Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 20
Book Description
Deshong Substation and 230 KV Transmission Line, Snellville to Deshong, Gwinnett County, Environmental Assessment (EA)-Finding of No Significant Impact (FONSI).
Federal Register
230 KV International Transmission Line, San Diego County, California to Tijuana, Mexico, San Diego Gas & Electric Company
Author:
Publisher:
ISBN:
Category : Environmental impact analysis
Languages : en
Pages : 126
Book Description
Publisher:
ISBN:
Category : Environmental impact analysis
Languages : en
Pages : 126
Book Description
Sidney-North Yuma 230-kV Transmission Line Project, Colorado and Nebraska
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 212
Book Description
This report describes the need for a 230-kV overhead transmission line to supply power from Sidney, Nebraska to eastern Colorado. The alternative scenario compared to construction of the line is No Action. Rejected alternatives include underground lines and different routing paths, with a possible extension to the Sterling area. Both scenarios are evaluated for environmental effects, cost, and consequences for the eastern Colorado region. The proposed route is determined to be the environmentally preferred choice. 120 refs., 6 figs., 13 tabs. (MHB).
Publisher:
ISBN:
Category :
Languages : en
Pages : 212
Book Description
This report describes the need for a 230-kV overhead transmission line to supply power from Sidney, Nebraska to eastern Colorado. The alternative scenario compared to construction of the line is No Action. Rejected alternatives include underground lines and different routing paths, with a possible extension to the Sterling area. Both scenarios are evaluated for environmental effects, cost, and consequences for the eastern Colorado region. The proposed route is determined to be the environmentally preferred choice. 120 refs., 6 figs., 13 tabs. (MHB).