Industrial Fuel Gas Demonstration Plant Program. Demonstration Plant Operation Plan (Deliverable No. 38). PDF Download

Are you looking for read ebook online? Search for your book and save it on your Kindle device, PC, phones or tablets. Download Industrial Fuel Gas Demonstration Plant Program. Demonstration Plant Operation Plan (Deliverable No. 38). PDF full book. Access full book title Industrial Fuel Gas Demonstration Plant Program. Demonstration Plant Operation Plan (Deliverable No. 38). by . Download full books in PDF and EPUB format.

Industrial Fuel Gas Demonstration Plant Program. Demonstration Plant Operation Plan (Deliverable No. 38).

Industrial Fuel Gas Demonstration Plant Program. Demonstration Plant Operation Plan (Deliverable No. 38). PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Book Description
The Demo Plant Operating Plan is composed of the following sequence of events starting with the training or personnel, familiarizing of the personnel with the plant and completing the long-term run in the following sequences: inspection during construction, plant completion, shakedown of equipment, process unit startup, shakedown of process units, variable run operation and a turnaround. During the construction period, technical personnel from DRC, MLGW and IGT will be at the plant site becoming familiar with the equipment, its installation and all of the auxiliaries so that on completion of construction they will be well grounded on the plant detail and its configuration. At the same time the supervisory operating personnel will have hands on training the gasifier operation at the IGT pilot plant to develop a field for gasifier operation. As a plant sections are completed, they will be checked out in accordance with the contractor and operator (client) procedure as outlined. Subsequent to this, various vendor designs and furnished equipment will be checked out operating-wise and a performance test run if feasible. The actual startup of the plant will be subsequential with the support areas as utilities, coal handling and waste treatment being placed in operation first. Subsequent to this the process units will be placed in operation starting from the rear of the process train and working forward. Thus the downstream units will be operating before the reactor is run on coal. The reactor will be checked out on coke operation.

Industrial Fuel Gas Demonstration Plant Program. Demonstration Plant Operation Plan (Deliverable No. 38).

Industrial Fuel Gas Demonstration Plant Program. Demonstration Plant Operation Plan (Deliverable No. 38). PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Book Description
The Demo Plant Operating Plan is composed of the following sequence of events starting with the training or personnel, familiarizing of the personnel with the plant and completing the long-term run in the following sequences: inspection during construction, plant completion, shakedown of equipment, process unit startup, shakedown of process units, variable run operation and a turnaround. During the construction period, technical personnel from DRC, MLGW and IGT will be at the plant site becoming familiar with the equipment, its installation and all of the auxiliaries so that on completion of construction they will be well grounded on the plant detail and its configuration. At the same time the supervisory operating personnel will have hands on training the gasifier operation at the IGT pilot plant to develop a field for gasifier operation. As a plant sections are completed, they will be checked out in accordance with the contractor and operator (client) procedure as outlined. Subsequent to this, various vendor designs and furnished equipment will be checked out operating-wise and a performance test run if feasible. The actual startup of the plant will be subsequential with the support areas as utilities, coal handling and waste treatment being placed in operation first. Subsequent to this the process units will be placed in operation starting from the rear of the process train and working forward. Thus the downstream units will be operating before the reactor is run on coal. The reactor will be checked out on coke operation.

Industrial Fuel Gas Demonstration Plant Program. Overall Program Plan for Task IX. Technical Support. Volume II. Pilot Plant Operations. (Deliverable No. 46).

Industrial Fuel Gas Demonstration Plant Program. Overall Program Plan for Task IX. Technical Support. Volume II. Pilot Plant Operations. (Deliverable No. 46). PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Book Description
This document is the second of a two-volume Overall Program Plan for rescheduling Task IX (Technical Support) of the Industrial Fuel Gas Demonstration Plant Program (MLGW/DOE), Contract ET-77-C-01-2582. Volume I presents the schedule and organization for carrying out the overall plan which is divided into three major tasks: Bench Scale Tests, Cold-Flow Model Studies, and Pilot Plant Operations. This volume, Volume II, gives a more detailed presentation of the test objectives and procedures for the most important part of the plan, Pilot Plant Operations. The objective of Volume II is to provide a systematic approach to obtain high carbon conversion under steady-state, ash agglomerating conditions with coal in the U-GAS pilot plant. This will allow the achievement of the principal goal of pilot plant operations, that is, to obtain data for the design of the U-GAS demonstration plant. The test program for pilot plant operations has been formulated with the assistance of the Technical Subcommittee which has members from all the parties involved in the Industrial Fuel Gas Demonstration Plant Program, namely, Memphis Light, Gas and Water Division, Department of Energy, Foster Wheeler Energy Corporation, Delta Refining Company, Institute of Gas Technology, and Monsanto Research Corporation.

