Eielson Air Force Base, Alaska, source evaluation report, phase 2 investigation, limited field investigation : final

Eielson Air Force Base, Alaska, source evaluation report, phase 2 investigation, limited field investigation : final PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Book Description


Source Evaluation Report Phase 2 Investigation

Source Evaluation Report Phase 2 Investigation PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 222

Book Description
This report describes the limited field investigation work done to address issues and answer unresolved questions regarding a collection of potential contaminant sources at Eielson Air Force Base (AFB), near Fairbanks, Alaska. These sources were listed in the Eielson AFB Federal Facility Agreement supporting the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) cleanup of the base. The limited field investigation began in 1993 to resolve all remaining technical issues and provide the data and analysis required to evaluate the environmental hazard associated with these sites. The objective of the limited field investigation was to allow the remedial project managers to sort each site into one of three categories: requiring remedial investigation/feasibility study, requiring interim removal action, or requiring no further remedial action.

United States Air Force Environmental Restoration Program, Eielson Air Force Base, Alaska

United States Air Force Environmental Restoration Program, Eielson Air Force Base, Alaska PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Book Description


Field Investigation Source Area ST58 Old Quartermaster Service Station, Eielson Air Force Base, Alaska

Field Investigation Source Area ST58 Old Quartermaster Service Station, Eielson Air Force Base, Alaska PDF Author: Terry L. Liikala
Publisher:
ISBN:
Category :
Languages : en
Pages :

Book Description


Energy Research Abstracts

Energy Research Abstracts PDF Author:
Publisher:
ISBN:
Category : Power resources
Languages : en
Pages : 840

Book Description


Government Reports Announcements & Index

Government Reports Announcements & Index PDF Author:
Publisher:
ISBN:
Category : Government publications
Languages : en
Pages : 634

Book Description


Operable Unit 1 Remedial Investigation Report, Eielson Air Force Base, Alaska

Operable Unit 1 Remedial Investigation Report, Eielson Air Force Base, Alaska PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 513

Book Description
This remedial investigation report for operable Unit 1 (OU-1) at Eielson Air Force Base presents data, calculations, and conclusions as to the nature and extent of surface and subsurface contamination at the eight source areas that make up OU-1. The information is based on the 1993 field investigation result and previous investigations. This report is the first in a set of three for OU-1. The other reports are the baseline risk assessment and feasibility study. The information in these reports will lead to a Record of Decision that will guide and conclude the environmental restoration effort for OU-1 at Eielson Air Force Base. The primary contaminants of concern include fuels and fuel-related contaminants (diesel; benzene, toluene, ethylbenzene, and xylene; total petroleum hydrocarbon; polycyclic aromatic hydrocarbons), maintenance-related solvents and cleaners (volatile chlorinated hydrocarbons such as trichloroothylene), polychlorinated biphenyls, and dichlorodiphenyltrichloroethane (DDT). The origins of contaminants of concern include leaks from storage tanks, drums and piping, and spills. Ongoing operations and past sitewide practices also contribute to contaminants of concern at OU-1 source areas. These include spraying mixed oil and solvent wastes on unpaved roads and aerial spraying of DDT.

ERDA Energy Research Abstracts

ERDA Energy Research Abstracts PDF Author:
Publisher:
ISBN:
Category : Power resources
Languages : en
Pages : 848

Book Description


Draft 1997 Sitewide Monitoring Program Report, Eielson Air Force Base, Alaska

Draft 1997 Sitewide Monitoring Program Report, Eielson Air Force Base, Alaska PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 346

Book Description
Sampling, analysis, and field testing to determine environmental conditions were conducted at Eielson Air Force Base (Eielson AFB) during the 1997 field season as part of the annual Sitewide Monitoring Program (SWMP). The SWMP covers long-term environmental monitoring and restoration of sites at Eielson AFB under the Federal Facilities Agreement (FFA) and other environmental regulations. Environmental samples were collected during the 1997 field season from sites under investigation. The samples were analyzed for selected chemical constituents based on location-specific rationale developed previously, during the Remedial Investigation/Feasibility Study (RI/FS), the Source Evaluation Report (SER) phases, and the 1994, 1995, and 1996 SWMP. The 1997 scope of work was based largely on 1996 SWMP results and consisted of sampling and analyses of groundwater and aquatic biota at several locations on Eielson AFB.

Draft 1997 Sitewide Monitoring Program Report, Eielson Air Force Base, Alaska

Draft 1997 Sitewide Monitoring Program Report, Eielson Air Force Base, Alaska PDF Author: William Robert Bolton
Publisher:
ISBN:
Category :
Languages : en
Pages : 0

Book Description
Sampling, analysis, and field testing to determine environmental conditions were conducted at Eielson Air Force Base (Eielson AFB) during the 1997 field season as part of the annual Sitewide Monitoring Program (SWMP). The SWMP covers long-term environmental monitoring and restoration of sites at Eielson AFB under the Federal Facilities Agreement (FFA) and other environmental regulations. Environmental samples were collected during the 1997 field season from sites under investigation. The samples were analyzed for selected chemical constituents based on location-specific rationale developed previously, during the Remedial Investigation/Feasibility Study (RI/FS), the Source Evaluation Report (SER) phases, and the 1994, 1995, and 1996 SWMP. The 1997 scope of work was based largely on 1996 SWMP results and consisted of sampling and analyses of groundwater and aquatic biota at several locations on Eielson AFB.