Development of an Integrated In-situ Remediation Technology. Draft Topical Report for Task {number_sign}3.3 Entitled, ''Iron Dechlorination Studies'' (September 26, 1994--August 31, 1997). PDF Download

Are you looking for read ebook online? Search for your book and save it on your Kindle device, PC, phones or tablets. Download Development of an Integrated In-situ Remediation Technology. Draft Topical Report for Task {number_sign}3.3 Entitled, ''Iron Dechlorination Studies'' (September 26, 1994--August 31, 1997). PDF full book. Access full book title Development of an Integrated In-situ Remediation Technology. Draft Topical Report for Task {number_sign}3.3 Entitled, ''Iron Dechlorination Studies'' (September 26, 1994--August 31, 1997). by . Download full books in PDF and EPUB format.

Development of an Integrated In-situ Remediation Technology. Draft Topical Report for Task {number_sign}3.3 Entitled, ''Iron Dechlorination Studies'' (September 26, 1994--August 31, 1997).

Development of an Integrated In-situ Remediation Technology. Draft Topical Report for Task {number_sign}3.3 Entitled, ''Iron Dechlorination Studies'' (September 26, 1994--August 31, 1997). PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 27

Book Description
Contamination in low-permeability soils poses a significant technical challenge to in-situ remediation efforts. Poor accessibility to the contaminants and difficulty in delivery of treatment reagents have rendered existing in-situ treatments such as bioremediation, vapor extraction, and pump and treat rather ineffective when applied to low permeability soils present at many contaminated sites. The technology is an integrated in-situ treatment in which established geotechnical methods are used to install degradation zones directly in the contaminated soil and electro-osmosis is utilized to move the contaminants back and forth through those zones until the treatment is completed. The present Topical Report for Task {number_sign}3.3 summarizes the iron dechlorination research conducted by Monsanto Company.

Development of an Integrated In-situ Remediation Technology. Draft Topical Report for Task {number_sign}3.3 Entitled, ''Iron Dechlorination Studies'' (September 26, 1994--August 31, 1997).

Development of an Integrated In-situ Remediation Technology. Draft Topical Report for Task {number_sign}3.3 Entitled, ''Iron Dechlorination Studies'' (September 26, 1994--August 31, 1997). PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 27

Book Description
Contamination in low-permeability soils poses a significant technical challenge to in-situ remediation efforts. Poor accessibility to the contaminants and difficulty in delivery of treatment reagents have rendered existing in-situ treatments such as bioremediation, vapor extraction, and pump and treat rather ineffective when applied to low permeability soils present at many contaminated sites. The technology is an integrated in-situ treatment in which established geotechnical methods are used to install degradation zones directly in the contaminated soil and electro-osmosis is utilized to move the contaminants back and forth through those zones until the treatment is completed. The present Topical Report for Task {number_sign}3.3 summarizes the iron dechlorination research conducted by Monsanto Company.

Development of an Integrated In-situ Remediation Technology. Topical Report for Task {number_sign}3.2 Entitled, ''Modeling and Iron Dechlorination Studies'' (September 26, 1994--August 31, 1997).

Development of an Integrated In-situ Remediation Technology. Topical Report for Task {number_sign}3.2 Entitled, ''Modeling and Iron Dechlorination Studies'' (September 26, 1994--August 31, 1997). PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 72

Book Description
Contamination in low-permeability soils poses a significant technical challenge to in-situ remediation efforts. Poor accessibility to the contaminants and difficulty in delivery of treatment reagents have rendered existing in-situ treatments such as bioremediation, vapor extraction, and pump and treat rather ineffective when applied to low-permeability soils present at many contaminated sites. The technology is an integrated in-situ treatment in which established geotechnical methods are used to install degradation zones directly in the contaminated soil, and electro-osmosis is utilized to move the contaminants back and forth through those zones until the treatment is complete. The present Topical Report for Task {number_sign}3.2 summarizes the modeling and dechlorination research conducted by General Electric Research and Development.

Development of an Integrated, In-situ Remediation Technology. Draft Topical Report for Task No. 9. Part II. Entitled

Development of an Integrated, In-situ Remediation Technology. Draft Topical Report for Task No. 9. Part II. Entitled PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 24

