Albemarle RC&D Area, Edenton-Chowan County Schools Flood Prevention and Land Drainage Measure, Finding of No Significant Impact (FONSI) B1; Environmental Assessment (EA) PDF Download

Are you looking for read ebook online? Search for your book and save it on your Kindle device, PC, phones or tablets. Download Albemarle RC&D Area, Edenton-Chowan County Schools Flood Prevention and Land Drainage Measure, Finding of No Significant Impact (FONSI) B1; Environmental Assessment (EA) PDF full book. Access full book title Albemarle RC&D Area, Edenton-Chowan County Schools Flood Prevention and Land Drainage Measure, Finding of No Significant Impact (FONSI) B1; Environmental Assessment (EA) by . Download full books in PDF and EPUB format.

Albemarle RC&D Area, Edenton-Chowan County Schools Flood Prevention and Land Drainage Measure, Finding of No Significant Impact (FONSI) B1; Environmental Assessment (EA)

Albemarle RC&D Area, Edenton-Chowan County Schools Flood Prevention and Land Drainage Measure, Finding of No Significant Impact (FONSI) B1; Environmental Assessment (EA) PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 10

Book Description


Albemarle RC&D Area, Edenton-Chowan County Schools Flood Prevention and Land Drainage Measure, Finding of No Significant Impact (FONSI) B1; Environmental Assessment (EA)

Albemarle RC&D Area, Edenton-Chowan County Schools Flood Prevention and Land Drainage Measure, Finding of No Significant Impact (FONSI) B1; Environmental Assessment (EA) PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 10

Book Description


Cape Hatteras School Flood Prevention Measure, Albemarle RC&D Area, Dare County, Finding of No Significant Impact (FONSI) B1; Environmental Assessment (EA)

Cape Hatteras School Flood Prevention Measure, Albemarle RC&D Area, Dare County, Finding of No Significant Impact (FONSI) B1; Environmental Assessment (EA) PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 8

Book Description


Alburg School Land Drainage Measure Plan, Grand Isle County, Environmental Assessment (EA), Notice of a Finding of No Significant Impact (FONSI).

Alburg School Land Drainage Measure Plan, Grand Isle County, Environmental Assessment (EA), Notice of a Finding of No Significant Impact (FONSI). PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 10

Book Description


Environmental Assessment #271-A and Finding of No Significant Impact (FONSI)

Environmental Assessment #271-A and Finding of No Significant Impact (FONSI) PDF Author: United States. Army. Corps of Engineers
Publisher:
ISBN:
Category : Fisher School Basin (La.)
Languages : en
Pages : 21

Book Description


Fair Station Unit No.2 Balance Draft Conversion, Environmental Assessment (EA)-Finding of No Significant Impact (FONSI)-Environmental Report

Fair Station Unit No.2 Balance Draft Conversion, Environmental Assessment (EA)-Finding of No Significant Impact (FONSI)-Environmental Report PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 16

Book Description


Elk Creek Lake, Rogue River Basin, Oregon

Elk Creek Lake, Rogue River Basin, Oregon PDF Author:
Publisher:
ISBN:
Category : Dams
Languages : en
Pages : 124

Book Description


Final Environmental Impact Statement/environmental Impact Report, Petaluma River Flood Control Improvements Section 205

Final Environmental Impact Statement/environmental Impact Report, Petaluma River Flood Control Improvements Section 205 PDF Author:
Publisher:
ISBN:
Category : Flood control
Languages : en
Pages : 194

Book Description


Environmental Assessment and Finding of No Significant Impact: Interim Measures for the Mixed Waste Management Facility Groundwater at the Burial Ground Complex at the Savannah River Site

Environmental Assessment and Finding of No Significant Impact: Interim Measures for the Mixed Waste Management Facility Groundwater at the Burial Ground Complex at the Savannah River Site PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Book Description
The U.S. Department of Energy (DOE) prepared this environmental assessment (EA) to analyze the potential environmental impacts associated with the proposed interim measures for the Mixed Waste Management Facility (MW) groundwater at the Burial Ground Complex (BGC) at the Savannah River Site (SRS), located near Aiken, South Carolina. DOE proposes to install a small metal sheet pile dam to impound water around and over the BGC groundwater seepline. In addition, a drip irrigation system would be installed. Interim measures will also address the reduction of volatile organic compounds (VOCS) from ''hot-spot'' regions associated with the Southwest Plume Area (SWPA). This action is taken as an interim measure for the MWMF in cooperation with the South Carolina Department of Health and Environmental Control (SCDHEC) to reduce the amount of tritium seeping from the BGC southwest groundwater plume. The proposed action of this EA is being planned and would be implemented concurrent with a groundwater corrective action program under the Resource Conservation and Recovery Act (RCRA). On September 30, 1999, SCDHEC issued a modification to the SRS RCRA Part B permit that adds corrective action requirements for four plumes that are currently emanating from the BGC. One of those plumes is the southwest plume. The RCRA permit requires SRS to submit a corrective action plan (CAP) for the southwest plume by March 2000. The permit requires that the initial phase of the CAP prescribe a remedy that achieves a 70-percent reduction in the annual amount of tritium being released from the southwest plume area to Fourmile Branch, a nearby stream. Approval and actual implementation of the corrective measure in that CAP may take several years. As an interim measure, the actions described in this EA would manage the release of tritium from the southwest plume area until the final actions under the CAP can be implemented. This proposed action is expected to reduce the release of tritium from the southwest plume area to Fourmile Branch between 25 to 35 percent. If this proposed action is undertaken and its effectiveness is demonstrated, it may become a component of the final action in the CAP. This document was prepared in compliance with the National Environmental Policy Act (NEPA) of 1969, as amended; the requirements of the Council on Environmental Quality Regulations for Implementing NEPA (40 CFR 1500-1508); and the DOE Regulations for Implementing NEPA (10 CFR 1021). NEPA requires the assessment of environmental consequences of Federal actions that may affect the quality of the human environment. Based on the potential for impacts described herein, DOE will either publish a Finding of No Significant Impact (FONSI) or prepare an environmental impact statement (EM).

Taylor Roadside Erosion Critical Area Treatment RC&D Measure Plan, Measure Plan B1; Finding of No Significant Impact (FONSI)

Taylor Roadside Erosion Critical Area Treatment RC&D Measure Plan, Measure Plan B1; Finding of No Significant Impact (FONSI) PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 30

Book Description


Draft Environmental Assessment (EA) and draft Finding of No Significant Impact (FONSI) for partial funding of the construction and operation of a new Life Sciences Building at Brown University, Providence, Rhode Island

Draft Environmental Assessment (EA) and draft Finding of No Significant Impact (FONSI) for partial funding of the construction and operation of a new Life Sciences Building at Brown University, Providence, Rhode Island PDF Author:
Publisher:
ISBN:
Category : Environmental impact statements
Languages : en
Pages : 0

Book Description