Author: Great Britain: National Audit Office
Publisher: The Stationery Office
ISBN: 9780102980523
Category : Business & Economics
Languages : en
Pages : 52
Book Description
The Department for Transport competition to let the Intercity West Coast franchise lacked management oversight and the governance of the project was confused, according to the National Audit Office. The full cost to the taxpayer is unknown but likely to be significant, with at least £1.9 million in staff and adviser costs, £2.7 million in legal costs and £4.3 million on external advisers for the reviews that it has commissioned. The refranchising process was a major endeavour, with considerable complexity and uncertainty. The objectives of the Department for Transport were insufficiently clear during the franchise competition. The Department delayed the issuing of the invitation to tender by eight months because it had not finalized how it would implement recent policy changes. There was also confusion among Department staff about some aspects of the process. The subordinated loan facility was a particular area of confusion. A subordinated loan is capital provided by the parent company which guarantees franchise payments will be made to the Department should the franchisee get less passenger revenue than expected. However, there were significant errors in the tool the Department used to calculate how big a loan it would require bidders to have. The competition lacked strong project management and there was no clear route for the project team to get approval for major issues. No one person oversaw the whole process or could see patterns of emerging problems.
Lessons from Cancelling the InterCity West Coast Franchise Competition
Author: Great Britain: National Audit Office
Publisher: The Stationery Office
ISBN: 9780102980523
Category : Business & Economics
Languages : en
Pages : 52
Book Description
The Department for Transport competition to let the Intercity West Coast franchise lacked management oversight and the governance of the project was confused, according to the National Audit Office. The full cost to the taxpayer is unknown but likely to be significant, with at least £1.9 million in staff and adviser costs, £2.7 million in legal costs and £4.3 million on external advisers for the reviews that it has commissioned. The refranchising process was a major endeavour, with considerable complexity and uncertainty. The objectives of the Department for Transport were insufficiently clear during the franchise competition. The Department delayed the issuing of the invitation to tender by eight months because it had not finalized how it would implement recent policy changes. There was also confusion among Department staff about some aspects of the process. The subordinated loan facility was a particular area of confusion. A subordinated loan is capital provided by the parent company which guarantees franchise payments will be made to the Department should the franchisee get less passenger revenue than expected. However, there were significant errors in the tool the Department used to calculate how big a loan it would require bidders to have. The competition lacked strong project management and there was no clear route for the project team to get approval for major issues. No one person oversaw the whole process or could see patterns of emerging problems.
Publisher: The Stationery Office
ISBN: 9780102980523
Category : Business & Economics
Languages : en
Pages : 52
Book Description
The Department for Transport competition to let the Intercity West Coast franchise lacked management oversight and the governance of the project was confused, according to the National Audit Office. The full cost to the taxpayer is unknown but likely to be significant, with at least £1.9 million in staff and adviser costs, £2.7 million in legal costs and £4.3 million on external advisers for the reviews that it has commissioned. The refranchising process was a major endeavour, with considerable complexity and uncertainty. The objectives of the Department for Transport were insufficiently clear during the franchise competition. The Department delayed the issuing of the invitation to tender by eight months because it had not finalized how it would implement recent policy changes. There was also confusion among Department staff about some aspects of the process. The subordinated loan facility was a particular area of confusion. A subordinated loan is capital provided by the parent company which guarantees franchise payments will be made to the Department should the franchisee get less passenger revenue than expected. However, there were significant errors in the tool the Department used to calculate how big a loan it would require bidders to have. The competition lacked strong project management and there was no clear route for the project team to get approval for major issues. No one person oversaw the whole process or could see patterns of emerging problems.
