Installation Restoration Program. Phase 2. Confirmation/Quantification. Stage 1. Problem Confirmation Study: Otis Air National Guard Base, Massachusetts, Air National Guard Support Center, Andrews Air Force Base, Maryland PDF Download

Are you looking for read ebook online? Search for your book and save it on your Kindle device, PC, phones or tablets. Download Installation Restoration Program. Phase 2. Confirmation/Quantification. Stage 1. Problem Confirmation Study: Otis Air National Guard Base, Massachusetts, Air National Guard Support Center, Andrews Air Force Base, Maryland PDF full book. Access full book title Installation Restoration Program. Phase 2. Confirmation/Quantification. Stage 1. Problem Confirmation Study: Otis Air National Guard Base, Massachusetts, Air National Guard Support Center, Andrews Air Force Base, Maryland by R. L. Kraybill. Download full books in PDF and EPUB format.

Installation Restoration Program. Phase 2. Confirmation/Quantification. Stage 1. Problem Confirmation Study: Otis Air National Guard Base, Massachusetts, Air National Guard Support Center, Andrews Air Force Base, Maryland

Installation Restoration Program. Phase 2. Confirmation/Quantification. Stage 1. Problem Confirmation Study: Otis Air National Guard Base, Massachusetts, Air National Guard Support Center, Andrews Air Force Base, Maryland PDF Author: R. L. Kraybill
Publisher:
ISBN:
Category :
Languages : en
Pages : 140

Book Description
A Problem Confirmation Study was performed at seven sites on Otis Air National Guard Base: the Current and Former Training Areas, the Base Landfill, the Nondestructive Inspection Laboratory, the Fuel Test Dump Site, the Railyard Fuel Pumping Station, and the Petrol Fuel Storage Area. The field investigation was conducted in two stages, in November 1983 through January 1984, and in October through December 1984. Resampling was performed at selected locations in April and July 1985. A total of 11 monitor wells were installed and sampled and test pit investigations were conducted at six sites. In addition, the contents of a sump tank, and two header pipes for fuel transmission lines were sampled. Analytes included TOC, TOX, cyanide, phenols, Safe Drinking Water metals, pesticides and herbicides, and in the second round, priority pollutant volatile organic compounds and a GC 'fingerprint' scan for fuel products. On the basis of the field work findings, it is concluded that, to date, water quality impacts on groundwater from past activities have been minimal.

Installation Restoration Program. Phase 2. Confirmation/Quantification. Stage 1. Problem Confirmation Study: Otis Air National Guard Base, Massachusetts, Air National Guard Support Center, Andrews Air Force Base, Maryland

Installation Restoration Program. Phase 2. Confirmation/Quantification. Stage 1. Problem Confirmation Study: Otis Air National Guard Base, Massachusetts, Air National Guard Support Center, Andrews Air Force Base, Maryland PDF Author: R. L. Kraybill
Publisher:
ISBN:
Category :
Languages : en
Pages : 140

Book Description
A Problem Confirmation Study was performed at seven sites on Otis Air National Guard Base: the Current and Former Training Areas, the Base Landfill, the Nondestructive Inspection Laboratory, the Fuel Test Dump Site, the Railyard Fuel Pumping Station, and the Petrol Fuel Storage Area. The field investigation was conducted in two stages, in November 1983 through January 1984, and in October through December 1984. Resampling was performed at selected locations in April and July 1985. A total of 11 monitor wells were installed and sampled and test pit investigations were conducted at six sites. In addition, the contents of a sump tank, and two header pipes for fuel transmission lines were sampled. Analytes included TOC, TOX, cyanide, phenols, Safe Drinking Water metals, pesticides and herbicides, and in the second round, priority pollutant volatile organic compounds and a GC 'fingerprint' scan for fuel products. On the basis of the field work findings, it is concluded that, to date, water quality impacts on groundwater from past activities have been minimal.

Energy Research Abstracts

Energy Research Abstracts PDF Author:
Publisher:
ISBN:
Category : Power resources
Languages : en
Pages : 632

Book Description


Energy Research Abstracts

Energy Research Abstracts PDF Author:
Publisher:
ISBN:
Category : Power resources
Languages : en
Pages : 908

Book Description
Includes all works deriving from DOE, other related government-sponsored information and foreign nonnuclear information.

Government Reports Annual Index

Government Reports Annual Index PDF Author:
Publisher:
ISBN:
Category : Research
Languages : en
Pages : 1058

Book Description
Sections 1-2. Keyword Index.--Section 3. Personal author index.--Section 4. Corporate author index.-- Section 5. Contract/grant number index, NTIS order/report number index 1-E.--Section 6. NTIS order/report number index F-Z.

Government Reports Announcements & Index

Government Reports Announcements & Index PDF Author:
Publisher:
ISBN:
Category : Science
Languages : en
Pages : 1364

Book Description


First 109 Minutes: 9/11 And The U.S. Air Force.