Book Description
Contamination in low permeability soils poses a significant technical challenge to in-situ remediation efforts. Poor accessibility to the contaminants and difficulty in delivery of treatment reagents have rendered existing in-situ treatments such as bioremediation, vapor extraction, pump and treat rather ineffective when applied to low permeability soils present at many contaminated sites. The technology is an integrated in-situ treatment in which established geotechnical methods are used to install degradation zones directly in the contaminated soil and electro-osmosis is utilized to move the contaminants back and forth through those zones until the treatment is completed. The use of zero valence iron for reductive dechlorination of aliphatic chlorinated hydrocarbons is currently under investigation by a number of research groups as a potential method of in-situ treatment of contaminated ground water. The reaction appears to involve the transfer of electrons to chloro-aliphatic compounds by the oxidation of zero valence iron to ferrous iron (Fe{sup +2}). Our studies have indicated that this reaction is consistent with those of corrosion, and as such, can be influenced or increased by the presence of small amounts of metals (5% by weight) such as copper, tin, silver, gold and palladium coated on the iron surface. Incomplete coverage of the iron surface with a more electropositive metal results in an open galvanic cell, which increases the oxidation of iron and facilitates and increases the concurrent reduction of trichloroethylene and other chlorinated aliphatic compounds to the corresponding alkenes and alkanes. Our results show that plating more electropositive metals onto certain iron surfaces results in approximately a factor of ten increase in the dechlorination rate of small organochlorine compounds such as TCE.

Development of an Integrated, In-situ Remediation Technology. Topical Report for Task No. 9. Part I. TCE Degradation Using Nonbiological Methods, September 26, 1994--May 25, 1996

Development of an Integrated, In-situ Remediation Technology. Topical Report for Task No. 9. Part I. TCE Degradation Using Nonbiological Methods, September 26, 1994--May 25, 1996 PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 35

Book Description
Contamination in low-permeability soils poses a significant technical challenge for in situ remediation efforts. Poor accessibility to the contaminants and difficulty in delivery of treatment reagents have rendered existing in situ treatments such as bioremediation, vapor extraction, pump and treat rather ineffective when applied to low-permeability soils present at many contaminated sites. The technology is an integrated in situ treatment in which established geotechnical methods are used to install degradation zones directly in the contaminated soil and electro-osmosis is used to move the contaminants back and forth through those zones until the treatment is completed. The present Draft Topical Report for Task No. 9 summarizes laboratory investigations into TCE degradation using nonbiological methods. These studies were conducted by the General Electric Company. The report concentrates on zero valent iron as the reducing agent and presents data on TCE and daughter product degradation rates in batch experiments, column studies, and electroosmotic cells. It is shown that zero valent iron effectively degrades TCE in electroosmotic experiments. Daughter product degradation and gas generation are shown to be important factors in designing field scale treatment zones for the Lasagna{trademark} process.

Development of an Integrated In-situ Remediation Technology. Topical Report for Task No. 3.1 Entitled, Emplacement Technology - An Evaluation of Phase IIa and Alternative Lasagna{trademark} Emplacement Methods (September 26, 1994 - August 31, 1997).

Development of an Integrated In-situ Remediation Technology. Topical Report for Task No. 3.1 Entitled, Emplacement Technology - An Evaluation of Phase IIa and Alternative Lasagna{trademark} Emplacement Methods (September 26, 1994 - August 31, 1997). PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 5

Book Description


Development of an Integrated In-situ Remediation Technology. Topical Report for Task No. 7 Entitled

Development of an Integrated In-situ Remediation Technology. Topical Report for Task No. 7 Entitled PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 53

Book Description
Contamination in low permeability soils poses a significant technical challenge to in-situ remediation efforts. Poor accessibility to the contaminants and difficulty in delivery of treatment reagents have rendered existing in-situ treatments such as bioremediation, vapor extraction, pump and treat rather ineffective when applied to law permeability soils present at many contaminated sites. The Lasagna technology is an integrated in-situ treatment in which established geotechnical methods are used to install degradation zones directly in the contaminated soil and electro-osmosis is utilized to move the contaminants back and forth through those zones until the treatment is completed. The general concept of the technology is to use electrokinetics to move contaminants from the soils into {open_quotes}treatment zones{close_quotes} where the contaminants can be removed from the water by either adsorption or degradation. The focus of technical task No. 7 was to optimize the conditions required for electro-osmotic movement of contaminants and microbial degradation in the treatment zones. This topical report summarizes the results of aerobic microbial research performed to evaluate the feasibility of incorporating the chemical-degrading organisms into biotreatment zones in laboratory-scale electro-osmosis units and to demonstrate the combination of electrokinetics and aerobic microbial degradation for the removal of contaminants from clay. Also included in this report are the results of investigating microbial movement during electro-osmosis and studies involving the optimization of the microbial support matrix in the biozone. The Stanford study was conducted in order to obtain a better understanding of rates of anaerobic reductive dehalogenation of TCE to ethylene and of factors affecting these rates in order to determine the potential for application of TCE biodegradation as part of the Lasagna technology.

