines for a dam having the above size and hazard potential. The spillway and overflow sections will not pass the probable maximum flood without overtopping but the dam will pass 65 percent of the probable maximum flood. The spillway and overflow sections will pass the flood which has a one percent chance of occurrence in any given year (100-year flood). The spillway design flood recommended by the guidelines is 100 percent of the probable maximum flood. The probable maximum flood is defined as the flood discharge which may be expected from the most severe combination of critical meteorologic and hydrologic conditions which are reasonably possible in the region.
Publisher:
ISBN:
Category :
Languages : en
Pages : 66
Book Description
Barber Dam was inspected by a team of engineers. The purpose of the inspection was to make an assessment of the general condition of the dam with respect to safety, based upon available data and visual inspection, in order to determine if the dam poses hazards to human life or property. Our inspection and evaluation indicates the drop inlet spillway and two overflow sections do not meet the criteria set forth in the guidelines for a dam having the above size and hazard potential. The spillway and overflow sections will not pass the probable maximum flood without overtopping but the dam will pass 65 percent of the probable maximum flood. The spillway and overflow sections will pass the flood which has a one percent chance of occurrence in any given year (100-year flood). The spillway design flood recommended by the guidelines is 100 percent of the probable maximum flood. The probable maximum flood is defined as the flood discharge which may be expected from the most severe combination of critical meteorologic and hydrologic conditions which are reasonably possible in the region.
Technical Abstract Bulletin
Missouri, Missouri-Kansas City Basin, Riss Lake Dam, Jackson County, Missouri Phase 1 Inspection Report, National Dam Safety Program
Author: United States. Army. Corps of Engineers. St. Louis District
Publisher:
ISBN:
Category : Dams
Languages : en
Pages : 96
Book Description
Publisher:
ISBN:
Category : Dams
Languages : en
Pages : 96
Book Description
Missouri-Kansas City Basin, Jim Bair Dam, St. Charles County, Missouri Phase 1 Inspection Report, National Dam Safety Program
Author: United States. Army. Corps of Engineers. St. Louis District
Publisher:
ISBN:
Category : Dams
Languages : en
Pages : 80
Book Description
Publisher:
ISBN:
Category : Dams
Languages : en
Pages : 80
Book Description
Missouri-Kansas City Basin, Fayette New City Lake Dam, Howard County, Missouri, Phase 1 Inspection Report, National Dam Safety Program
Author: United States. Army. Corps of Engineers. St. Louis District
Publisher:
ISBN:
Category : Dams
Languages : en
Pages : 106
Book Description
Publisher:
ISBN:
Category : Dams
Languages : en
Pages : 106
Book Description
Missouri, Missouri-Kansas City Basin, Structure No. 1 - Williams Creek, Clay County, Missouri Phase 1 Inspection Report, National Dam Safety Program
Author: United States. Army. Corps of Engineers. St. Louis District
Publisher:
ISBN:
Category : Dams
Languages : en
Pages : 90
Book Description
Publisher:
ISBN:
Category : Dams
Languages : en
Pages : 90
Book Description
National Dam Safety Program. Lakewood (East) Dam (MO 20373), Missouri - Kansas City Basin, Jackson County, Missouri. Phase I Inspection Report
Author: Paul R. Zaman
Publisher:
ISBN:
Category :
Languages : en
Pages : 50
Book Description
This report was prepared under the National Program of Inspection of Non-Federal Dams. This report assesses the general condition of the dam with respect to safety, based on available data and on visual inspection, to determine if the dam poses hazards to human life or property. (Author).
Publisher:
ISBN:
Category :
Languages : en
Pages : 50
Book Description
This report was prepared under the National Program of Inspection of Non-Federal Dams. This report assesses the general condition of the dam with respect to safety, based on available data and on visual inspection, to determine if the dam poses hazards to human life or property. (Author).
Government Reports Announcements & Index
National Dam Safety Program. Lake Jacomo Dam (MO 10045), Missouri - Kansas City Basin, Jackson County, Missouri. Phase I Inspection Report
Author: Paul R. Zaman
Publisher:
ISBN:
Category :
Languages : en
Pages : 95
Book Description
This report was prepared under the National Program of Inspection of Non-Federal Dams. This report assesses the general condition of the dam with respect to safety, based on available data and on visual inspection, to determine if the dam poses hazards to human life or property. (Author).
Publisher:
ISBN:
Category :
Languages : en
Pages : 95
Book Description
This report was prepared under the National Program of Inspection of Non-Federal Dams. This report assesses the general condition of the dam with respect to safety, based on available data and on visual inspection, to determine if the dam poses hazards to human life or property. (Author).
Government Reports Annual Index
Author:
Publisher:
ISBN:
Category : Government reports announcements & index
Languages : en
Pages : 1012
Book Description
Publisher:
ISBN:
Category : Government reports announcements & index
Languages : en
Pages : 1012
Book Description