Are you looking for read ebook online? Search for your book and save it on your Kindle device, PC, phones or tablets. Download Heber Geothermal Demonstration Power Plant. Final Report PDF full book. Access full book title Heber Geothermal Demonstration Power Plant. Final Report by . Download full books in PDF and EPUB format.

Heber Geothermal Demonstration Power Plant. Final Report

Heber Geothermal Demonstration Power Plant. Final Report PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Book Description
The binary power plant is to be a 45 MW net electrical facility deriving energy from the low salinity (14,000 ppM), moderate temperature (360/sup 0/F, 182/sup 0/C) Heber reservoir in Southern California. The optimized baseline design established for the power plant is described, and the design and optimization work that formed the basis for the baseline design is documented. The work accomplished during Phase II, Preliminary Design is also recorded, and a base provided from which detailed plant design could be continued. Related project activities in the areas of licensing, environmental, cost, and schedule are also described. The approach used to establish the Phase II optimized baseline design was to (1) review the EPRI Phase I conceptual design and feasibility studies; (2) identify current design criteria and state-of-the-art technology; and (3) develop a preliminary design optimized to the Heber site based on utiliity standards.

Heber Geothermal Demonstration Power Plant. Final Report

Heber Geothermal Demonstration Power Plant. Final Report PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Book Description
The binary power plant is to be a 45 MW net electrical facility deriving energy from the low salinity (14,000 ppM), moderate temperature (360/sup 0/F, 182/sup 0/C) Heber reservoir in Southern California. The optimized baseline design established for the power plant is described, and the design and optimization work that formed the basis for the baseline design is documented. The work accomplished during Phase II, Preliminary Design is also recorded, and a base provided from which detailed plant design could be continued. Related project activities in the areas of licensing, environmental, cost, and schedule are also described. The approach used to establish the Phase II optimized baseline design was to (1) review the EPRI Phase I conceptual design and feasibility studies; (2) identify current design criteria and state-of-the-art technology; and (3) develop a preliminary design optimized to the Heber site based on utiliity standards.

Heber Geothermal Binary Demonstration Project Quarterly Technical Progress Report, April 1, 1982--June 30, 1982

Heber Geothermal Binary Demonstration Project Quarterly Technical Progress Report, April 1, 1982--June 30, 1982 PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Book Description
The purpose of this quarterly technical progress report is to document work completed on the nominal 65 Megawatt (Mwe gross) Heber Geothermal Binary Demonstration Project, located at Heber, California, during the period of April 1, 1982-June 30, 1982. The work was performed by San Diego Gas and Electric Company under the support and cooperation of the U.S. Department of Energy, the Electric Power Research Institute, the Imperial Irrigation District, the California Department of Water Resources, and the Southern California Edison Company. Topics covered in this quarterly report include progress made in the areas of Wells and Fluid Production and Injection Systems, Power Plant Design and Construction, Power Plant Demonstration, and Data Acquisition and Dissemination.

Heber Geothermal Demonstration Power Plant. Interim Report No. 1, August 1977--January 1978

Heber Geothermal Demonstration Power Plant. Interim Report No. 1, August 1977--January 1978 PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Book Description
The work performed from August 1977 through January 1978 pertinent to the design of the Heber Geothermal Demonstration Power Plant is summarized. The report discusses review of earlier baseline geothermal studies performed by Holt/Procon and the design optimization performed by Fluor Engineers and Constructors, Inc., and The Ben Holt Company. The Heber project objective is to design, construct and operate a power plant to produce a net power output of 45 MW/sub e/, deriving energy from a low-salinity, moderate temperature (360°F, 182°C) brine heat source available from the Heber geothermal reservoir. A binary cycle conversion system employs a light aliphatic hydrocarbon mixture to derive heat from the brine supply, throuh heat exchangers, and drive the turbine-generator to produce power. Chevron Resources Company develops the geothermal resource for sale to San Diego Gas and Electric Company. Power output will be distributed to California's Imperial Valley by the Imperial Valley Irrigation District.

