Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 49
Book Description
This Engineering Evaluation/Cost Analysis (EE/CA) has been developed by the U.S. Air Force for the Million Gallon Hill source area of the West Unit (IRP Site STOO9) at Galena Airport, Alaska in response to the presence of contaminated soils and the existence of free phase hydrocarbons floating on the groundwater. Four alternate non-time critical removal actions were evaluated for the Million Gallon Hill source area. These were: (1) No action; (2) Product recovery and soil bioventing; (3) Containment; and (4) Product recovery, soil excavation, and treatment. All four alternatives were evaluated on the basis of effectiveness, implementability, and cost. The second alternative, product recovery and soil bioventing, was found to be most feasible in terms of effectiveness, implementability, and cost. (MM).
Engineering Evaluation/Cost Analysis Million Gallon Hill Source Area of the West Unit Galena Airport, Alaska
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 49
Book Description
This Engineering Evaluation/Cost Analysis (EE/CA) has been developed by the U.S. Air Force for the Million Gallon Hill source area of the West Unit (IRP Site STOO9) at Galena Airport, Alaska in response to the presence of contaminated soils and the existence of free phase hydrocarbons floating on the groundwater. Four alternate non-time critical removal actions were evaluated for the Million Gallon Hill source area. These were: (1) No action; (2) Product recovery and soil bioventing; (3) Containment; and (4) Product recovery, soil excavation, and treatment. All four alternatives were evaluated on the basis of effectiveness, implementability, and cost. The second alternative, product recovery and soil bioventing, was found to be most feasible in terms of effectiveness, implementability, and cost. (MM).
Publisher:
ISBN:
Category :
Languages : en
Pages : 49
Book Description
This Engineering Evaluation/Cost Analysis (EE/CA) has been developed by the U.S. Air Force for the Million Gallon Hill source area of the West Unit (IRP Site STOO9) at Galena Airport, Alaska in response to the presence of contaminated soils and the existence of free phase hydrocarbons floating on the groundwater. Four alternate non-time critical removal actions were evaluated for the Million Gallon Hill source area. These were: (1) No action; (2) Product recovery and soil bioventing; (3) Containment; and (4) Product recovery, soil excavation, and treatment. All four alternatives were evaluated on the basis of effectiveness, implementability, and cost. The second alternative, product recovery and soil bioventing, was found to be most feasible in terms of effectiveness, implementability, and cost. (MM).
Government Reports Announcements & Index
Engineering Evaluation and Cost Analysis
Author: CH2M HILL (Firm)
Publisher:
ISBN:
Category : Beckemeyer (Ill.)
Languages : en
Pages :
Book Description
Engineering evaluation and cost analysis report presents the results of developing and evaluating nontime-critical response action alternative for the Circle Smelting site in Beckemeyer, Ill. The report will be used by the U.S. Environmental Protection Agency in evaluation of response action alternative for the site in accordance with the Superfund Law.
Publisher:
ISBN:
Category : Beckemeyer (Ill.)
Languages : en
Pages :
Book Description
Engineering evaluation and cost analysis report presents the results of developing and evaluating nontime-critical response action alternative for the Circle Smelting site in Beckemeyer, Ill. The report will be used by the U.S. Environmental Protection Agency in evaluation of response action alternative for the site in accordance with the Superfund Law.
Engineering Evaluation/cost Analysis #1 for the 300 Area
Author: United States. Department of Energy. Richland Operations Office
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description
Der Psalter, In Newe Gesangsweise, und künstliche Reimen gebracht, durch Burcardum Waldis. Mit ieder Psalmen besondern Melodien, und kurtzen Sum̄arien
Engineering Evaluation Cost Analysis, Former Black Hills Army Depot, Igloo, South Dakota
Author: Black Hills Ordnance Depot
Publisher:
ISBN:
Category : Army ordnance facilities
Languages : en
Pages :
Book Description
Publisher:
ISBN:
Category : Army ordnance facilities
Languages : en
Pages :
Book Description
Engineering Evaluation/cost Analysis
Author: Morrison Knudsen Corporation. Environmental Services Division
Publisher:
ISBN:
Category : Smelting furnaces
Languages : en
Pages :
Book Description
Publisher:
ISBN:
Category : Smelting furnaces
Languages : en
Pages :
Book Description
Engineering Evaluation Cost Analysis Report
Author: Chemical Waste Management, Inc. (Fremont, Calif.)
Publisher:
ISBN:
Category : Decontamination (from gases, chemicals, etc.)
Languages : en
Pages :
Book Description
Publisher:
ISBN:
Category : Decontamination (from gases, chemicals, etc.)
Languages : en
Pages :
Book Description
An Evaluation of Ground-water Quality Monitoring in Alaska
Author: Danita L. Maynard
Publisher:
ISBN:
Category : Groundwater
Languages : en
Pages : 48
Book Description
Publisher:
ISBN:
Category : Groundwater
Languages : en
Pages : 48
Book Description
Engineering Evaluation/cost Analysis--groundwater Interim Remedial Action
Author:
Publisher:
ISBN:
Category : Environmental health
Languages : en
Pages : 128
Book Description
Publisher:
ISBN:
Category : Environmental health
Languages : en
Pages : 128
Book Description