Dredged Material Management Plan and Environmental Impact Statement. McNary Reservoir and Lower Snake River Reservoirs. Appendix K: Aquatic Resources

Dredged Material Management Plan and Environmental Impact Statement. McNary Reservoir and Lower Snake River Reservoirs. Appendix K: Aquatic Resources PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 48

Book Description
This final Dredged Material Management Plan/Environmental Impact Statement (DMMP/EIS) presents the Corps of Engineers' programmatic plan for maintenance of the authorized navigation channel and certain publicly owned facilities in the lower Snake River reservoirs between Lewiston, Idaho and the Columbia River, and McNary reservoir on the Columbia River for 20 years; for management of dredged material from these reservoirs; and for maintenance of flow conveyance capacity at the most upstream extent of the Lower Granite reservoir for the remaining economic life of the dam and reservoir project (to year 2074). The Corps, along with the U.S. Environmental Protection Agency, analyzed four alternatives for this Final DMMP/EIS: Alternative 1 - No Action (No Change) - Maintenance Dredging With In-Water Disposal; Alternative 2 - Maintenance Dredging With In-Water Disposal to Create Fish Habitat and a 3-Foot Levee Raise; Alternative 3 - Maintenance Dredging With Upland Disposal and a 3-Foot Levee Raise; and Alternative 4- Maintenance Dredging With Beneficial Use of Dredged Material and a 3-Foot Levee Raise (Recommended Plan/Preferred Alternative).

Dredged Material Management Plan and Environmental Impact Statement--McNary Reservoir and Lower Snake River Reservoirs--Appendix K-Aquatic Resources--Draft--October 2001

Dredged Material Management Plan and Environmental Impact Statement--McNary Reservoir and Lower Snake River Reservoirs--Appendix K-Aquatic Resources--Draft--October 2001 PDF Author: Walla Walla District Corps of Engineers
Publisher:
ISBN:
Category :
Languages : en
Pages :

Book Description


McNary Reservoir and Lower Snake River Reservoirs, Dredged Material Management Plan

McNary Reservoir and Lower Snake River Reservoirs, Dredged Material Management Plan PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 50

Book Description


אדמוני

אדמוני PDF Author: יצחק לבנון
Publisher:
ISBN:
Category :
Languages : en
Pages : 17

Book Description


Dredged Material Management Plan and Environmental Impact Statement--McNary Reservoir and Lower Snake River Reservoirs--Appendix H-Water Quality/Water Resources--Draft--October 2001

Dredged Material Management Plan and Environmental Impact Statement--McNary Reservoir and Lower Snake River Reservoirs--Appendix H-Water Quality/Water Resources--Draft--October 2001 PDF Author: Walla Walla District Corps of Engineers
Publisher:
ISBN:
Category :
Languages : en
Pages :

Book Description


新界大埔坑下蒲村林氏族譜

新界大埔坑下蒲村林氏族譜 PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 590

Book Description


Dredged Material Management Plan and Environmental Impact Statement: McNary Reservoir and Lower Snake River Reservoirs. Appendix D. Upland Disposal Conceptual Design

Dredged Material Management Plan and Environmental Impact Statement: McNary Reservoir and Lower Snake River Reservoirs. Appendix D. Upland Disposal Conceptual Design PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 50

Book Description
This final Dredged Material Management Plan/Environmental Impact Statement (DMMP/EIS) presents the Corps of Engineers programmatic plan for maintenance of the authorized navigation channel and certain publicly owned facilities in the Lower Snake River reservoirs between Lewiston, Idaho and the Columbia River, and McNary reservoir on the Columbia River for 20 years; for management of dredged material from these reservoirs; and for maintenance of flow conveyance capacity at the most upstream extent of the Lower Granite reservoir for the remaining economic life of the dam and reservoir project (to year 2074) The Corps, along with the U.S. Environmental Protection Agency, analyzed four alternatives for this Final DMMP/EIS: Alternative 1 - No Action (No Change) - Maintenance Dredging With In-Water Disposal; Alternative 2- Maintenance Dredging With In-Water Disposal to Create Fish Habitat and a 3-Foot Levee Raise; Alternative 3 - Maintenance Dredging With Upland Disposal and a 3-Foot levee Raise; and Alternative 4 - Maintenance Dredging With Beneficial Use of Dredged Material and a 3-Foot Levee Raise (Recommended Plan/Preferred Alternative).