Cancellation of the InterCity West Coast Franchise Competition
Author: Great Britain: Parliament: House of Commons: Transport Committee
Publisher: The Stationery Office
ISBN: 9780215053190
Category : Business & Economics
Languages : en
Pages : 64
Book Description
Embarking on an ambitious, perhaps unachievable, reform of rail franchising, in haste, on the UK's most complex piece of railway was irresponsible. Many of the problems with the franchise competition, detailed in the Laidlaw report, reflect very badly on civil servants at the DfT. However, ministers approved a complex - perhaps unworkable - franchising policy at the same time as overseeing major cuts to the Department's resources. This was a recipe for failure which the DfT must learn from urgently. While the Department has already published a response to the Laidlaw report which Mr Laidlaw described as 'very encouraging', and has initiated a review of franchise MPs warn that a number of matters remain to be adequately resolved. The Committee calls on the Secretary of State and the Department for Transport to: explain why ministers and senior officials were misled about how subordinated loan facilities were calculated, if necessary after disciplinary proceedings against staff have concluded; complete a full email capture and get to the bottom of whether or not any officials manipulated the outcome of the competition to ensure First Group were awarded the contracts; provide a comprehensive breakdown of costs arising from the cancellation of the West Coast Mainline franchise competition. The Committee also wants to establish what lessons current and future ministers must learn from this episode
Publisher: The Stationery Office
ISBN: 9780215053190
Category : Business & Economics
Languages : en
Pages : 64
Book Description
Embarking on an ambitious, perhaps unachievable, reform of rail franchising, in haste, on the UK's most complex piece of railway was irresponsible. Many of the problems with the franchise competition, detailed in the Laidlaw report, reflect very badly on civil servants at the DfT. However, ministers approved a complex - perhaps unworkable - franchising policy at the same time as overseeing major cuts to the Department's resources. This was a recipe for failure which the DfT must learn from urgently. While the Department has already published a response to the Laidlaw report which Mr Laidlaw described as 'very encouraging', and has initiated a review of franchise MPs warn that a number of matters remain to be adequately resolved. The Committee calls on the Secretary of State and the Department for Transport to: explain why ministers and senior officials were misled about how subordinated loan facilities were calculated, if necessary after disciplinary proceedings against staff have concluded; complete a full email capture and get to the bottom of whether or not any officials manipulated the outcome of the competition to ensure First Group were awarded the contracts; provide a comprehensive breakdown of costs arising from the cancellation of the West Coast Mainline franchise competition. The Committee also wants to establish what lessons current and future ministers must learn from this episode
Progress in the Thameslink programme
Author: Great Britain: National Audit Office
Publisher: Stationery Office
ISBN: 9780102983739
Category : Business & Economics
Languages : en
Pages : 44
Book Description
The Department for Transport has done well so far to contain the infrastructure costs for the Thameslink Programme within the original budget. Phase one of the Programme cost £1.704 billion, was completed on time and was £143 million under budget. However, delays of more than three years in agreeing the contract to buy new trains mean that delivering value for money from the Programme as a whole is at greater risk than the National Audit Office would have expected at this stage. There continues to be a robust transport case for the £3.552 billion (at 2006 prices) Programme. Thameslink services have consistently been among the most crowded London routes with passengers amongst the least satisfied with space on trains; and demand is forecast to increase. The Department estimates that the Programme will make net present benefits of £2.9 billion through reduced journey times, reduced overcrowding on trains and quicker interchanges between services. The Department needs to manage a complex interaction between completing the infrastructure project; buying new trains; and letting a new franchise. Delays to any of these projects can delay significantly or complicate delivery of other parts of the Programme. The award of the estimated £1.6 billion contract to buy new trains is currently delayed by over three years and this has implications for the rest of the programme. And until the contract is let it will not be clear whether delivery of the whole Programme by 2018 is still feasible.
Publisher: Stationery Office
ISBN: 9780102983739
Category : Business & Economics
Languages : en
Pages : 44
Book Description
The Department for Transport has done well so far to contain the infrastructure costs for the Thameslink Programme within the original budget. Phase one of the Programme cost £1.704 billion, was completed on time and was £143 million under budget. However, delays of more than three years in agreeing the contract to buy new trains mean that delivering value for money from the Programme as a whole is at greater risk than the National Audit Office would have expected at this stage. There continues to be a robust transport case for the £3.552 billion (at 2006 prices) Programme. Thameslink services have consistently been among the most crowded London routes with passengers amongst the least satisfied with space on trains; and demand is forecast to increase. The Department estimates that the Programme will make net present benefits of £2.9 billion through reduced journey times, reduced overcrowding on trains and quicker interchanges between services. The Department needs to manage a complex interaction between completing the infrastructure project; buying new trains; and letting a new franchise. Delays to any of these projects can delay significantly or complicate delivery of other parts of the Programme. The award of the estimated £1.6 billion contract to buy new trains is currently delayed by over three years and this has implications for the rest of the programme. And until the contract is let it will not be clear whether delivery of the whole Programme by 2018 is still feasible.
