Cost/Schedule Control Systems Criteria Interpretation Differences Between the DoD and Its Contractors

Cost/Schedule Control Systems Criteria Interpretation Differences Between the DoD and Its Contractors PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 241

Book Description
This study attempted to identify the major interpretive differences of the Cost/Schedule Control Systems Criteria (C/SCSC) between Department of Defense (DoD) and contractor performance management professionals, and to understand why these differences occurred. As the study progressed, its focus shifted to an evaluation of the Interpretive Guide, an Air Force Institute of Technology (AFIT) published document used to assist in the understanding of the criteria elements. The objective of the evaluation was to determine if the Interpretive Guide's explanations of the criteria elements were in consonance with the intent of the criteria and with current practice in the field of performance management. Research packages were distributed to and collected from performance management professionals in the DoD and its contractors. No distinct interpretative differences of the criteria were found between the two groups but a number of suggestions to improve the content of the Interpretive Guide were suggested; some of the recurring suggestions were to address the concept of integrated product teams and the development of procedures to streamline the area of variance analysis reporting. Respondents comments were published in an appendix and summarized within the text. Recommendations were to update the Interpretive Guide as well as to perform further research.

Cost/schedule Control Systems Criteria Interpretation Differences Between the DOD and Its Contractors

Cost/schedule Control Systems Criteria Interpretation Differences Between the DOD and Its Contractors PDF Author: Brian E. Hoffmann (CAPT, USAF., II)
Publisher:
ISBN:
Category : Cost control
Languages : en
Pages :

Book Description


Survey Relating to the Implementation of Cost/Schedule Control Systems Criteria Within the Department of Defense and Industry

Survey Relating to the Implementation of Cost/Schedule Control Systems Criteria Within the Department of Defense and Industry PDF Author: LITTLE (ARTHUR D) INC CAMBRIDGE MA.
Publisher:
ISBN:
Category :
Languages : en
Pages : 65

Book Description
Since 1967, the DOD has required its contractors to have cost and schedule performance measurement systems that satisfy certain criteria. These criteria are considered necessary to monitor and control contract performance. Specifically, the objectives of the criteria are for contractors to have cost and schedule control systems which accomplish both of the following: are effective for contractors in meeting their requirements for controlling contract performance; and Provide data which give an adequate basis for responsible decision-making by both contractor management and DoD components. The criteria, known as the Cost/Schedule Control Systems Criteria (C/SCSC), are applicable to selected contracts within programs designated as major system acquisitions. Over the years since 1967, controversies surrounding C/SCSC and associated reporting requirements have existed within industry and government. These controversies or issues can be categorized under two headings: (1) whether the costs of the criteria and associated reporting requirements outweigh their benefits, and (2) concerns about the specifies of how these requirements have been implemented.

Cost/schedule Control Systems Criteria

Cost/schedule Control Systems Criteria PDF Author: Quentin W. Fleming
Publisher: Irwin Professional Publishing
ISBN:
Category : Business & Economics
Languages : en
Pages : 558

Book Description


Survey Relating to the Implementation of Cost/Schedule Control Systems Criteria Within the Department of Defense and Industry. Phase I.

Survey Relating to the Implementation of Cost/Schedule Control Systems Criteria Within the Department of Defense and Industry. Phase I. PDF Author: LITTLE (ARTHUR D) INC CAMBRIDGE MA.
Publisher:
ISBN:
Category :
Languages : en
Pages : 219

Book Description
Since 1967, the Department of Defense (DOD) has required its contractors to have cost and schedule performance measurement systems that satisfy certain criteria. These criteria are deemed necessary to monitor and control contract performance. The criteria, known as the Cost/Schedule Control Systems Criteria (C/SCSC), are applicable to selected contracts (that are not firm fixed-price) within programs designated as major system acquisitions. Controversies surrounding C/SCSC and associated reporting requirements have existed within industry and government. These controversies or issues can be categorized under two headings: whether the costs of the criteria and associated reporting requirements outweigh their benefits and concerns about the specifics of how these requirements have been implemented. The purpose of the survey is to: Determine the degree of acceptance and use of the C/SCSC by defense contractors and government program managers; Identify problems and issues, the resolution of which could lead to improvements in the C/SCSC and contract performance measurement reporting requirements; and Recommend policy changes that will lead to these improvements and could be implemented by the Assistant Secretary of Defense (Comptroller).

Use of Contractor Cost and Schedule Control Systems for the SSN-21

Use of Contractor Cost and Schedule Control Systems for the SSN-21 PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 36

Book Description
The SSN-21 was one of nine programs included in the "Audit of the Effectiveness of DoD Use of Contractor Cost and Schedule Control System Data on Major Defense Acquisition Programs. The audit objective was to evaluate the effectiveness of the implementation and DoD oversight of cost and schedule control systems and the use of data reported by contractors complying with cost and schedule control system criteria.

Cost/schedule Control Systems Criteria (joint Implementation Procedures).

Cost/schedule Control Systems Criteria (joint Implementation Procedures). PDF Author: United States. Army Materiel Command
Publisher:
ISBN:
Category : Defense contracts
Languages : en
Pages : 68

Book Description


The Cost/Schedule Control System Criteria: A Case Study

The Cost/Schedule Control System Criteria: A Case Study PDF Author: Donald D. Wright
Publisher:
ISBN:
Category :
Languages : en
Pages : 122

Book Description
At present the Department of Defense Cost/Schedule Control System Criteria (C/SCSC) is still a relatively new concept for control of management information flow between DoD components and major defense contractors. Since it is new and represents a substantial departure in both philosophy and form from previously used systems, a serious lack of educational material exists. Since there was no material available of the self-contained case study type of a length reasonable for use in a graduate level course as an overview, this case study was developed. It is intended to be of use as an educational aid in presenting C/SCSC to a group composed primarily of Air Force Officers in a course on financial management.

Guide for Monitoring Contractors' Indirect Cost

Guide for Monitoring Contractors' Indirect Cost PDF Author: United States. Office of the Assistant Secretary of Defense (Installations and Logistics)
Publisher:
ISBN:
Category : Defense contracts
Languages : en
Pages : 116

Book Description


Kolcheff, Gauri

Kolcheff, Gauri PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Book Description