Dredged Material Management Plan and Environmental Impact Statement. McNary Reservoir and Lower Snake River Reservoirs. Appendix B: Cost Estimates PDF Download

Are you looking for read ebook online? Search for your book and save it on your Kindle device, PC, phones or tablets. Download Dredged Material Management Plan and Environmental Impact Statement. McNary Reservoir and Lower Snake River Reservoirs. Appendix B: Cost Estimates PDF full book. Access full book title Dredged Material Management Plan and Environmental Impact Statement. McNary Reservoir and Lower Snake River Reservoirs. Appendix B: Cost Estimates by . Download full books in PDF and EPUB format.

Dredged Material Management Plan and Environmental Impact Statement. McNary Reservoir and Lower Snake River Reservoirs. Appendix B: Cost Estimates

Dredged Material Management Plan and Environmental Impact Statement. McNary Reservoir and Lower Snake River Reservoirs. Appendix B: Cost Estimates PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 273

Book Description
This final Dredged Material Management Plan/Environmental Impact Statement (DMMP/EIS) presents the Corps of Engineers' programmatic plan for maintenance of the authorized navigation channel and certain publicly owned facilities in the lower Snake River reservoirs between Lewiston, Idaho and the Columbia River , and McNary reservoir on the Columbia River for 20 years; for management of dredged material from these reservoirs; and for maintenance of flow conveyance - capacity at the most upstream extent of the Lower Granite reservoir for the remaining economic life of the dam and reservoir project (to year 2074). The Corps, along with the U.S. Environmental Protection Agency, analyzed four alternatives for this Final DMMP/EIS: Alternative 1 - No Action (No Change) - Maintenance Dredging With In-Water Disposal; Alternative 2 - Maintenance Dredging With In-Water Disposal to Create Fish Habitat and a 3-Foot Levee Raise; Alternative 3 - Maintenance Dredging With Upland Disposal and a 3-Foot Levee Raise; and Alternative 4 - Maintenance Dredging With Beneficial Use of Dredged Material and a 3-Foot Levee Raise (Recommended Plan/Preferred Alternative).

Dredged Material Management Plan and Environmental Impact Statement. McNary Reservoir and Lower Snake River Reservoirs. Appendix B: Cost Estimates

Dredged Material Management Plan and Environmental Impact Statement. McNary Reservoir and Lower Snake River Reservoirs. Appendix B: Cost Estimates PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 273

Book Description
This final Dredged Material Management Plan/Environmental Impact Statement (DMMP/EIS) presents the Corps of Engineers' programmatic plan for maintenance of the authorized navigation channel and certain publicly owned facilities in the lower Snake River reservoirs between Lewiston, Idaho and the Columbia River , and McNary reservoir on the Columbia River for 20 years; for management of dredged material from these reservoirs; and for maintenance of flow conveyance - capacity at the most upstream extent of the Lower Granite reservoir for the remaining economic life of the dam and reservoir project (to year 2074). The Corps, along with the U.S. Environmental Protection Agency, analyzed four alternatives for this Final DMMP/EIS: Alternative 1 - No Action (No Change) - Maintenance Dredging With In-Water Disposal; Alternative 2 - Maintenance Dredging With In-Water Disposal to Create Fish Habitat and a 3-Foot Levee Raise; Alternative 3 - Maintenance Dredging With Upland Disposal and a 3-Foot Levee Raise; and Alternative 4 - Maintenance Dredging With Beneficial Use of Dredged Material and a 3-Foot Levee Raise (Recommended Plan/Preferred Alternative).

McNary Reservoir and Lower Snake River Reservoirs, Dredged Material Management Plan

McNary Reservoir and Lower Snake River Reservoirs, Dredged Material Management Plan PDF Author:
Publisher:
ISBN:
Category : Dredging
Languages : en
Pages : 356

Book Description


EIS Cumulative

EIS Cumulative PDF Author:
Publisher:
ISBN:
Category : Environmental impact statements
Languages : en
Pages : 354

Book Description


Dredged Material Management Plan and Environmental Impact Statement. Mcnary Reservoir and Lower Snake River Reservoirs. Appendix O

Dredged Material Management Plan and Environmental Impact Statement. Mcnary Reservoir and Lower Snake River Reservoirs. Appendix O PDF Author:
Publisher:
ISBN: 9781423505235
Category :
Languages : en
Pages : 143

Book Description
This final Dredged Material Management Plan/Environmental Impact Statement (DMMP/EIS) presents the Corps of Engineers' programmatic plan for maintenance of the authorized navigation channel and certain publicly owned facilities in the lower Snake River reservoirs between Lewiston, Idaho and the Columbia River, and McNary reservoir on the Columbia River for 20 years; for management of dredged material from these reservoirs; and for maintenance of flow conveyance capacity at the most upstream extent of the Lower Granite reservoir for the remaining economic life of the darn and reservoir project (to year 2074). The Corps, along with the U.S. Environmental Protection Agency, analyzed four alternatives for this Final DMMP/EIS: Alternative 1 - No Action (No Change) - Maintenance Dredging With In-Water Disposal; Alternative 2 - Maintenance Dredging With In-Water Disposal to Create Fish Habitat and a 3-Foot Levee Raise; Alternative 3 - Maintenance Dredging With Upland Disposal and a 3- Foot Levee Raise; and Alternative 4 - Maintenance Dredging With Beneficial Use 0 Dredged Material and a 3-Foot Levee Raise (Recommended Plan/Preferred Alternative).