Department for Transport
Author: Great Britain: Parliament: House of Commons: Committee of Public Accounts
Publisher: The Stationery Office
ISBN: 9780215054395
Category : Business & Economics
Languages : en
Pages : 48
Book Description
The Department for Transport's complete lack of common sense in the way it ran the West Coast franchise competition has landed the taxpayer with a bill of £50 million at the very least. If you factor in the cost of delays to investment on the line, and the potential knock-on effect on other franchise competitions, then the final cost to the taxpayer will be very much larger. The Department made fundamental errors in calculating the level of risk capital it would require bidders to put on the table and it did not demand appropriate levels of capital from both bidders. Faced with the possibility of legal challenge, it cancelled the competition. The Department failed to learn from mistakes made in previous projects. Recommendations made in the Committee's report 'The failure of Metronet' (HC 390, session 2009-10, ISBN 9780215544216) to prevent a lack of oversight and information were clearly not applied in this competition. Cuts in staffing and in consultancy budgets contributed to a lack of key skills. There was no single person responsible from beginning to end and, therefore, no one who had to live with the consequences of bad policy decisions. For three months, there was no single person in charge at all. Not only that, there was no senior civil servant in the team responsible for the work, despite the critical importance of this multi-billion pound franchise. Given that the Department got it so wrong over this competition, there is concern over how properly it will handle future projects, including HS2 and Thameslink
Publisher: The Stationery Office
ISBN: 9780215054395
Category : Business & Economics
Languages : en
Pages : 48
Book Description
The Department for Transport's complete lack of common sense in the way it ran the West Coast franchise competition has landed the taxpayer with a bill of £50 million at the very least. If you factor in the cost of delays to investment on the line, and the potential knock-on effect on other franchise competitions, then the final cost to the taxpayer will be very much larger. The Department made fundamental errors in calculating the level of risk capital it would require bidders to put on the table and it did not demand appropriate levels of capital from both bidders. Faced with the possibility of legal challenge, it cancelled the competition. The Department failed to learn from mistakes made in previous projects. Recommendations made in the Committee's report 'The failure of Metronet' (HC 390, session 2009-10, ISBN 9780215544216) to prevent a lack of oversight and information were clearly not applied in this competition. Cuts in staffing and in consultancy budgets contributed to a lack of key skills. There was no single person responsible from beginning to end and, therefore, no one who had to live with the consequences of bad policy decisions. For three months, there was no single person in charge at all. Not only that, there was no senior civil servant in the team responsible for the work, despite the critical importance of this multi-billion pound franchise. Given that the Department got it so wrong over this competition, there is concern over how properly it will handle future projects, including HS2 and Thameslink
Constitutional & Administrative Law
Author: Hilaire Barnett
Publisher: Routledge
ISBN: 1315458357
Category : Law
Languages : en
Pages : 1323
Book Description
Hilaire Barnett’s Constitutional and Administrative Law has provided generations of students with reliable, accessible and comprehensive coverage of the Public Law syllabus. Mapped to the common course outline, it equips students with an understanding of the constitution’s past, present and future by analysing and illustrating the political and socio-historical contexts which have shaped the major legal rules and principles of public law, as well as on-going constitutional reform. The 12th edition will address key recent developments including: The referendum result on the UK’s membership of the EU and its ongoing impact on constitutional and administrative law The continuing process of devolution to the nations Terrorism and national security Future developments, particularly in relation to 'Brexit' will be discussed in regular updates to the companion website.
Publisher: Routledge
ISBN: 1315458357
Category : Law
Languages : en
Pages : 1323
Book Description
Hilaire Barnett’s Constitutional and Administrative Law has provided generations of students with reliable, accessible and comprehensive coverage of the Public Law syllabus. Mapped to the common course outline, it equips students with an understanding of the constitution’s past, present and future by analysing and illustrating the political and socio-historical contexts which have shaped the major legal rules and principles of public law, as well as on-going constitutional reform. The 12th edition will address key recent developments including: The referendum result on the UK’s membership of the EU and its ongoing impact on constitutional and administrative law The continuing process of devolution to the nations Terrorism and national security Future developments, particularly in relation to 'Brexit' will be discussed in regular updates to the companion website.
