Cumulative Biological Impacts Framework for Solar Energy Projects in the California Desert PDF Download

Are you looking for read ebook online? Search for your book and save it on your Kindle device, PC, phones or tablets. Download Cumulative Biological Impacts Framework for Solar Energy Projects in the California Desert PDF full book. Access full book title Cumulative Biological Impacts Framework for Solar Energy Projects in the California Desert by Frank W. Davis. Download full books in PDF and EPUB format.

Cumulative Biological Impacts Framework for Solar Energy Projects in the California Desert

Cumulative Biological Impacts Framework for Solar Energy Projects in the California Desert PDF Author: Frank W. Davis
Publisher:
ISBN:
Category : Desert ecology
Languages : en
Pages : 102

Book Description


Cumulative Biological Impacts Framework for Solar Energy Projects in the California Desert

Cumulative Biological Impacts Framework for Solar Energy Projects in the California Desert PDF Author: Frank W. Davis
Publisher:
ISBN:
Category : Desert ecology
Languages : en
Pages : 102

Book Description


Providing Best Available Science for Planning for Renewable Energy and Conservation in California's Deserts

Providing Best Available Science for Planning for Renewable Energy and Conservation in California's Deserts PDF Author:
Publisher:
ISBN:
Category : Conservation of natural resources
Languages : en
Pages : 24

Book Description


California Desert Conservation Area Plan Amendment for the Proposed Chevron Energy Solutions Lucerne Valley Solar Project

California Desert Conservation Area Plan Amendment for the Proposed Chevron Energy Solutions Lucerne Valley Solar Project PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 514

Book Description


Desert Harvest Solar Project

Desert Harvest Solar Project PDF Author: United States. Bureau of Land Management. Palm Springs Field Office
Publisher:
ISBN:
Category : California Desert National Conservation Area (Calif.)
Languages : en
Pages :

Book Description
This Environmental Impact Statement addresses the U.S. Bureau of Land Managements (BLM) consideration of issuance of a right-of-way grant to EDF Renewable Energy for the construction, operation, maintenance, and decommissioning of a 150- megawatt photovoltaic solar energy facility and generation-intertie transmission line (gen-tie line). The project would be located in Riverside County, California, near the unincorporated community of Desert Center on land administered by the BLM. The Environmental Impact Statement analyzes seven solar facility alternatives and five gen-tie line alternatives. The solar facility alternatives are designated as follows: (1) No Action (No Plan Amend-ment), in which the application would be denied and current management of the site would be maintained; (2) the application would be denied and the CDCA Plan would be amended to declare the site suitable for solar energy development; (3) the application would be denied and the CDCA Plan would be amended to declare the site unsuitable for solar energy development; (4) BLM would grant the Applicant a right-of-way (ROW) for the project as proposed; (5) BLM would grant the Applicant a ROW for the project excluding the 47-acre portion of the site that is within the Palen-Ford Wildlife Habitat Management Area; (6) BLM would grant the Applicant a ROW for the project excluding the 155-acre southern parcel of the project and a 9-acre portion of the northern parcel that contains a sensitive plant species; (7) BLM would grant the Applicant a ROW as described under Alternative 6, but with taller solar panels. Gen-tie alternatives are designated as follows: (A) No Gen-Tie, in which the gen-tie line would not be constructed and current management of the site would be maintained; (B) The gen-tie line would be approved and would share transmission towers with the approved Desert Sunlight Solar Farm (DSSF); (C) The gen-tie line would be constructed on separate towers parallel to DSSF towers; (D) The gen-tie line would be constructed in a different, slightly shorter alignment; (E) The gen-tie line would be constructed in a different, slightly shorter alignment on a larger proportion of BLM land than Alternative D. Alternatives 4 through 7 and B through E would require an amendment to the CDCA Plan to find the project area suitable for solar development and allow a high-voltage transmission line outside of a federally designated utility corridor. The proposed project or any of the action alternatives is anticipated to result in substantial adverse effects to air resources from emissions of particulate matter (PM10), volatile organic compounds (VOC), carbon monoxide (CO), and oxides of nitrogen (NOx); substantial adverse effects to biological resources, including vegetation habitat, special-status plants, habitat fragmentation, and displacement of wildlife; adverse effects to historic properties; substantial adverse cumulative effects to lands and realty from large-scale land conversion; substantial adverse noise effects from an increase in traffic-related noise levels along Kaiser Road; and substantial adverse effects to visual resources and recreation, due to degradation of the visual character of the landscape.

Carbon Balance in California Deserts

Carbon Balance in California Deserts PDF Author: Michael F. Allen
Publisher:
ISBN:
Category : Carbon sequestration
Languages : en
Pages : 38

Book Description


Desert Sunlight Solar Farm Project, California Desert Conservation Area Plan Amendment and Final Environmental Impact Statement

Desert Sunlight Solar Farm Project, California Desert Conservation Area Plan Amendment and Final Environmental Impact Statement PDF Author:
Publisher:
ISBN:
Category : California Desert National Conservation Area (Calif.)
Languages : en
Pages : 0

Book Description
This Plan Amendment/Final Environmental Impact Statement (PA/FEIS) addresses the possible United States Bureau of Land Management (BLM) approval of an amendment to the California Desert Conservation Area Plan (CDCA Plan) to allow for solar energy and of a right-of-way (ROW) grant to lease land managed by the BLM for construction, operation and decommissioning of a solar photovoltaic energy generation facility. The Agency Preferred Alternative covers approximately 4,176 acres (ac), managed by the BLM, and would generate 550 megawatts (MW) of electricity annually. The PA/FEIS identifies impacts of the Agency Preferred Alternative, including impacts related to biological resources, cultural resources, land use, visual resources, hydrology, water quality, and water use.

Genesis Solar Energy Project, Application for Certification, Riverside County

Genesis Solar Energy Project, Application for Certification, Riverside County PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 468

Book Description


Integrated Energy Policy Report

Integrated Energy Policy Report PDF Author: California Energy Commission. Integrated Energy Policy Report Committee
Publisher:
ISBN:
Category : Energy conservation
Languages : en
Pages : 322

Book Description


Final Environmental Impact Statement Imperial Valley Solar Project

Final Environmental Impact Statement Imperial Valley Solar Project PDF Author: United States. Bureau of Land Management. El Centro Field Office
Publisher:
ISBN:
Category : Electric power transmission
Languages : en
Pages :

Book Description
This Final Environmental Impact Statement (FEIS) addresses the possible United States Bureau of Land Management (BLM) approval of an amendment to the California Desert Conservation Area Plan (CDCA Plan) to allow for solar energy and of a right-of-way (ROW) grant to lease land managed by the BLM for construction and operation of a solar electricity generation facility. The Agency Preferred Alternative covers approximately 6,144 acres (ac), managed by the BLM, and would generate 709 megawatts (MW) of electricity annually. The FEIS identifies impacts of the Agency Preferred Alternative, including impacts related to biological resources, cultural resources, land use, visual resources, and hydrology, water quality, and water use. Many of these adverse impacts can be avoided or substantially reduced based on compliance with applicable laws, ordinances, regulations and standards, and compliance with measures provided in this FEIS.

Blythe Solar Power Project, Application for Certification

Blythe Solar Power Project, Application for Certification PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 534

Book Description