Dredged Material Management Plan and Environmental Impact Statement: McNary Reservoir and Lower Snake River Reservoirs

Dredged Material Management Plan and Environmental Impact Statement: McNary Reservoir and Lower Snake River Reservoirs PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 353

Book Description
This Final DMMP/EIS presents the Corps of Engineers' programmatic plan-for maintenance of the authorized navigation channel in the lower Snake River reservoirs between Lewiston, Idaho, and the Columbia River, and McNary reservoir on the Columbia River for 20 years; for management of dredged material from these reservoirs; and for maintenance of flow conveyance capacity at the most upstream extent of the Lower Granite reservoir for the remaining economic life of the dam and reservoir project (to year 2074). The Corps, along with the U.S. Environmental Protection Agency, analyzed four alternatives for this Final DMMP/EIS: Alternative 1 - No Action (No Change) - Maintenance Dredging With In-Water Disposal, Alternative 2- Maintenance Dredging With In-Water Disposal to Create Fish Habitat and a 3-Foot 0.9-METER (M) Levee Raise, Alternative 3 - Maintenance Dredging With Upland Disposal and a 3-Foot (0.9-m) Levee Raise, and Alternative 4 - Maintenance Dredging With Beneficial Use of Dredged Material and a 3-Foot (0.9-m) Levee Raise (Recommended Plan/Preferred Alternative).

Dredged Material Management Plan and Environmental Impact Statement

Dredged Material Management Plan and Environmental Impact Statement PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 14

Book Description


Dredged Material Management Plan and Environmental Impact Statement

Dredged Material Management Plan and Environmental Impact Statement PDF Author:
Publisher:
ISBN: 9781423505211
Category :
Languages : en
Pages : 353

Book Description
This Final DMMP/EIS presents the Corps of Engineers' programmatic plan-for maintenance of the authorized navigation channel in the lower Snake River reservoirs between Lewiston, Idaho, and the Columbia River, and McNary reservoir on the Columbia River for 20 years; for management of dredged material from these reservoirs; and for maintenance of flow conveyance capacity at the most upstream extent of the Lower Granite reservoir for the remaining economic life of the dam and reservoir project (to year 2074). The Corps, along with the U.S. Environmental Protection Agency, analyzed four alternatives for this Final DMMP/EIS: Alternative 1 - No Action (No Change) - Maintenance Dredging With In- Water Disposal, Alternative 2- Maintenance Dredging With In-Water Disposal to Create Fish Habitat and a 3-Foot 0.9-METER (M) Levee Raise, Alternative 3 - Maintenance Dredging With Upland Disposal and a 3-Foot (0.9-m) Levee Raise, and Alternative 4 - Maintenance Dredging With Beneficial Use of Dredged Material and a 3-Foot (0.9-m) Levee Raise (Recommended Plan/Preferred Alternative).

Dredged Material Management Plan and Environmental Impact Statement

Dredged Material Management Plan and Environmental Impact Statement PDF Author:
Publisher:
ISBN: 9781423504863
Category :
Languages : en
Pages : 177

Book Description
This final Dredged Material Management Plan/Environmental Impact Statement (DMMP/EIS) presents the Corps of Engineers programmatic plan for maintenance of the authorized navigation channel and certain publicly owned facilities in the Lower Snake River reservoirs between Lewiston, Idaho and the Columbia River, and McNary reservoir on the Columbia River for 20 years; for management of dredged material from these reservoirs; and for maintenance of flow conveyance capacity at the most upstream extent of the Lower Granite reservoir for the remaining economic life of the dam and reservoir project (to year 2074) The Corps, along with the U.S. Environmental Protection Agency, analyzed four alternatives for this Final DMMP/EIS: Alternative 1 - No Action (No Change) - Maintenance Dredging With In-Water Disposal; Alternative 2- Maintenance Dredging With In-Water Disposal to Create Fish Habitat and a 3-Foot Levee Raise; Alternative 3 - Maintenance Dredging With Upland Disposal and a 3- Foot levee Raise; and Alternative 4 - Maintenance Dredging With Beneficial Use of Dredged Material and a 3-Foot Levee Raise (Recommended Plan/Preferred Alternative).

Fish Passage Technologies

Fish Passage Technologies PDF Author:
Publisher: Office of Technology Assessment
ISBN:
Category : Nature
Languages : en
Pages : 180

Book Description


Controversy, Conflict and Compromise

Controversy, Conflict and Compromise PDF Author: Keith Petersen
Publisher:
ISBN:
Category : Columbia River
Languages : en
Pages : 264

Book Description