High Speed 2
Author: Great Britain: National Audit Office
Publisher: Stationery Office
ISBN: 9780102981421
Category : Business & Economics
Languages : en
Pages : 56
Book Description
In this early examination of progress by the Department for Transport in planning for the High Speed 2 rail network, the National Audit Office expresses reservations about the Department's business case. The Department has poorly articulated the strategic need for a transformation in rail capacity and how High Speed 2 will help generate regional economic growth. The Department's methodology for appraising the project puts a high emphasis on journey-time savings, but the relationship between these savings and the strategic reasons for doing the project, such as rebalancing regional economies, is unclear. The benefit-cost ratio calculated for phase one has twice contained errors and the Department has been slow to carry out its own assurance of the underlying analysis. The most recent benefit-cost ratio (published in August 2012) is 1.4 to 1 but is likely to change as the ratio is sensitive to changes in data underpinning assumptions, such as GDP growth forecasts. It does not, however, reflect the Department's current assumption on the relationship between passenger numbers and GDP growth. The Department should also carry out research into how business travellers use their time on trains. HS2 Limited has also not yet analysed the effect on passenger demand, revenues and the benefit-cost ratio of charging passengers premium prices. The NAO estimates that there is a £3.3 billion funding gap over four years (2017-18 to 2020-21) which the government has yet to decide how to fill.
Publisher: Stationery Office
ISBN: 9780102981421
Category : Business & Economics
Languages : en
Pages : 56
Book Description
In this early examination of progress by the Department for Transport in planning for the High Speed 2 rail network, the National Audit Office expresses reservations about the Department's business case. The Department has poorly articulated the strategic need for a transformation in rail capacity and how High Speed 2 will help generate regional economic growth. The Department's methodology for appraising the project puts a high emphasis on journey-time savings, but the relationship between these savings and the strategic reasons for doing the project, such as rebalancing regional economies, is unclear. The benefit-cost ratio calculated for phase one has twice contained errors and the Department has been slow to carry out its own assurance of the underlying analysis. The most recent benefit-cost ratio (published in August 2012) is 1.4 to 1 but is likely to change as the ratio is sensitive to changes in data underpinning assumptions, such as GDP growth forecasts. It does not, however, reflect the Department's current assumption on the relationship between passenger numbers and GDP growth. The Department should also carry out research into how business travellers use their time on trains. HS2 Limited has also not yet analysed the effect on passenger demand, revenues and the benefit-cost ratio of charging passengers premium prices. The NAO estimates that there is a £3.3 billion funding gap over four years (2017-18 to 2020-21) which the government has yet to decide how to fill.
Government Response to the Brown Review of the Rail Franchising Programme
Author: Great Britain: Department for Transport
Publisher: IDRC
ISBN: 9780101867825
Category : Political Science
Languages : en
Pages : 32
Book Description
Dated July 2013. The Brown review published as Cm. 8526 (February 2013, ISBN 9780101852623)
Publisher: IDRC
ISBN: 9780101867825
Category : Political Science
Languages : en
Pages : 32
Book Description
Dated July 2013. The Brown review published as Cm. 8526 (February 2013, ISBN 9780101852623)
Memorandum on the 2012 Civil Service Reform Plan
Author: Great Britain: National Audit Office
Publisher: The Stationery Office
ISBN: 9780102980639
Category : Political Science
Languages : en
Pages : 44
Book Description
The government published its Civil Service Reform Plan (the Plan) in June 2012 (www.civilservice.gov.uk/reform). It followed the publication of the 2011 Open Public Services White Paper (Cm.8145, ISBN 9780101814522) which called for a smaller, more strategic civil service that does less centrally, and commissions more from outside. The Plan has many themes in common with previous initiatives that attempted to reform the civil service, and adapt it to the changing needs of governments and public service users, but is arguably the broadest such reform programme since 1968. This Memorandum is intended primarily to inform the Committee's discussions with the leadership of the civil service about the Plan. Given that the Plan is less than a year old, it is not an evaluation of the reforms in the Plan, the progress made against them, or the implementation arrangements in place. It is designed to support the Committee to engage with the breadth of the Plan, so that they can use their influence to help ensure that its implementation improves efficiency, reinforces Parliamentary accountability and protects value for taxpayers and citizens. The Civil Service, in its present form as of 2012, employs 459,000 people across 106 departments and other bodies. The annual spend on Civil Service pay is £16 billion. The projected cost reduction for the Civil Service, between 2010 to 2015 is £80 billion and the projected reduction in the number of full-time equivalent civil servants over the same period is 110,000 representing about 23% of total staff.
