Final Report for Central North Dakota Water Supply Project Alternative Study PDF Download

Are you looking for read ebook online? Search for your book and save it on your Kindle device, PC, phones or tablets. Download Final Report for Central North Dakota Water Supply Project Alternative Study PDF full book. Access full book title Final Report for Central North Dakota Water Supply Project Alternative Study by . Download full books in PDF and EPUB format.

Final Report for Central North Dakota Water Supply Project Alternative Study

Final Report for Central North Dakota Water Supply Project Alternative Study PDF Author:
Publisher:
ISBN:
Category : Industrial water supply
Languages : en
Pages : 125

Book Description
The Central North Dakota Water Supply Project (Project) Alternative Study (Study) is an evaluation of alternatives to supply Missouri River water to potential municipal, rural, and industrial (MR&I) users, and to irrigation users in the central North Dakota region. CHS Inc., owner of a planned fertilizer manufacturing plant to be located in Spiritwood, North Dakota (ND) (CHS Spiritwood facility), approximately 10 miles east of Jamestown, ND, has expressed interest in obtaining a reliable water supply from the Missouri River. The Study examines 15 alternatives that combine the near-term water supply needs of the CHS Spiritwood facility with other potential needs in central North Dakota. Study alternatives vary with regard to their water supply needs, water sources and locations, alignments, lengths, and environmental permitting requirements. The overall goal of the Study is to assist the State of North Dakota in selection of a water source and pipeline alignment that can be designed, permitted, and constructed as soon as practicable, but no later than 2023, to meet the water supply needs of the CHS Spiritwood facility and other users.