Heber Demonstration Plant, Geothermal Binary Electric Power Generation, Imperial County, California

Heber Demonstration Plant, Geothermal Binary Electric Power Generation, Imperial County, California PDF Author:
Publisher:
ISBN:
Category : Electric power production
Languages : en
Pages : 44

Book Description


Geothermal Energy Update

Geothermal Energy Update PDF Author:
Publisher:
ISBN:
Category : Geothermal engineering
Languages : en
Pages : 750

Book Description


Heber Geothermal Binary Demonstration Project Quarterly Technical Progress Report, October 1, 1981--December 31, 1981

Heber Geothermal Binary Demonstration Project Quarterly Technical Progress Report, October 1, 1981--December 31, 1981 PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Book Description
The purpose of this quarterly technical progress report is to document work completed on the nominal 65 Megawatt (Mwe gross) Heber Geothermal Binary Demonstration Project, located at Heber, California, during the period of October 1, 1981, through December 31, 1981. The work was performed by San Diego Gas and Electric Company under the support and cooperation of the U.S. Department of Energy, the Electric Power Research Institute, the Imperial Irrigation District, the California Department of Water Resources, and the Southern California Edison Company. Topics covered in this quarterly report include progress made in the areas of Wells and Fluid Production and Injection Systems, Power Plant Design and Construction, Power Plant Demonstration, and Data Acquisition and Dissemination.

Heber Geothermal Binary Demonstration Project Quarterly Technical Progress Report, October 1, 1982--December 31, 1982

Heber Geothermal Binary Demonstration Project Quarterly Technical Progress Report, October 1, 1982--December 31, 1982 PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Book Description
The purpose of this quarterly technical progress report is to document work completed on the nominal 65 Megawatt (Mwe gross) Heber Geothermal Binary Demonstration Project, located at Heber, California, during the period of October 1, 1982--December 31, 1982. The work was performed by San Diego Gas and Electric Company under the support and cooperation of the U.S. Department of Energy, the Electric Power Research Institute, the Imperial Irrigation District, the California Department of Water Resources, and the Southern California Edison Company. Topics covered in this quarterly report include progress made in the areas of Wells and Fluid Production and Injection Systems, Power Plant Design and Construction, Power Plant Demonstration, and Data Acquisition and Dissemination.

Heber Binary-cycle Geothermal Demonstration Power Plant: Startup and Low-powder Testing

Heber Binary-cycle Geothermal Demonstration Power Plant: Startup and Low-powder Testing PDF Author: J. Berning
Publisher:
ISBN:
Category :
Languages : en
Pages :

Book Description


Heber Geothermal Binary Demonstration Project Quarterly Technical Progress Report, July 1, 1982--September 30, 1982

Heber Geothermal Binary Demonstration Project Quarterly Technical Progress Report, July 1, 1982--September 30, 1982 PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Book Description
The purpose of this quarterly technical progress report is to document work completed on the nominal 65 Megawatt (Mwe gross) Heber Geothermal Binary Demonstration Project, located at Heber, California, during the period of July 1, 1982--September 30, 1982. The work was performed by San Diego Gas and Electric Company under the support and cooperation of the U.S. Department of Energy, the Electric Power Research Institute, the Imperial Irrigation District, the California Department of Water Resources, and the Southern California Edison Company. Topics covered in this quarterly report include progress made in the areas of Wells and Fluid Production and Injection Systems, Power Plant Design and Construction, Power Plant Demonstration, and Data Acquisition and Dissemination.

Heber Geothermal Binary Demonstration Project. Quarterly Technical Progress Report, April 1, 1981-June 30, 1981

Heber Geothermal Binary Demonstration Project. Quarterly Technical Progress Report, April 1, 1981-June 30, 1981 PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Book Description
Work completed on the nominal 65 Megawatt (Mwe gross) Heber Geothermal Binary Demonstration Project, located at Heber, California, during the period of April 1, 1981, through June 30, 1981 is documented. Topics covered include progress made in the areas of Wells and Fluid Production and Injection Systems, Power Plant Design and Construction, Power Plant Demonstration, and Data Acquisition and Dissemination.