Grand Chariton River Basin, Forest Lake Dam, Adair County, Missouri Phase I Inspection Report, National Dam Safety Program PDF Download

Are you looking for read ebook online? Search for your book and save it on your Kindle device, PC, phones or tablets. Download Grand Chariton River Basin, Forest Lake Dam, Adair County, Missouri Phase I Inspection Report, National Dam Safety Program PDF full book. Access full book title Grand Chariton River Basin, Forest Lake Dam, Adair County, Missouri Phase I Inspection Report, National Dam Safety Program by United States. Army. Corps of Engineers. St. Louis District. Download full books in PDF and EPUB format.

Grand Chariton River Basin, Forest Lake Dam, Adair County, Missouri Phase I Inspection Report, National Dam Safety Program

Grand Chariton River Basin, Forest Lake Dam, Adair County, Missouri Phase I Inspection Report, National Dam Safety Program PDF Author: United States. Army. Corps of Engineers. St. Louis District
Publisher:
ISBN:
Category : Dams
Languages : en
Pages : 242

Book Description


Grand Chariton River Basin, Forest Lake Dam, Adair County, Missouri Phase I Inspection Report, National Dam Safety Program

Grand Chariton River Basin, Forest Lake Dam, Adair County, Missouri Phase I Inspection Report, National Dam Safety Program PDF Author: United States. Army. Corps of Engineers. St. Louis District
Publisher:
ISBN:
Category : Dams
Languages : en
Pages : 242

Book Description


National Dam Safety Program. Forest Lake Dam (MO 10128), Grand Chariton River Basin, Adair County, Missouri. Phase I Inspection Report

National Dam Safety Program. Forest Lake Dam (MO 10128), Grand Chariton River Basin, Adair County, Missouri. Phase I Inspection Report PDF Author: PRC CONSOER TOWNSEND INC ST LOUIS MO.
Publisher:
ISBN:
Category :
Languages : en
Pages : 115

Book Description
The Forest Lake Dam is located on Big Creek which is a tributary of the Chariton River, Adair County, Missouri. The main purpose of the dam is to impound water for use in a water supply system operated by the City of Kirksville, Missouri. The impounded water is released by means of the bottom outlet. The lake is also for recreational use. The following problems were observed which could affect the safety of the dam, or which will require maintenance within a reasonable period of time. Heavy brush and trees on the upstream and downstream embankment slope; Rodent activity on the downstream embankment slope; The seepage occurring at the right abutment contact and downstream of the toe of the embankment 500 feet north of the left abutment: Concrete erosion on the ogee spillway crest; A 3-foot by 3-foot hole on the right wall of the spillway channel 30 feet upstream of the spillway chute; Vegetation in the spillway channel between the ogee and the spillway chute, and Inability to operate the two 16-inch gate valves in the valve vault.

Technical Abstract Bulletin

Technical Abstract Bulletin PDF Author:
Publisher:
ISBN:
Category : Science
Languages : en
Pages : 188

Book Description


National Dam Safety Program. Spring Lake Dam (MO 10136), Grand Charton River Basin, Adair County, Missouri. Phase I Inspection Report

National Dam Safety Program. Spring Lake Dam (MO 10136), Grand Charton River Basin, Adair County, Missouri. Phase I Inspection Report PDF Author: Walter G. Shifrin
Publisher:
ISBN:
Category :
Languages : en
Pages : 86

Book Description
This report was prepared under the National Program of Inspection of Non-Federal Dams. This report assesses the general condition of the dam with respect to safety, based on available data and on visual inspection, to determine if the dam poses hazards to human life or property. (Author).

National Dam Safety Program. Water Works Lake Dam (MO 10006), Grand - Chariton River Basin, Randolph County, Missouri. Phase I Inspection Report

National Dam Safety Program. Water Works Lake Dam (MO 10006), Grand - Chariton River Basin, Randolph County, Missouri. Phase I Inspection Report PDF Author: Walter G. Shifrin
Publisher:
ISBN:
Category :
Languages : en
Pages : 91

Book Description
This report was prepared under the National Program of Inspection of Non-Federal Dams. This report assesses the general condition of the dam with respect to safety, based on available data and on visual inspection, to determine if the dam poses hazards to human life or property. (Author).

