Author: Anthony E. Martinez
Publisher:
ISBN:
Category : Archaeological surveying
Languages : en
Pages :
Book Description
Cultural Resource Survey of the Proposed Dynegy Energy Plant, Santa Teresa, Doña Ana County, New Mexico
Author: Anthony E. Martinez
Publisher:
ISBN:
Category : Archaeological surveying
Languages : en
Pages :
Book Description
Publisher:
ISBN:
Category : Archaeological surveying
Languages : en
Pages :
Book Description
A Cultural Resource Survey for the Proposed Sunland Park Drive Extension Project, Dona Ana County, New Mexico and El Paso County, Texas
Author: Michael P. Marshall
Publisher:
ISBN:
Category : Archaeological surveying
Languages : en
Pages : 26
Book Description
Publisher:
ISBN:
Category : Archaeological surveying
Languages : en
Pages : 26
Book Description
A Cultural Resource Survey for the Proposed Anthony I-10 Frontage Road Improvement Project in Dona Ana County, New Mexico and El Paso County, Texas
Author: Michael P. Marshall
Publisher:
ISBN:
Category : Archaeological surveying
Languages : en
Pages : 18
Book Description
Publisher:
ISBN:
Category : Archaeological surveying
Languages : en
Pages : 18
Book Description
An Archaeological Survey of 24 Acres for a Proposed Power Line from Range 47 to Ranges 48 and 49, Dona Ana Range, Fort Bliss, Dona Ana County, New Mexico
Author: Chris Lowry
Publisher:
ISBN:
Category : Archaeological surveying
Languages : en
Pages : 60
Book Description
Between February 27 and March 7, 2008, archaeologists from the Fort Bliss Directorate of Public Works - Environment conducted a pedestrian survey of 24 acres for a proposed power line running from Range 47 to Range 48 and 49, Dona Ana Range, New Mexico. The APE is a 15 m wide by 6.4 mile long corridor that runs along an existing dirt road. The APE will have poles installed along the length of the corridor using a drilling rig. Areas of large coppice dunes will be bladed prior to pole installation to ease pole installation and create a service access line along the route. The project was initiated to comply with the requirements of Section 106 of the National Historic Preservation Act (NHPA) of 1966 as amended (PL-96-515) and guided by 36 CFR 800 as implemented through the Fort Bliss Programmatic Agreement and AR 200-4; the Archaeological and Historical Preservation Act (AHPA) of 1974 as amended (PL-93-291); the National Environmental Policy Act (NEPA) of 1969 (PL-90-190) as implemented by 40 CFR 6, 40 CFR 1500-1508, 32 CFR 651, and AR 200-2; and Executive Order Number 11593 (Protection and Enhancement of the Environment). Five new sites were documented along the proposed power line corridor. Of these, only one was considered eligible for inclusion to the NRHP. Eight previously recorded sites lie along the proposed power line corridor. Of these, two (LA 97945 and LA 92563) have been recommended eligible for inclusion to the NRHP; three sites are recommended not eligible for the NRHP and have NM SHPO concurrence and are not considered further in this report as the project will have no effect. Three other sites were recently re-evaluated and found to be not eligible for the NRHP. The two eligible sites have been subjected to data recovery and are considered mitigated; the project will have no adverse affect at these sites. One site, LA 91032, was of undetermined eligibility and re-evaluated during the current project. This site was determined eligible for the NRHP and is currently within a Restricted Zone. The power line installation will have no adverse effect on the qualities that make this site eligible. In sum, the current project will have no adverse affect on any historic properties.
Publisher:
ISBN:
Category : Archaeological surveying
Languages : en
Pages : 60
Book Description
Between February 27 and March 7, 2008, archaeologists from the Fort Bliss Directorate of Public Works - Environment conducted a pedestrian survey of 24 acres for a proposed power line running from Range 47 to Range 48 and 49, Dona Ana Range, New Mexico. The APE is a 15 m wide by 6.4 mile long corridor that runs along an existing dirt road. The APE will have poles installed along the length of the corridor using a drilling rig. Areas of large coppice dunes will be bladed prior to pole installation to ease pole installation and create a service access line along the route. The project was initiated to comply with the requirements of Section 106 of the National Historic Preservation Act (NHPA) of 1966 as amended (PL-96-515) and guided by 36 CFR 800 as implemented through the Fort Bliss Programmatic Agreement and AR 200-4; the Archaeological and Historical Preservation Act (AHPA) of 1974 as amended (PL-93-291); the National Environmental Policy Act (NEPA) of 1969 (PL-90-190) as implemented by 40 CFR 6, 40 CFR 1500-1508, 32 CFR 651, and AR 200-2; and Executive Order Number 11593 (Protection and Enhancement of the Environment). Five new sites were documented along the proposed power line corridor. Of these, only one was considered eligible for inclusion to the NRHP. Eight previously recorded sites lie along the proposed power line corridor. Of these, two (LA 97945 and LA 92563) have been recommended eligible for inclusion to the NRHP; three sites are recommended not eligible for the NRHP and have NM SHPO concurrence and are not considered further in this report as the project will have no effect. Three other sites were recently re-evaluated and found to be not eligible for the NRHP. The two eligible sites have been subjected to data recovery and are considered mitigated; the project will have no adverse affect at these sites. One site, LA 91032, was of undetermined eligibility and re-evaluated during the current project. This site was determined eligible for the NRHP and is currently within a Restricted Zone. The power line installation will have no adverse effect on the qualities that make this site eligible. In sum, the current project will have no adverse affect on any historic properties.
A Cultural Resources Survey of the Proposed Panda Energy Power Plant in the Temple Southeast Industrial Park, Bell County, Texas
Author: Molly Ficklen Godwin
Publisher:
ISBN:
Category : Archaeological surveying
Languages : en
Pages : 40
Book Description
Publisher:
ISBN:
Category : Archaeological surveying
Languages : en
Pages : 40
Book Description
New Mexico Generating Station and Other Possible End Uses of the Ute Mountain Land Exchange, Public Service Company of New Mexico's Proposal D, Proposed Bisti, De-na-zin and Ah-shi-sle-pah Wilderness Areas (1982)
Survey of a Proposed Power Line in Doña Ana County, New Mexico
Author: Patrick H. Beckett
Publisher:
ISBN:
Category : Archaeological surveying
Languages : en
Pages : 14
Book Description
Publisher:
ISBN:
Category : Archaeological surveying
Languages : en
Pages : 14
Book Description
A Cultural Resources Survey of the Proposed East Texas Electric Cooperative Power Plant Site, San Jacinto County, Texas
Author: Andrea Burden
Publisher:
ISBN:
Category : Archaeological surveying
Languages : en
Pages : 16
Book Description
Publisher:
ISBN:
Category : Archaeological surveying
Languages : en
Pages : 16
Book Description
A Cultural Resource Survey for a Proposed Installation and Upgrade of Electric Distribution Power Line Structures and Hardware in Sierra County, New Mexico
Author: Kathryn A. Donoho
Publisher:
ISBN:
Category : Archaeological surveying
Languages : en
Pages : 58
Book Description
Publisher:
ISBN:
Category : Archaeological surveying
Languages : en
Pages : 58
Book Description
The Cultural Resources of the Proposed New Mexico Generating Station Study Area, San Juan Basin, New Mexico
Author: Woodward-Clyde Consultants
Publisher:
ISBN:
Category : Coal-fired power plants
Languages : en
Pages :
Book Description
Publisher:
ISBN:
Category : Coal-fired power plants
Languages : en
Pages :
Book Description