Los Alamos National Laboratory TRU Waste Sampling Projects PDF Download

Are you looking for read ebook online? Search for your book and save it on your Kindle device, PC, phones or tablets. Download Los Alamos National Laboratory TRU Waste Sampling Projects PDF full book. Access full book title Los Alamos National Laboratory TRU Waste Sampling Projects by . Download full books in PDF and EPUB format.

Los Alamos National Laboratory TRU Waste Sampling Projects

Los Alamos National Laboratory TRU Waste Sampling Projects PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 10

Book Description
The Los Alamos National Laboratory (LANL) has begun characterizing transuranic (TRU) waste in order to comply with New Mexico regulations, and to prepare the waste for shipment and disposal at the Waste Isolation Pilot Plant (WIPP), near Carlsbad, New Mexico. Sampling consists of removing some head space gas from each drum, removing a core from a few drums of each homogeneous waste stream, and visually characterizing a few drums from each heterogeneous waste stream. The gases are analyzed by GC/MS, and the cores are analyzed for VOC's and SVOC's by GC/MS and for metals by AA or AE spectroscopy. The sampling and examination projects are conducted in accordance with the ''DOE TRU Waste Quality Assurance Program Plan'' (QAPP) and the ''LANL TRU Waste Quality Assurance Project Plan, '' (QAPjP), guaranteeing that the data meet the needs of both the Carlsbad Area Office (CAO) of DOE and the ''WIPP Waste Acceptance Criteria, Rev. 5,'' (WAC).

Los Alamos National Laboratory TRU Waste Sampling Projects

Los Alamos National Laboratory TRU Waste Sampling Projects PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 10

Book Description
The Los Alamos National Laboratory (LANL) has begun characterizing transuranic (TRU) waste in order to comply with New Mexico regulations, and to prepare the waste for shipment and disposal at the Waste Isolation Pilot Plant (WIPP), near Carlsbad, New Mexico. Sampling consists of removing some head space gas from each drum, removing a core from a few drums of each homogeneous waste stream, and visually characterizing a few drums from each heterogeneous waste stream. The gases are analyzed by GC/MS, and the cores are analyzed for VOC's and SVOC's by GC/MS and for metals by AA or AE spectroscopy. The sampling and examination projects are conducted in accordance with the ''DOE TRU Waste Quality Assurance Program Plan'' (QAPP) and the ''LANL TRU Waste Quality Assurance Project Plan, '' (QAPjP), guaranteeing that the data meet the needs of both the Carlsbad Area Office (CAO) of DOE and the ''WIPP Waste Acceptance Criteria, Rev. 5,'' (WAC).

Los Alamos National Laboratory Transuranic Waste Quality Assurance Project Plan. Revision 1

Los Alamos National Laboratory Transuranic Waste Quality Assurance Project Plan. Revision 1 PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 150

Book Description
This Transuranic (TRU) Waste Quality Assurance Project Plan (QAPjP) serves as the quality management plan for the characterization of transuranic waste in preparation for certification and transportation. The Transuranic Waste Characterization/Certification Program (TWCP) consists of personnel who sample and analyze waste, validate and report data; and provide project management, quality assurance, audit and assessment, and records management support, all in accordance with established requirements for disposal of TRU waste at the Waste Isolation Pilot Plant (WIPP) facility. This QAPjP addresses how the TWCP meets the quality requirements of the Carlsbad Area Office (CAO) Quality Assurance Program Description (QAPD) and the technical requirements of the Transuranic Waste Characterization Quality Assurance Program Plan (QAPP). The TWCP characterizes and certifies retrievably stored and newly generated TRU waste using the waste selection, testing, sampling, and analytical techniques and data quality objectives (DQOs) described in the QAPP, the Los Alamos National Laboratory Transuranic Waste Certification Plan (Certification Plan), and the CST Waste Management Facilities Waste Acceptance Criteria and Certification [Los Alamos National Laboratory (LANL) Waste Acceptance Criteria (WAC)]. At the present, the TWCP does not address remote-handled (RH) waste.

The Los Alamos National Laboratory Transuranic Waste Retireval Project

The Los Alamos National Laboratory Transuranic Waste Retireval Project PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 10

Book Description
This paper presents the status of the Los Alamos National Laboratory (LANL) project for remediation of transuranic (TRU) and TRU mixed waste from Pads 1, 2, and 4. Some of the TRU waste packages retrieved from Pad I are anticipated to be part of LANL's initial inventory to be shipped to the Waste Isolation Pilot Plant (WIPP) in April 1998. The TRU Waste Inspectable Storage Project (TWISP) was initiated in February 1993 in response to the New Mexico Environment Department's (NMED's) Consent Agreement for Compliance Order, ''New Mexico Hazardous Waste Agreement (NMHWA) 93-03.'' The TWISP involves the recovery of approximately 16,865 TRU and TRU-mixed waste containers currently under earthen cover on Pads 1, 2, and 4 at Technical Area 54, Area G, and placement of that waste into inspectable storage. All waste will be moved into inspectable storage by September 30, 2003. Waste recovery and storage operations emphasize protection of worker safety, public health, and the environment.

