Are you looking for read ebook online? Search for your book and save it on your Kindle device, PC, phones or tablets. Download Final Safety Evaluation Report PDF full book. Access full book title Final Safety Evaluation Report by U.s. Nuclear Regulatory Comion. Download full books in PDF and EPUB format.
Author: U.s. Nuclear Regulatory Comion Publisher: CreateSpace ISBN: 9781499623574 Category : Science Languages : en Pages : 442
Book Description
The U.S. Nuclear Regulatory Commission (NRC) regulations in Title 10 of the Code of Federal Regulations (10 CFR) Part 52 include requirements for licensing new nuclear power plants.3 These regulations include the NRC's requirements for early site permit (ESP), design certification, and combined license (COL) applications. The ESP process (10 CFR Part 52, Subpart A, “Early Site Permits”) is intended to address and resolve siting-related issues. The design certification process (10 CFR Part 52, Subpart B, “Standard Design Certifications”) provides a means for a vendor to obtain NRC certification of a particular reactor design. Finally, the COL process (10 CFR Part 52, Subpart C, “Combined Licenses”) allows an applicant to seek authorization to construct and operate a new nuclear power plant. A COL may reference an ESP, a certified design, both, or neither. As part of demonstrating that all applicable NRC requirements are met, a COL applicant referencing an ESP or certified design must demonstrate compliance with any requirements not already resolved as part of the referenced ESP or design certification before the NRC issues that COL.
Author: U.s. Nuclear Regulatory Comion Publisher: CreateSpace ISBN: 9781499623574 Category : Science Languages : en Pages : 442
Book Description
The U.S. Nuclear Regulatory Commission (NRC) regulations in Title 10 of the Code of Federal Regulations (10 CFR) Part 52 include requirements for licensing new nuclear power plants.3 These regulations include the NRC's requirements for early site permit (ESP), design certification, and combined license (COL) applications. The ESP process (10 CFR Part 52, Subpart A, “Early Site Permits”) is intended to address and resolve siting-related issues. The design certification process (10 CFR Part 52, Subpart B, “Standard Design Certifications”) provides a means for a vendor to obtain NRC certification of a particular reactor design. Finally, the COL process (10 CFR Part 52, Subpart C, “Combined Licenses”) allows an applicant to seek authorization to construct and operate a new nuclear power plant. A COL may reference an ESP, a certified design, both, or neither. As part of demonstrating that all applicable NRC requirements are met, a COL applicant referencing an ESP or certified design must demonstrate compliance with any requirements not already resolved as part of the referenced ESP or design certification before the NRC issues that COL.
Author: U.s. Nuclear Reglatory Commission Publisher: CreateSpace ISBN: 9781500203030 Category : Technology & Engineering Languages : en Pages : 498
Book Description
This environmental impact statement (EIS) has been prepared in response to an application submitted to the U.S. Nuclear Regulatory Commission (NRC) by Exelon Generation Company, LLC (Exelon) for an early site permit (ESP). The proposed action requested in Exelon's application is for the NRC to (1) approve a site within the existing Clinton Power Station (CPS) boundaries as suitable for the construction and operation of a new nuclear power generating facility and (2) issue an ESP for the proposed site identified as the Exelon ESP site located adjacent to the CPS. In its application, Exelon proposes a plan for redressing the environmental effects of certain site-preparation and construction activities, i.e., those activities allowed by Title 10 of the Code of Federal Regulations (CFR) 50.10(e)(1), performed by an ESP holder under 10 CFR 52.25. In accordance with the plan, the site would be redressed if the NRC issues the requested ESP (containing the site redress plan), the ESP holder performs these site-preparation and construction activities, the ESP is not referenced in an application for a construction permit or combined operating license, and no alternative use is found for the site. This EIS includes the NRC staff's analysis that considers and weighs the environmental impacts of constructing and operating a new nuclear unit at the Exelon ESP site or at alternative sites, and mitigation measures available for reducing or avoiding adverse impacts. It also includes the staff's recommendation to the Commission regarding the proposed action.
Author: Kristin Shrader-Frechette Publisher: Oxford University Press ISBN: 0199911789 Category : Philosophy Languages : en Pages : 629
Book Description
What Will Work makes a rigorous and compelling case that energy efficiencies and renewable energy-and not nuclear fission or "clean coal"-are the most effective, cheapest, and equitable solutions to the pressing problem of climate change.