Final Engineering Evaluation/cost Analysis for Operable Unit 2, Sites WP07, SS21 Non-source Area Seeps and Springs for Hill Air Force Base, Utah PDF Download

Are you looking for read ebook online? Search for your book and save it on your Kindle device, PC, phones or tablets. Download Final Engineering Evaluation/cost Analysis for Operable Unit 2, Sites WP07, SS21 Non-source Area Seeps and Springs for Hill Air Force Base, Utah PDF full book. Access full book title Final Engineering Evaluation/cost Analysis for Operable Unit 2, Sites WP07, SS21 Non-source Area Seeps and Springs for Hill Air Force Base, Utah by Radian Corporation. Download full books in PDF and EPUB format.

Final Engineering Evaluation/cost Analysis for Operable Unit 2, Sites WP07, SS21 Non-source Area Seeps and Springs for Hill Air Force Base, Utah

Final Engineering Evaluation/cost Analysis for Operable Unit 2, Sites WP07, SS21 Non-source Area Seeps and Springs for Hill Air Force Base, Utah PDF Author: Radian Corporation
Publisher:
ISBN:
Category : Hazardous waste sites
Languages : en
Pages :

Book Description


Final Engineering Evaluation/cost Analysis for Operable Unit 2, Sites WP07, SS21 Non-source Area Seeps and Springs for Hill Air Force Base, Utah

Final Engineering Evaluation/cost Analysis for Operable Unit 2, Sites WP07, SS21 Non-source Area Seeps and Springs for Hill Air Force Base, Utah PDF Author: Radian Corporation
Publisher:
ISBN:
Category : Hazardous waste sites
Languages : en
Pages :

Book Description


Final Engineering Evaluation/cost Analysis Operable Unit 6 Hill Air Force Base, Utah

Final Engineering Evaluation/cost Analysis Operable Unit 6 Hill Air Force Base, Utah PDF Author: Steve Hicken
Publisher:
ISBN:
Category : Hazardous waste sites
Languages : en
Pages :

Book Description


Engineering Evaluation/cost Analysis Operable Unit 5 Hill Air Force Base, Utah

Engineering Evaluation/cost Analysis Operable Unit 5 Hill Air Force Base, Utah PDF Author: Hill Air Force Base (Utah). Environmental Management Directorate
Publisher:
ISBN:
Category : Hazardous waste sites
Languages : en
Pages :

Book Description


Proposed Final

Proposed Final PDF Author:
Publisher:
ISBN:
Category : Hazardous waste sites
Languages : en
Pages :

Book Description


Final

Final PDF Author: Sheryl Faust-Beck
Publisher:
ISBN:
Category : Hazardous waste sites
Languages : en
Pages :

Book Description


Feasibility Study Report for Operable Unit 2 Sites WP07, SS21

Feasibility Study Report for Operable Unit 2 Sites WP07, SS21 PDF Author: Donald Aide
Publisher:
ISBN:
Category : Hazardous waste sites
Languages : en
Pages :

Book Description


Work Plan for an Engineering Evaluation/Cost Analysis for Hill Air Force Base, Ogden, Utah

Work Plan for an Engineering Evaluation/Cost Analysis for Hill Air Force Base, Ogden, Utah PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 95

Book Description
This work plan was prepared by Engineering-Science, Inc. (ES) and presents the scope of work required for the collection of data necessary to conduct an engineering evaluation/cost analysis (EB/CA) for remediation of fuel hydrocarbon-contaminated ground water at underground storage tank (UST) Site 870, Hill Air Force Base (AFB), Utah. Several remedial options will be evaluated during the EE/CA, including free product removal; ground water extraction, treatment, and reinjection (i.e., pump and treat); air sparging; and natural contaminant attenuation with long-term monitoring. All hydrogeologic and ground water chemical data necessary to evaluate the various remedial options will be collected under this program; however, this work plan is oriented toward the collection of hydrogeologic data to be used as input into the Bioplume II ground water model in support of the natural attenuation (intrinsic remediation) with long-term monitoring remedial option for restoration of fuel hydrocarbon-contaminated ground water.

Intrinsic Remediation Engineering Evaluation/Cost Analysis for UST Site 870. Hill Air Force Base, Ogden, Utah

Intrinsic Remediation Engineering Evaluation/Cost Analysis for UST Site 870. Hill Air Force Base, Ogden, Utah PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 0

Book Description
This report presents the results of an engineering evaluation/cost analysis (EE/CA) performed by Parsons Engineering Science, Inc. (Parsons ES) (formerly known as Engineering-Science, Inc. (ES)) at Hill Air Force Base, Utah to evaluate the use of intrinsic remediation (natural attenuation) with long-term monitoring as a remedial option for dissolved-phase benzene, toluene, ethylbenzene, and xylene (BTEX) contamination in the shallow saturated zone near underground storage tank (UST) Site 870. Soil and ground water contamination is known to occur at the site, with contamination being present in the dissolved and gaseous phases, and as light nonaqueous phase liquid (LNAPL). This study focused on the impact of dissolved-phase BTEX on the shallow ground water system at the site. Site history and the results of soil and ground water investigations conducted previously are also summarized in this report.

Final Environmental Assessment for Operable Unit 5 (sites SS17, SD16) Hill Air Force Base, Utah

Final Environmental Assessment for Operable Unit 5 (sites SS17, SD16) Hill Air Force Base, Utah PDF Author:
Publisher:
ISBN:
Category : Hazardous waste sites
Languages : en
Pages :

Book Description


Final

Final PDF Author: Barbara Smith-Townsend
Publisher:
ISBN:
Category : Hazardous waste sites
Languages : en
Pages :

Book Description