Evaluation of Work Zone Speed Limit Signs with Strobe Lights PDF Download

Are you looking for read ebook online? Search for your book and save it on your Kindle device, PC, phones or tablets. Download Evaluation of Work Zone Speed Limit Signs with Strobe Lights PDF full book. Access full book title Evaluation of Work Zone Speed Limit Signs with Strobe Lights by R. F. Benekohal. Download full books in PDF and EPUB format.

Evaluation of Work Zone Speed Limit Signs with Strobe Lights

Evaluation of Work Zone Speed Limit Signs with Strobe Lights PDF Author: R. F. Benekohal
Publisher:
ISBN:
Category : Roads
Languages : en
Pages : 98

Book Description
The construction zone speed limit sign used in Illinois consists of a regulatory 45 mph speed limit sign augmented with two small strobe lights and two orange colored plates. When the lights are flashing the speed limit is 45 mph. This report contains the findings from evaluation of the effectiveness of the flashing lights in reducing speeds in a rural interstate construction zone. The speed reduction effects on cars and trucks were determined at two locations within the work zone. The results indicated that the average speed of cars was reduced by 1.9-7.1 mph and that of trucks by 1.3-6.0 mph when the strobe lights were flashing. In general, the speed reduction effects were more pronounced on the cars than on the trucks, and at a location past the work space than before it. The reductions at the location past the work space were 2-3 times more than the reductions at the location before the work space. Cars reduced their speeds, on the average, by 1.9 to 4.9 mph before and by 5.9 to 7.1 mph after the work space. Similarly, the speed reduction for trucks was 1.3-2.9 mph before and 3.3-6.0 after the work space. In general, the percentages of vehicles with excessive speeds in the work zone decreased when the lights were flashing.

Evaluation of Work Zone Speed Limit Signs with Strobe Lights

Evaluation of Work Zone Speed Limit Signs with Strobe Lights PDF Author: R. F. Benekohal
Publisher:
ISBN:
Category : Roads
Languages : en
Pages : 98

Book Description
The construction zone speed limit sign used in Illinois consists of a regulatory 45 mph speed limit sign augmented with two small strobe lights and two orange colored plates. When the lights are flashing the speed limit is 45 mph. This report contains the findings from evaluation of the effectiveness of the flashing lights in reducing speeds in a rural interstate construction zone. The speed reduction effects on cars and trucks were determined at two locations within the work zone. The results indicated that the average speed of cars was reduced by 1.9-7.1 mph and that of trucks by 1.3-6.0 mph when the strobe lights were flashing. In general, the speed reduction effects were more pronounced on the cars than on the trucks, and at a location past the work space than before it. The reductions at the location past the work space were 2-3 times more than the reductions at the location before the work space. Cars reduced their speeds, on the average, by 1.9 to 4.9 mph before and by 5.9 to 7.1 mph after the work space. Similarly, the speed reduction for trucks was 1.3-2.9 mph before and 3.3-6.0 after the work space. In general, the percentages of vehicles with excessive speeds in the work zone decreased when the lights were flashing.

Speed Reduction Methods and Studies in Work Zones

Speed Reduction Methods and Studies in Work Zones PDF Author: R. F. Benekohal
Publisher:
ISBN:
Category : Express highways
Languages : en
Pages : 82

Book Description
The objectives of this project were to determine the effectiveness of speed control methods and study traffic behavior in construction zones. This report provides a brief introduction and summary of findings from the following reports which were prepared as part of this study: (1) Evaluation and Summary of Studies in Speed Control Methods in Work Zones. (2) Evaluation of a Radar-Activated Horn System for Speed Control in Highway Maintenance Operations. (3) Survey of Driver's Opinion about Work Zone Traffic Control on a Rural Highway. (4) Speed Reduction Effects of Drone Radar in Rural Interstate Work Zones. (5) Speed Reduction Effects of Changeable Message Signs in a Construction Zone. (6) Effects of Police Presence on Speed in a Highway Work Zone: Circulating Marked Police Car Experiment. (7) Evaluation of Work Zone Speed Limit Signs with Strobe Lights. (8) Speed Reduction Profiles of Vehicles in a Highway Construction zone. Data only for those vehicles in free flow traffic are used for speed reduction evaluation. A vehicle was considered to be in free flow traffic when its time headway was greater than 5 seconds.

Evaluation of Variable Speed Limits in Work Zones

Evaluation of Variable Speed Limits in Work Zones PDF Author: Disapat Lavansiri
Publisher:
ISBN:
Category : Roads
Languages : en
Pages : 312

Book Description


Evaluation of Work Zone Speed Reduction Measures

Evaluation of Work Zone Speed Reduction Measures PDF Author: T. H. Maze
Publisher:
ISBN:
Category : Roads
Languages : en
Pages : 146

Book Description
The Iowa Department of Transportation (DOT) has made improving work zone (WZ) safety a high priority. Managing vehicle speeds through work zones is perceived to be an important factor in achieving this goal. A number of speed reduction techniques are currently used by transportation agencies throughout the country to control speeds and reduce speed variation at work zones. The purpose of this project is to study these and other applicable work zone speed reduction strategies. Furthermore, this research explores transportation agencies' policies regarding managing speeds in long-term, short-term, and moving work zones. This report consists of three chapters. The first chapter, a literature review, examines the current speed reduction practices at work zones and provides a review of the relevant literature. The speed control strategies reviewed in this chapter range from posting regulatory and advisory speed limit signs to using the latest radar technologies to reduce speeds at work zones. The second chapter includes a short write-up for each identified speed control technique. The write-up includes a description, the results of any field tests, the benefits and the costs of the technology or technique. To learn more about other state policies regarding work zone speed reduction and management, the Center for Transportation Research and Education conducted a survey. The survey consists of six multipart questions. The third chapter provides summaries of the response to each question.