National Dam Safety Program. Brookfield City Dam (MO 10181), Grand - Chariton River Basin, Linn County, Missouri. Phase I Inspection Report

National Dam Safety Program. Brookfield City Dam (MO 10181), Grand - Chariton River Basin, Linn County, Missouri. Phase I Inspection Report PDF Author: Walter G. Shifrin
Publisher:
ISBN:
Category :
Languages : en
Pages : 101

Book Description
This report was prepared under the National Program of Inspection of Non-Federal Dams. This report assesses the general condition of the dam with respect to safety, based on available data and on visual inspection, to determine if the dam poses hazards to human life or property. (Author).

National Dam Safety Program. Elmwood City Lake Dam (MO 10240), Grand - Chariton River Basin, Sullivan County, Missouri. Phase I Inspection Report

National Dam Safety Program. Elmwood City Lake Dam (MO 10240), Grand - Chariton River Basin, Sullivan County, Missouri. Phase I Inspection Report PDF Author: Walter G. Shifrin
Publisher:
ISBN:
Category :
Languages : en
Pages : 111

Book Description
This report was prepared under the National Program of Inspection of Non-Federal Dams. This report assesses the general condition of the dam with respect to safety, based on available data and on visual inspection, to determine if the dam poses hazards to human life or property. (Author).

National Dam Safety Program. New Cambria Lake Dam (MO 10387), Grand - Chariton River Basin, Macon County, Missouri. Phase 1 Inspection Report

National Dam Safety Program. New Cambria Lake Dam (MO 10387), Grand - Chariton River Basin, Macon County, Missouri. Phase 1 Inspection Report PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 82

Book Description
This report was prepared under the National Program of Inspection of Non-Federal Dams. This report assesses the general condition of the dam with respect to safety, based on available data and on visual inspection, to determine if the dam poses hazards to human life or property.

River Aux Vases Basin, Lake Kal-Tatri, Ste. Genevieve County, Missouri, Phase I Inspection Report, National Dam Safety Program

River Aux Vases Basin, Lake Kal-Tatri, Ste. Genevieve County, Missouri, Phase I Inspection Report, National Dam Safety Program PDF Author: United States. Army. Corps of Engineers. St. Louis District
Publisher:
ISBN:
Category : Dams
Languages : en
Pages : 70

Book Description


National Dam Safety Program. Rothwell Lake Dam (MO 10004), Grand - Chariton River Basin, Randolph County, Missouri. Phase I Inspection Report

National Dam Safety Program. Rothwell Lake Dam (MO 10004), Grand - Chariton River Basin, Randolph County, Missouri. Phase I Inspection Report PDF Author: Walter G. Shifrin
Publisher:
ISBN:
Category :
Languages : en
Pages : 86

Book Description
The overall structural safety of the dam is not up to acceptable standards in view of needed repairs to the downstream slope. While the condition does not appear to jeopardize the safety of the dam under normal operating conditions, particularly in view of its performance since the 1967 overtopping incident, it does pose a relatively high hazard. While the dam does not exhibit signs of structural instability, prompt action should, nevertheless, be taken to repair the damage. Based on the criteria in the guidelines, the dam is in the high hazard potential classification, which means that loss of life and appreciable property loss could occur in the event of failure of the dam. Our inspection and evaluation indicates that the spillway of Rothwell Lake Dam does not meet the criteria set forth in the guidelines for a dam having the above size and hazard potential. Since there is high hazard potential downstream of the dam, the appropriate spillway design flood for this dam is the Probable Maximum Flood. It was determined that the reservoir/spillway system can accommodate 20 percent of the Probable Maximum Flood without overtopping the dam. Our evaluation indicates that he reservoir/spillway system will accommodate the 100-year flood without overtopping.