Final design is more than 85 percent complete on the Fuels and Materials Examination Facility, the facility for post-irradiation examination of the fuels and materials tests irradiated in the FFTF and for fuel process development, experimental test pin fabrication and supporting storage, assay, and analytical chemistry functions. The overall facility is generally described with specific information given on some of the design features. Construction has been initiated and more than 10% of the construction contracts have been awarded on a fixed price basis.
Design and Construction of the Fuels and Materials Examination Facility
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description
Final design is more than 85 percent complete on the Fuels and Materials Examination Facility, the facility for post-irradiation examination of the fuels and materials tests irradiated in the FFTF and for fuel process development, experimental test pin fabrication and supporting storage, assay, and analytical chemistry functions. The overall facility is generally described with specific information given on some of the design features. Construction has been initiated and more than 10% of the construction contracts have been awarded on a fixed price basis.
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description
Final design is more than 85 percent complete on the Fuels and Materials Examination Facility, the facility for post-irradiation examination of the fuels and materials tests irradiated in the FFTF and for fuel process development, experimental test pin fabrication and supporting storage, assay, and analytical chemistry functions. The overall facility is generally described with specific information given on some of the design features. Construction has been initiated and more than 10% of the construction contracts have been awarded on a fixed price basis.
Evaluation of the Status of the Fast Flux Test Facility Program
Author: United States. General Accounting Office
Publisher:
ISBN:
Category : Fast Flux Test Facility Program
Languages : en
Pages : 52
Book Description
Publisher:
ISBN:
Category : Fast Flux Test Facility Program
Languages : en
Pages : 52
Book Description
1978 ERDA Authorization
Author: United States. Congress. House. Committee on Science and Technology
Publisher:
ISBN:
Category : Fossil fuels
Languages : en
Pages : 1406
Book Description
Publisher:
ISBN:
Category : Fossil fuels
Languages : en
Pages : 1406
Book Description
1978 ERDA Authorization: February 22, 1977
Author: United States. Congress. House. Committee on Science and Technology. Subcommittee on Fossil and Nuclear Energy Research, Development, and Demonstration
Publisher:
ISBN:
Category : Power resources
Languages : en
Pages : 1408
Book Description
Publisher:
ISBN:
Category : Power resources
Languages : en
Pages : 1408
Book Description
1978 ERDA Authorization
Author: United States. Congress. House. Committee on Science and Technology. Subcommittee on Fossil and Nuclear Energy Research, Development, and Demonstration
Publisher:
ISBN:
Category : Power resources
Languages : en
Pages : 1632
Book Description
Publisher:
ISBN:
Category : Power resources
Languages : en
Pages : 1632
Book Description
The Design and Construction of the EBR-II Initial Fuel Loading Facility
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description
The need for the first core for EBR-11 resulted in the design and construction of the Initial Fuel Loading Facility for this reactor. The plant was built to provide the required initial loading, to train personnel, and to test prototype equipment for the remote reprocessing of fuel materials in the EBR- II Fuel Cycle Facility. The facilities include: remotely manipulated melting, casting, and pin processing equipment, a degreaser, hoods and their atmospheric control system, a gas-purification system, fuelelement-assembly equipment, mold- preparation and balance room, bonding furnaces, a maintenance shop, and a change area. (auth).
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description
The need for the first core for EBR-11 resulted in the design and construction of the Initial Fuel Loading Facility for this reactor. The plant was built to provide the required initial loading, to train personnel, and to test prototype equipment for the remote reprocessing of fuel materials in the EBR- II Fuel Cycle Facility. The facilities include: remotely manipulated melting, casting, and pin processing equipment, a degreaser, hoods and their atmospheric control system, a gas-purification system, fuelelement-assembly equipment, mold- preparation and balance room, bonding furnaces, a maintenance shop, and a change area. (auth).
Design, Construction, and Operation of Engineering Test Reactor
Author:
Publisher:
ISBN:
Category : Engineering test reactors
Languages : en
Pages : 110
Book Description
Publisher:
ISBN:
Category : Engineering test reactors
Languages : en
Pages : 110
Book Description
Report to the Congress: Problems in Developing the Atomic Energy Commission's Fast Flux Test Facility
Author: United States. General Accounting Office
Publisher:
ISBN:
Category :
Languages : en
Pages : 72
Book Description
Publisher:
ISBN:
Category :
Languages : en
Pages : 72
Book Description
Proceedings of the Conference on Hot Laboratories and Equipment
Author:
Publisher:
ISBN:
Category : Hot laboratories (Radioactive substances)
Languages : en
Pages : 544
Book Description
Publisher:
ISBN:
Category : Hot laboratories (Radioactive substances)
Languages : en
Pages : 544
Book Description
The Design and Construction of the EBR-II Initial Fuel Loading Facility
Author: James E. Ayer
Publisher:
ISBN:
Category : Nuclear power plants
Languages : en
Pages : 50
Book Description
The need for the first core for EBR-II resulted in the design and construction of the Initial Fuel Loading Facility for this reactor. The plant was built to provide the required initial loading, to train personnel, and to test prototype equipment for the remote reprocessing of fuel materials in the EBR- II Fuel Cycle Facility. The facilities include: remotely manipulated melting, casting, and pin processing equipment, a degreaser, hoods and their atmospheric control system, a gas-purification system, fuel-element-assembly equipment, mold- preparation and balance room, bonding furnaces, a maintenance shop, and a change area.
Publisher:
ISBN:
Category : Nuclear power plants
Languages : en
Pages : 50
Book Description
The need for the first core for EBR-II resulted in the design and construction of the Initial Fuel Loading Facility for this reactor. The plant was built to provide the required initial loading, to train personnel, and to test prototype equipment for the remote reprocessing of fuel materials in the EBR- II Fuel Cycle Facility. The facilities include: remotely manipulated melting, casting, and pin processing equipment, a degreaser, hoods and their atmospheric control system, a gas-purification system, fuel-element-assembly equipment, mold- preparation and balance room, bonding furnaces, a maintenance shop, and a change area.