Liechtensteinisches Zivilgesetzbuch

Liechtensteinisches Zivilgesetzbuch PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 127

Book Description


Development of an Integrated, In-situ Remediation Technology. Topical Report for Task No. 6

Development of an Integrated, In-situ Remediation Technology. Topical Report for Task No. 6 PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 21

Book Description
Contamination in low permeability soils poses a significant technical challenge to in situ remediation efforts. Poor accessibility to the contaminants and difficulty in delivery of treatment reagents have rendered existing in situ treatments such as bioremediation, vapor extraction, and pump and treat rather ineffective when applied to low permeability soils present at many contaminated sites. The technology is an integrated in situ treatment in which established geotechnical methods are used to install degradation zones directly in the contaminated soil, and electro-osmosis is utilized to move the contaminants back and forth through those zones until the treatment is completed. The present Topical Report for Task No. 6 summarizes the results of a study of the potential for stimulating microbial reductive dehalogenation as part of the integrated in situ treatment process at the field experiment test site at DOE's Gaseous Diffusion Plant in Paducah, Kentucky. A series of {open_quotes}microcosm bottle tests{close_quotes} were performed on samples of contaminated soil and groundwater taken from the Paducah site and spiked with trichloroethene (TCE). A number of bottles were set up, each spiked with a different carbon source in order to enhance the growth of different microbial subpopulations already present within the indigenous population in the soil. In addition, a series of bottle tests were completed with samples of the granular activated carbon (GAC) treatment zone material retrieved from the test site during the Paducah field experiment. In these tests, the GAC samples were used in place of the soil. Results of the soil-groundwater microcosms yielded a negative indication of the presence of dechlorinating bacteria at the site. However, charcoal (GAC) samples from one location in the test plot exhibited marked dechlorination with conversion of TCE to dichloroethene.

Development of an Integrated In-situ Remediation Technology. Topical Report for Task No. 12 and 13 Entitled

Development of an Integrated In-situ Remediation Technology. Topical Report for Task No. 12 and 13 Entitled PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 139

Book Description
Contamination in low permeability soils poses a significant technical challenge to in-situ remediation efforts. Poor accessibility to the contaminants and difficulty in delivery of treatment reagents have rendered existing in-situ treatments such as bioremediation, vapor extraction, pump and treat rather ineffective when applied to low permeability soils present at many contaminated sites. This technology is an integrated in-situ treatment in which established geotechnical methods are used to instant degradation zones directly in the contaminated soil and electroosmosis is utilized to move the contaminants back and forth through those zones until the treatment is completed. This topical report summarizes the results of the field experiment conducted at the Paducah Gaseous Diffusion Plant in Paducah, KY. The test site covered 15 feet wide by 10 feet across and 15 feet deep with steel panels as electrodes and wickdrains containing granular activated carbon as treatment zone & The electrodes and treatment zones were installed utilizing innovative adaptation of existing emplacement technologies. The unit was operated for four months, flushing TCE by electroosmosis from the soil into the treatment zones where it was trapped by the activated carbon. The scale up from laboratory units to this field scale was very successful with respect to electrical parameters as weft as electroosmotic flow. Soil samples taken throughout the site before and after the test showed over 98% TCE removal, with most samples showing greater than 99% removal.

Development of an Integrated, In-situ Remediation Technology. Topical Report for Task No. 5

Development of an Integrated, In-situ Remediation Technology. Topical Report for Task No. 5 PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 36

Book Description
Contamination in low permeability soils poses a significant technical challenge to in situ remediation efforts. Poor accessibility to the contaminants and difficulty in delivering treatment reagents have rendered existing in situ treatments such as bioremediation, vapor extraction, pump and treat rather ineffective when applied to low permeability soils present at many contaminated sites. The Lasagna{trademark} technology is an integrated in situ treatment in which established geotechnical methods are used to install degradation zones directly into the contaminated soil and electro-osmosis if utilized to move the contaminants back and forth through those zones until the treatment is completed. This topical report presents the results of an engineering evaluation and cost analysis of the vertically configured treatment process completed by the DuPont Company. The cost evaluation was prepared by developing a cost optimization model of the overall treatment process. This model considers various input parameters such as soil properties, depth of contamination, cost for emplacing electrodes and treatment zones, required purge water volume, time constraints to achieve cleanup, and cost of power. Several example cases were run using the cost model to provide representative cost ranges for applying the technology to clean up trichloroethene contamination in clay. These costs are estimated to range from $40 to $95 per cubic yard of soil for a 1-acre site, with cost depending on depth of contamination (cost range valid from 15 to 45 ft), method of electrode/treatment zone emplacement (cost range valid from 15 to 45 ft), method of electrode/treatment zone emplacement (cost range valid for Lasagna{trademark} Phase I emplacement and optimized emplacement techniques), and time available to complete remediation (cost range valid for one- and three-year timeframe).