Evaluation and Summary of Studies in Speed Control Methods in Work Zones

Evaluation and Summary of Studies in Speed Control Methods in Work Zones PDF Author: R. F. Benekohal
Publisher:
ISBN:
Category : Roads
Languages : en
Pages : 114

Book Description
This report summarizes and evaluates the important findings from the literature review of the studies on work zone speed control techniques. The following treatments are included in this report: 1) flagging, 2) lane width reduction, 3) law enforcement, 4) changeable message signs (CMS), 5) rumble strips, and 6) flashing beacons. The effects of the speed control treatments on speed and traffic flow are evaluated based on: A) experiences with treatment, B) effects of treatment on speed, C) effectiveness of treatment, and D) comments about treatment. A brief description of the conditions under which the treatments were applied is provided, and the speed reduction effects of each technique are discussed. A reference matrix was prepared to identify publications related to each type of speed reduction treatment used in work zones.

Speed Control Through Work Zones

Speed Control Through Work Zones PDF Author:
Publisher:
ISBN:
Category : Roads
Languages : en
Pages : 46

Book Description
This report presents the implementation and evaluation of four techniques for improving the effectiveness of speed zoning in construction areas on multi-lane freeways. The techniques are (a) the flagging procedure of the "Manual on Uniform Traffic Control Devices" (MUTCD), (b) the use of the MUTCD flagging procedure as well as motioning motorists to slow and pointing at a nearby speed limit sign with the free hand of the flagger, (c) a marked police car with cruiser lights and radar active, and (d) a uniformed police officer standing to control traffic. Each of the techniques were applied continuously on six-lane freeways for a period of 10-15 days.

Improving Night Work Zone Traffic Control

Improving Night Work Zone Traffic Control PDF Author: Benjamin H. Cottrell
Publisher:
ISBN:
Category : Automobile driving at night
Languages : en
Pages : 32

Book Description
The objective of this study was to examine traffic control for night work zones from the perspective of both agencies and motorists. This was accomplished by investigating practices of state departments of transportation, identifying the problems associated with traffic control for night work zones, and identifying potential strategies to resolve them. Reduced visibility, driver impairment or inattention, inadequate lighting, and difficulty in maintaining traffic control devices are common problems identified with night work zones based on surveys of state departments of transportation and residencies within the Virginia Department of Transportation. Having police present, making workers more visible, using drums in the taper, maintaining traffic control devices, and providing adequate lighting were common solutions. Based on the review of work zones, traffic control for night work zones is generally adequate. Common problem areas were properly establishing work zones based in accordance with the Virginia Work Area Protection Manual, maintaining the traffic control devices, and properly aiming and aligning lighting to avoid glare. Although there is a perception that night work zones are less safe than daytime work zones, evidence to substantiate this perception, such as higher accident rates, was not available because of a lack of accurate traffic exposure data. Based on a limited amount of data, there was no evidence of the perceived higher speeds at night.

Roadside Design Guide

Roadside Design Guide PDF Author: American Association of State Highway and Transportation Officials. Task Force for Roadside Safety
Publisher:
ISBN:
Category : Roads
Languages : en
Pages : 560

Book Description


Better Management of Speed Control in Work Zones

Better Management of Speed Control in Work Zones PDF Author:
Publisher:
ISBN:
Category : Road work zones
Languages : en
Pages : 116

Book Description
Statistics from the South Carolina Department of Transportation (SCDOT) for incidents between 1998 and 2002 reveal that a leading cause of crashes in work zones is driving too fast for conditions. In April 2005, a team of researchers led by Clemson University Transportation Systems Laboratory embarked on research to better manage speed control in work zones. The research tasks included field trials of several devices, a literature review, and a survey of states. Based on the literature review and meetings with the project steering committee, a number of devices and strategies were selected for field evaluation. The selected devices included drone radar, changeable message sign with radar (CMR), a speed monitoring display (SMD) with CMS, portable rumble strips, and a novel speed activated sign designed by the researchers. Each of the devices had to be acquired and/or developed for this project and preliminary testing was conducted to identify an acceptable configuration for actual data collection. After the initial testing, field surveillance of the speed management devices at a variety of different work zone sites on interstates and state route highways in South Carolina was completed to collect the empirical data needed for evaluation. Both quantitative and qualitative analyses of the performance of the devices and strategies were completed. Some of the devices were also studied in combination with police enforcement. The results of the analysis show that all of the speed control devices studied during this project has the capability of lowering speeds. This report summarizes the findings of this research and provides several recommendations in choosing a speed control device for a particular work zone application.

Evaluation of Work Zone Speed Limits

Evaluation of Work Zone Speed Limits PDF Author: Ghulam H. Bham
Publisher:
ISBN:
Category : Interstate 44
Languages : en
Pages : 0

Book Description