TRU Waste-sampling Program

TRU Waste-sampling Program PDF Author: John L. Warren
Publisher:
ISBN:
Category : Radioactive wastes
Languages : en
Pages : 92

Book Description


Los Alamos National Laboratory Transuranic Waste Characterization and Certification Program - an Overview of Capabilities and Capacity

Los Alamos National Laboratory Transuranic Waste Characterization and Certification Program - an Overview of Capabilities and Capacity PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 12

Book Description
The Los Alamos National Laboratory (LANL) has full capability to characterize transuranic (TRU) waste for shipment to and disposal at the Waste Isolation Pilot Plant (WIPP) for its projected opening. LANL TRU waste management operations also include facilities to repackage both drums of waste found not to be certifiable for WIPP and oversized boxes of waste that must be size reduced for shipment to WIPP. All characterization activities and repackaging are carried out under a quality assurance program designed to meet Carlsbad Area Office (CAO) requirements. The flow of waste containers through characterization operations, the facilities used for characterization, and the electronic data management system used for data package preparation and certification of TRU waste at LANL are described.

Los Alamos National Laboratory Continued Operation Site-Wide

Los Alamos National Laboratory Continued Operation Site-Wide PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 918

Book Description


TRU Waste Facility Project - Site Visit (Mr. Klotz from DOE Administrator, NNSA) Photos

TRU Waste Facility Project - Site Visit (Mr. Klotz from DOE Administrator, NNSA) Photos PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Book Description


Los Alamos National Laboratory Transuranic Waste Program

Los Alamos National Laboratory Transuranic Waste Program PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Book Description


Los Alamos National Laboratory Accelerated Tru Waste Workoff Strategies

Los Alamos National Laboratory Accelerated Tru Waste Workoff Strategies PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 8

Book Description
During 1996, the Los Alamos National Laboratory (LANL) developed two transuranic (TRU) waste workoff strategies that were estimated to save $270 - 340M through accelerated waste workoff and the elimination of a facility. The planning effort included a strategy to assure that LANL would have a significant quantity (3000+ drums) of TRU waste certified for shipment to the Waste Isolation Pilot Plant (WIPP) beginning in April of 1998, when WIPP was projected to open. One of the accelerated strategies can be completed in less than ten years through a Total Optimization of Parameters Scenario ({open_quotes}TOPS{close_quotes}). {open_quotes}TOPS{close_quotes} fully utilizes existing LANL facilities and capabilities. For this scenario, funding was estimated to be unconstrained at $23M annually to certify and ship the legacy inventory of TRU waste at LANL. With {open_quotes}TOPS{close_quotes} the inventory is worked off in about 8.5 years while shipping 5,000 drums per year at a total cost of $196M. This workoff includes retrieval from earthen cover and interim storage costs. The other scenario envisioned funding at the current level with some increase for TRUPACT II loading costs, which total $16M annually. At this funding level, LANL estimates it will require about 17 years to work off the LANL TRU legacy waste while shipping 2,500 drums per year to WIPP. The total cost will be $277M. This latter scenario decreases the time for workoff by about 19 years from previous estimates and saves an estimated $190M. In addition, the planning showed that a $70M facility for TRU waste characterization was not needed. After the first draft of the LANL strategies was written, Congress amended the WIPP Land Withdrawal Act (LWA) to accelerate the opening of WIPP to November 1997. Further, the No Migration Variance requirement for the WIPP was removed. This paper discusses the LANL strategies as they were originally developed. 1 ref., 3 figs., 2 tabs.

Statistical Sampling Plan for the TRU Waste Assay Facility

Statistical Sampling Plan for the TRU Waste Assay Facility PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Book Description
Due to limited space, there is a need to dispose appropriately of the Oak Ridge National Laboratory transuranic waste which is presently stored below ground in 55-gal (208-l) drums within weather-resistant structures. Waste containing less than 100 nCi/g transuranics can be removed from the present storage and be buried, while waste containing greater than 100 nCi/g transuranics must continue to be retrievably stored. To make the necessary measurements needed to determine the drums that can be buried, a transuranic Neutron Interrogation Assay System (NIAS) has been developed at Los Alamos National Laboratory and can make the needed measurements much faster than previous techniques which involved .gamma.-ray spectroscopy. The previous techniques are reliable but time consuming. Therefore, a validation study has been planned to determine the ability of the NIAS to make adequate measurements. The validation of the NIAS will be based on a paired comparison of a sample of measurements made by the previous techniques and the NIAS. The purpose of this report is to describe the proposed sampling plan and the statistical analyses needed to validate the NIAS. 5 references, 4 figures, 5 tables.