First 109 Minutes: 9/11 And The U.S. Air Force. PDF Author: Priscilla D. Jones
Publisher: Pickle Partners Publishing
ISBN: 1782893857
Category : History
Languages : en
Pages : 129

Book Description
Tuesday, Sep. 11, 2001, dawned cool and clear, with sunny skies all along the eastern seaboard. For Air Force aviators like Lt. Col. Timothy "Duff" Duffy of the 102d Fighter Wing at Otis Air National Guard Base, Massachusetts, the day held the promise of perfect flying weather, at a time when the U.S. civil aviation system was enjoying a period of relative peace, despite concerns about a growing terrorist threat. More than ten years had passed since the last hijacking or bombing of a U.S. air carrier. That morning, however, the country came under a shocking, coordinated aerial assault by nineteen al Qaeda hijackers...The attack plan carried out by the suicide operatives had been years in the making. It was intended to cause mass, indiscriminate casualties and to destroy or damage the nation’s financial, military, and political centers, four high value U.S. targets selected by bin Laden, independent operator Khalid Sheikh Mohammed, and al Qaeda operations chief Mohammed Atef... By the time 1 World Trade Center, North Tower, collapsed at 10:28 a.m. EDT, almost three thousand people had been killed or were dying; the financial center of the U.S. had been reduced to burning, toxic rubble; the iconic symbol of the military strength of the country had been severely damaged; the tranquility of a field in Pennsylvania had been shattered; U.S. Air Force and Air National Guard fighter aircraft had set up combat air patrols over Washington, D.C., and New York City; and the administration of President George W. Bush and the Department of Defense (DOD) had begun shifting major resources of the federal government and military services to a new national priority, homeland defense.

Installation Restoration Program. Phase 2. Confirmation/Quantification. Stage 1. Air Force Plant 4, Fort Worth, Texas. Volume 2. Appendix A-1

Installation Restoration Program. Phase 2. Confirmation/Quantification. Stage 1. Air Force Plant 4, Fort Worth, Texas. Volume 2. Appendix A-1 PDF Author: RADIAN CORP AUSTIN TX.
Publisher:
ISBN:
Category :
Languages : en
Pages : 621

Book Description
Methyl ethyl ketone analysis was performed by Radian chromatography laboratory. The results of the analysis are in a memo included in this volume. All other samples for chemical analysis were submitted to Radian Analytical Services Laboratory. The samples were logged in, and the data reported in batches . Each batch submitted was assigned a RAS work order number. Volume 2, Volume 3, and Volume 4, Appendix A-1 contain the analytical data reports for the various batches of samples. The bulk of data necessitated the results be bound in three volumes. Volumes 2, Volume 3, and Volume 4, Appendix A-1 contain Tables A.1-1, A.1-3, and A.1-5, respectively, which are a sequential listing of the reports contained in that volume by batch number and Tables A.1-2, A.1-4, and A.1-6, respectively, which are a sample log and cross-reference table. These tables serve as a sample log and cross-reference well numbers, OEHL numbers and the RAS work order numbers under which the results are located. Pages in Appendix A are numbered by the volume number followed by the page number of that volume. For example, Page 2 001 is the first chemistry data page of Volume 2.

Pentagon 9/11

Pentagon 9/11 PDF Author: Alfred Goldberg
Publisher: Office of the Secretary, Historical Offi
ISBN:
Category : Architecture
Languages : en
Pages : 330

Book Description
The most comprehensive account to date of the 9/11 attack on the Pentagon and aftermath, this volume includes unprecedented details on the impact on the Pentagon building and personnel and the scope of the rescue, recovery, and caregiving effort. It features 32 pages of photographs and more than a dozen diagrams and illustrations not previously available.

Installation Restoration Program Phase 2. Confirmation/Quantification Stage 2

Installation Restoration Program Phase 2. Confirmation/Quantification Stage 2 PDF Author: DAMES AND MOORE PARK RIDGE IL.
Publisher:
ISBN:
Category :
Languages : en
Pages : 353

Book Description
Three sites were investigated at Elelson AFB during the Phse II, Stage 2 field evaluation of the IRP. The sites were the sewage treatment plant spill ponds and treated effluent leaching ponds (Site 32) and two base landfills (Sites 2 and 1). A geophysical survey was performed in the vicinity of the sludge treatment plant to help define areas of high electromagnetic conductivity (i.e., potential contamination) and aid in the placement of monitor wells. Eight monitor wells were installed during Stage 2. Ground water samples from Stage 1 and Stage 2 wells were analyzed for purgeable lead, arsenic, cadmium, chromium, mercury and silver. Soil samples from the vicinity of one of the landfills (Site 1) were tested for the presence of pesticides. Trace quantities of purgeable halocarbons and petroleum hydrocarbons were detected in the wells from all three sites. Drinking water standards for total trihalomethanes were not exceeded for any of these samples. Arsenic and cadmium were detected in wells at concentrations were elevated in the vicinity of the sewage treatment plant. Only one well, in close proximity to the sewage sludge drying beds, was found to have nitrate, nitrite concentrations above the Primary Drinking Water Standard. A well downgradient from this site had nitrate, nitrite levels below the same standard. Soils at Site 1 contain trace quantities of DDE, DDD, and DDT. No pesticides were detected in groundwater from the monitor well at this site.

Air Force Handbook 1

Air Force Handbook 1 PDF Author: U. S. Air Force
Publisher:
ISBN: 9781387952380
Category : Reference
Languages : en
Pages : 582

Book Description
This handbook implements AFPD 36-22, Air Force Military Training. Information in this handbook is primarily from Air Force publications and contains a compilation of policies, procedures, and standards that guide Airmen's actions within the Profession of Arms. This handbook applies to the Regular Air Force, Air Force Reserve and Air National Guard. This handbook contains the basic information Airmen need to understand the professionalism required within the Profession of Arms. Attachment 1 contains references and supporting information used in this publication. This handbook is the sole source reference for the development of study guides to support the enlisted promotion system. Enlisted Airmen will use these study guide to prepare for their Promotion Fitness Examination (PFE) or United States Air Force Supervisory Examination (USAFSE).