Energy Research Abstracts

Energy Research Abstracts PDF Author:
Publisher:
ISBN:
Category : Power resources
Languages : en
Pages : 424

Book Description


Industrial Fuel Gas Demonstration Plant Program. Overall Program Plan for Task IX. Technical Support. Volume I. Plan, Schedule and Organization. (Deliverable No. 46).

Industrial Fuel Gas Demonstration Plant Program. Overall Program Plan for Task IX. Technical Support. Volume I. Plan, Schedule and Organization. (Deliverable No. 46). PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Book Description
The Industrial Fuel Gas Demonstration Plant Program (MLGW/DOE), Contract ET-77-C-01-2582, has been slowed due to lack of an adequate data base for demonstration plant design. This design data base is to be developed by Institute of Gas Technology (IGT) at their U-GAS pilot plant. While initial data and operating results from the pilot plant have been encouraging, ash-balanced operation with coal using the technique of ash agglomeration has proven to be more difficult than originally envisioned. Ash must be removed from the gasifier at the same rate as it is being fed to achieve overall ash balance. Adequate ash balance has been achieved by bed withdrawal, but in order to attain high levels of carbon utilization, preferential removal of high-ash material from the gasifier will be required. It is the conclusion of all parties involved that the operating parameters necessary to achieve ash balance and high carbon utilization must be demonstrated at the pilot plant level before a full scale demonstration plant design effort is started. IGT, with guidance from the program Steering Committee and assistance from the Technical Sub-Committee has re-evaluated its efforts under Task IX, Technical Support. With a critical assessment of data generated to date and an analysis of demonstration plant design data need formulated by Foster-Wheeler Energy Corporation, IGT has developed the attached program to meet the demonstration plant design data requirements. The time required for execution of this revised program is seven months. The cost of completing the program is $1,100,000 over and above that originally budgeted for Task IX. The success of the IFG Demonstration Plant Program depends upon results achieved under this seven month program.

Industrial Fuel Gas Demonstration Plant Program. Demonstration Plant Construction Plan (Deliverable No. 37).

Industrial Fuel Gas Demonstration Plant Program. Demonstration Plant Construction Plan (Deliverable No. 37). PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Book Description
A network logic diagram of the IFGDP construction program is shown on the attached charts, together with a more detailed network for the gasification and cooling/scrubbing sections, which comprise the most intricate construction work.

Industrial Fuel Gas Demonstration Plant Program

Industrial Fuel Gas Demonstration Plant Program PDF Author: Memphis (Tenn.). Light, Gas, and Water Division
Publisher:
ISBN:
Category : Coal gasification
Languages : en
Pages : 300

Book Description


Industrial Fuel Gas Demonstration Plant Program. Phase I. Report/final Report (Deliverable No. 5). [Identification of Phase I Activities, Deliverable Items and Dates Submitted].

Industrial Fuel Gas Demonstration Plant Program. Phase I. Report/final Report (Deliverable No. 5). [Identification of Phase I Activities, Deliverable Items and Dates Submitted]. PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Book Description


Industrial Fuel Gas Demonstration Plant Project. Management Plan (Deliverable No. 1).

Industrial Fuel Gas Demonstration Plant Project. Management Plan (Deliverable No. 1). PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Book Description
This Project Management Plan establishes the organization and procedures by which the Memphis Medium-Btu Fuel Gas Demonstration Plant will be managed and defines the responsibilities and functions of project participants. This plan should not be construed as modifying contract provisions or documents in any way. It applies mainly to Phase I activities; the conceptual design and development of the demonstration plant. Plans for Phases II and III will be prepared before these phases are initiated. This management plan is intended to be a working document to be revised as the needs of the project dictate. The looseleaf format will facilitate changes by making it possible to add and remove pages.

Industrial Fuel Gas Demonstration Project, Memphis

Industrial Fuel Gas Demonstration Project, Memphis PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 668

Book Description


Industrial Fuel Gas Demonstration Plant Program. Construction Permit. Compliance Plan. (Deliverable No. 31).

Industrial Fuel Gas Demonstration Plant Program. Construction Permit. Compliance Plan. (Deliverable No. 31). PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Book Description
The objective of this compliance plan is to insure that all required permits are filed and obtained prior to the start of construction of the U-gas demonstration plant. This plan addresses the permits in the following areas: construction, electrical, mechanical, plumbing, federal aviation lighting, and as-required permits. Each permit area is introduced by a brief summary of the permits required and the significant circumstances and/or conditions affecting permit acquisition. Each permit is then discussed in detail according to a format which includes the following: brief introduction of permit, responsible regulator agency, other potential reviewing agency(s), information needed for permit, filing procedures, normal review period, permit duration period, and permit fees. Copies of the actual application forms, guidelines for completing the applications, statements on required information and agency contacts are contained in the Appendices.