Publisher: The Stationery Office
ISBN: 9780102980639
Category : Political Science
Languages : en
Pages : 44
Book Description
The government published its Civil Service Reform Plan (the Plan) in June 2012 (www.civilservice.gov.uk/reform). It followed the publication of the 2011 Open Public Services White Paper (Cm.8145, ISBN 9780101814522) which called for a smaller, more strategic civil service that does less centrally, and commissions more from outside. The Plan has many themes in common with previous initiatives that attempted to reform the civil service, and adapt it to the changing needs of governments and public service users, but is arguably the broadest such reform programme since 1968. This Memorandum is intended primarily to inform the Committee's discussions with the leadership of the civil service about the Plan. Given that the Plan is less than a year old, it is not an evaluation of the reforms in the Plan, the progress made against them, or the implementation arrangements in place. It is designed to support the Committee to engage with the breadth of the Plan, so that they can use their influence to help ensure that its implementation improves efficiency, reinforces Parliamentary accountability and protects value for taxpayers and citizens. The Civil Service, in its present form as of 2012, employs 459,000 people across 106 departments and other bodies. The annual spend on Civil Service pay is £16 billion. The projected cost reduction for the Civil Service, between 2010 to 2015 is £80 billion and the projected reduction in the number of full-time equivalent civil servants over the same period is 110,000 representing about 23% of total staff.
ITF Roundtable Reports Ex-Post Assessment of Transport Investments and Policy Interventions
Author: International Transport Forum
Publisher: OECD Publishing
ISBN: 9282108155
Category :
Languages : en
Pages : 132
Book Description
Ex-post evaluation is important to improving the delivery of transport policy objectives. It can be used for multiple purposes at the core of which is the improvement of ex-ante assessment. A small number of jurisdictions employ ex-post evaluation systematically and leading experience is ...
Publisher: OECD Publishing
ISBN: 9282108155
Category :
Languages : en
Pages : 132
Book Description
Ex-post evaluation is important to improving the delivery of transport policy objectives. It can be used for multiple purposes at the core of which is the improvement of ex-ante assessment. A small number of jurisdictions employ ex-post evaluation systematically and leading experience is ...
National Audit Office (NAO) - Cross-Government: Infrastructure Investment: The Impact on Consumer Bills: Volume II - HC 812-II
Author: Great Britain: National Audit Office
Publisher: The Stationery Office
ISBN: 9780102987058
Category : Business & Economics
Languages : en
Pages : 46
Book Description
Government and regulators do not know by how much overall expected new investment by the private sector in infrastructure will increase household utility bills and whether bills will be affordable. The National Audit Office has recommended that the Treasury ensure there are mechanisms to assess the cumulative impact of infrastructure investment on consumer bills. This report, which focuses on the energy, water and, to a lesser extent, telecoms sectors, recognizes that the UK requires significant investment in new infrastructure. The Treasury expects that over two-thirds of the £310 billion worth of the planned infrastructure it has identified will be privately financed, owned and operated but paid for by consumers through their utility bills. High levels of expected new investment in infrastructure mean that energy and water bills may rise significantly from current levels. The available projections suggest that increases in both energy and water bills will continue to outstrip inflation, on average, up to 2030. This is particularly concerning, given that energy and water bills have increased significantly in recent years, while incomes have not. The affordability of utility bills can be assessed only in the context of wider pressures on household expenditure, including an understanding of all household bills as well as potential trends in household incomes. There is a range of schemes to support vulnerable consumers but without a fuller understanding of affordability in the round, government and regulators cannot assess the adequacy of these schemes, now or in the future
Publisher: The Stationery Office
ISBN: 9780102987058
Category : Business & Economics
Languages : en
Pages : 46
Book Description
Government and regulators do not know by how much overall expected new investment by the private sector in infrastructure will increase household utility bills and whether bills will be affordable. The National Audit Office has recommended that the Treasury ensure there are mechanisms to assess the cumulative impact of infrastructure investment on consumer bills. This report, which focuses on the energy, water and, to a lesser extent, telecoms sectors, recognizes that the UK requires significant investment in new infrastructure. The Treasury expects that over two-thirds of the £310 billion worth of the planned infrastructure it has identified will be privately financed, owned and operated but paid for by consumers through their utility bills. High levels of expected new investment in infrastructure mean that energy and water bills may rise significantly from current levels. The available projections suggest that increases in both energy and water bills will continue to outstrip inflation, on average, up to 2030. This is particularly concerning, given that energy and water bills have increased significantly in recent years, while incomes have not. The affordability of utility bills can be assessed only in the context of wider pressures on household expenditure, including an understanding of all household bills as well as potential trends in household incomes. There is a range of schemes to support vulnerable consumers but without a fuller understanding of affordability in the round, government and regulators cannot assess the adequacy of these schemes, now or in the future