Dredged Material Management Plan and Environmental Impact Statement. Mcnary Reservoir and Lower Snake River Reservoirs. Appendix B

Dredged Material Management Plan and Environmental Impact Statement. Mcnary Reservoir and Lower Snake River Reservoirs. Appendix B PDF Author:
Publisher:
ISBN: 9781423505167
Category :
Languages : en
Pages : 273

Book Description
This final Dredged Material Management Plan/Environmental Impact Statement (DMMP/EIS) presents the Corps of Engineers' programmatic plan for maintenance of the authorized navigation channel and certain publicly owned facilities in the lower Snake River reservoirs between Lewiston, Idaho and the Columbia River , and McNary reservoir on the Columbia River for 20 years; for management of dredged material from these reservoirs; and for maintenance of flow conveyance - capacity at the most upstream extent of the Lower Granite reservoir for the remaining economic life of the dam and reservoir project (to year 2074). The Corps, along with the U.S. Environmental Protection Agency, analyzed four alternatives for this Final DMMP/EIS: Alternative 1 - No Action (No Change) - Maintenance Dredging With In-Water Disposal; Alternative 2 - Maintenance Dredging With In-Water Disposal to Create Fish Habitat and a 3-Foot Levee Raise; Alternative 3 - Maintenance Dredging With Upland Disposal and a 3- Foot Levee Raise; and Alternative 4 - Maintenance Dredging With Beneficial Use of Dredged Material and a 3-Foot Levee Raise (Recommended Plan/Preferred Alternative).

Dredged Material Management Plan and Environmental Impact Statement. Mcnary Reservoir and Lower Snake River Reservoirs. Appendix C

Dredged Material Management Plan and Environmental Impact Statement. Mcnary Reservoir and Lower Snake River Reservoirs. Appendix C PDF Author:
Publisher:
ISBN: 9781423505075
Category :
Languages : en
Pages : 160

Book Description
This final Dredged Material Management Plan/Enviornmental Impact Statement (DMMP/EIS) presents the Corps of Engineers' programmatic plan for maintenance of the authorized navigation channel and certain publicly owned facilities in the lower Snake River reservoirs between Lewiston, Idaho and the Columbia River, and McNary reservoir on the Columbia River for 20 years; for managment of dredged material from these reservoirs; and for maintenance of flow conveyance capacity at the most upstream extent of the Lower Granite reservoir for the remaining economic life of the dam and reservoir project (to year 2074). The Corps, along with the U.S. Environmental Protection Agency, analyzed four alternatives for this Final DMMP/EIS: ALternative 1 = No Action (No Change) - Maintenance Dredging With In-Water Disposal; Alternative 2 - Maintenance Dredging With In-Water Disposal to Create Fish Habitat and a 3-Foot Levee Raise; Alternative 3 - Maintenance Dredging With Upland Disposal and a 3-Foot Levee Raise; and Alternative 4 - Maintenance Dredging With Beneficial Use of Dredged Material and a 3-Foot Levee Raise (Recommended Plan/Preferred Alternative).

Dredged Material Management Plan and Environmental Impact Statement: McNary Reservoir and Lower Snake River Reservoirs

Dredged Material Management Plan and Environmental Impact Statement: McNary Reservoir and Lower Snake River Reservoirs PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 353

Book Description
This Final DMMP/EIS presents the Corps of Engineers' programmatic plan-for maintenance of the authorized navigation channel in the lower Snake River reservoirs between Lewiston, Idaho, and the Columbia River, and McNary reservoir on the Columbia River for 20 years; for management of dredged material from these reservoirs; and for maintenance of flow conveyance capacity at the most upstream extent of the Lower Granite reservoir for the remaining economic life of the dam and reservoir project (to year 2074). The Corps, along with the U.S. Environmental Protection Agency, analyzed four alternatives for this Final DMMP/EIS: Alternative 1 - No Action (No Change) - Maintenance Dredging With In-Water Disposal, Alternative 2- Maintenance Dredging With In-Water Disposal to Create Fish Habitat and a 3-Foot 0.9-METER (M) Levee Raise, Alternative 3 - Maintenance Dredging With Upland Disposal and a 3-Foot (0.9-m) Levee Raise, and Alternative 4 - Maintenance Dredging With Beneficial Use of Dredged Material and a 3-Foot (0.9-m) Levee Raise (Recommended Plan/Preferred Alternative).